912 resultados para PRODUCTION PLANNING AND SCHEDULING


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article describes a real-world production planning and scheduling problem occurring at an integrated pulp and paper mill (P&P) which manufactures paper for cardboard out of produced pulp. During the cooking of wood chips in the digester, two by-products are produced: the pulp itself (virgin fibers) and the waste stream known as black liquor. The former is then mixed with recycled fibers and processed in a paper machine. Here, due to significant sequence-dependent setups in paper type changeovers, sizing and sequencing of lots have to be made simultaneously in order to efficiently use capacity. The latter is converted into electrical energy using a set of evaporators, recovery boilers and counter-pressure turbines. The planning challenge is then to synchronize the material flow as it moves through the pulp and paper mills, and energy plant, maximizing customer demand (as backlogging is allowed), and minimizing operation costs. Due to the intensive capital feature of P&P, the output of the digester must be maximized. As the production bottleneck is not fixed, to tackle this problem we propose a new model that integrates the critical production units associated to the pulp and paper mills, and energy plant for the first time. Simple stochastic mixed integer programming based local search heuristics are developed to obtain good feasible solutions for the problem. The benefits of integrating the three stages are discussed. The proposed approaches are tested on real-world data. Our work may help P&P companies to increase their competitiveness and reactiveness in dealing with demand pattern oscillations. (C) 2012 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning,mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective and efficient implementation of intelligent and/or recently emerged networked manufacturing systems require an enterprise level integration. The networked manufacturing offers several advantages in the current competitive atmosphere by way to reduce, by shortening manufacturing cycle time and maintaining the production flexibility thereby achieving several feasible process plans. The first step in this direction is to integrate manufacturing functions such as process planning and scheduling for multi-jobs in a network based manufacturing system. It is difficult to determine a proper plan that meets conflicting objectives simultaneously. This paper describes a mobile-agent based negotiation approach to integrate manufacturing functions in a distributed manner; and its fundamental framework and functions are presented. Moreover, ontology has been constructed by using the Protégé software which possesses the flexibility to convert knowledge into Extensible Markup Language (XML) schema of Web Ontology Language (OWL) documents. The generated XML schemas have been used to transfer information throughout the manufacturing network for the intelligent interoperable integration of product data models and manufacturing resources. To validate the feasibility of the proposed approach, an illustrative example along with varied production environments that includes production demand fluctuations is presented and compared the proposed approach performance and its effectiveness with evolutionary algorithm based Hybrid Dynamic-DNA (HD-DNA) algorithm. The results show that the proposed scheme is very effective and reasonably acceptable for integration of manufacturing functions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We address the problem of jointly determining shipment planning and scheduling decisions with the presence of multiple shipment modes. We consider long lead time, less expensive sea shipment mode, and short lead time but expensive air shipment modes. Existing research on multiple shipment modes largely address the short term scheduling decisions only. Motivated by an industrial problem where planning decisions are independent of the scheduling decisions, we investigate the benefits of integrating the two sets of decisions. We develop sequence of mathematical models to address the planning and scheduling decisions. Preliminary computational results indicate improved performance of the integrated approach over some of the existing policies used in real-life situations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction Planning and Scheduling is taught for the fIrst time ill Semester 2, 2004 in the School of Architecture and Building, Deakin University. During the unit development process and the implementation of teaching activities, several issues arose in relation to implementing computer-aided construction scheduling and unit delivery in a unitary environment. Although various types of construction planning and scheduling software have been developed and applied, none of them can be run inside an online teaching software package, which provides powerful functions in administration. This research aims to explore the strategies to connect a project planning and scheduling software package and an online ~aching and learning software package by a Web-based support platform so that both the lecturer and students can draw up and communicate a construction plan or schedule with tables and fIgures. The key techniques of this supportive platfonn are idt;nlifies and they include a web-based graphically user-interfaced, dynamic and distributed multimedia data acquisition mechanism, which accepts users' drawings and retrieval information from canvas and stores the multimedia data ona server for further usage. This paper demonstrates the techniques and principals needed to construct such a multimedia data acquisition tool. This. research will fill the gap.in the literature in respect to an online pedagogical solution to an existing problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes a multi-level system dynamics (SD) / discrete event simulation (DES) approach for assessing planning and scheduling problems within an aviation training continuum. The aviation training continuum is a complex system, consisting of multiple aviation schools interacting through interschool student and instructor flows that are affected by external triggers such as resource availability and the weather.
SD was used to model the overall training continuum at a macro level to ascertain relationships between system entities. SD also assisted in developing a shared understanding of the training continuum, which involves constructing the definitions of the training requirements, resources and policy objectives. An end-to-end model of the continuum is easy to relate to, while dynamic visualisation of system behaviour provides a method for exploration of the model.
DES was used for micro level exploration of an individual school within the training continuum to capture the physical aspects of the system including resource capacity requirements, bottlenecks and student waiting times. It was also used to model stochastic events such as weather and student availability. DES has the advantage of being able to represent system variability and accurately reflect the limitations imposed on a system by resource constraints.
Through sharing results between the models, we demonstrate a multi-level approach to the analysis of the overall continuum. The SD model provides the school’s targeted demand to the DES model. The detailed DES model is able to assess schedules in the presence of resource constraints and variability and provide the expected capacity of a school to the high level SD model, subjected to constraints such as instructor availability or budgeted number of training systems. The SD model allows stakeholders to assess how policy and planning affect the continuum, both in the short and the long term.
The development of this approach permits moving the analysis of the continuum between SD and DES models as appropriate for given system entities, scales and tasks. The resultant model outcomes are propagated between the continuum and the detailed DES model, iteratively generating an assessment of the entire set of plans and schedule across the continuum. Combining data and information between SD and DES models and techniques assures relevance to the stakeholder needs and effective problem scoping and scaling that can also evolve with dynamic architecture and policy requirements.
An example case study shows the combined use of the two models and how they are used to evaluate a typical scenario where increased demand is placed on the training continuum. The multi-level approach provides a high level indication of training requirements to the model of the new training school, where the detailed model indicates the resources required to achieve those particular student levels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Research, Washington, D.C.