900 resultados para Nullity of contract
Resumo:
This article examines contemporary feminist arguments about contract. It does not aim to advance new arguments for or against contract but to call into question the dominant feminist position which is that contract has to be cast aside and/or that alternative approaches to contract have to be developed in order to advance the position of women. In a reworking of Elizabeth Kingdom's anti-essentialist approach to rights, Sullivan argues that a feminist but non-essentialist approach to contract is both possible and desirable. Sullivan explores a number of concrete situations in the Australian context where contract approaches have been deployed in law and public policy and demonstrates that contract may be detrimental or advantageous to the position of women. Sullivan argues, therefore, for a strategic and critical feminist approach to the utilisation of the language and practice of contract.
Resumo:
ABSTRACT We propose a model to explain how contract terms are selected in the presence of a form of economic power: contract power. The orange juice sector is used to illustrate an analysis that demonstrates the effects of contract power on the economic organization of the sector. We define contract power as the ability to exploit contractual gaps or failures of contractual provisions, which are strategically left incomplete. Empirical evidence from content analysis of antitrust documents supports the logic of contract power in the orange juice sector in three forms: avoiding changes to payment methods from weight to solid contents (quality); using information asymmetries to manipulate indexes that calculate the formula of orange prices; and deliberately harvesting oranges late in order to dehydrate the fruit, which consequently reduces weight and price. The paper contributes to understanding the selection of contract terms and the debate about how antitrust offices can deal with this issue.
Resumo:
Twelve regularly scheduled lettings and two emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $625,486,614 were approved.
Resumo:
The article examines public-private sector wage differentials in Spain using microdata from the Structure of Earnings Survey (Encuesta de Estructura Salarial). When applying various decomposition techniques, we find that it is important to distinguish by gender and type of contract. Our results also highlight the presence of a positive wage premium for public sector workers that can be partially explained by their better endowment of characteristics, in particular by the characteristics of the establishment where they work. The wage premium is greater for female and fixed-term employees and falls across the wage distribution, being negative for more highly skilled workers.
Resumo:
The article examines public-private sector wage differentials in Spain using microdata from the Structure of Earnings Survey (Encuesta de Estructura Salarial). When applying various decomposition techniques, we find that it is important to distinguish by gender and type of contract. Our results also highlight the presence of a positive wage premium for public sector workers that can be partially explained by their better endowment of characteristics, in particular by the characteristics of the establishment where they work. The wage premium is greater for female and fixed-term employees and falls across the wage distribution, being negative for more highly skilled workers.
Resumo:
Good faith plays a central role in most legal systems, yet appears to be an intractable concept. This article proposes to analyse it economically as the absence of opportunism in circumstances which lend themselves to it. One of the objectives underlying the law of contract on an economic view is to curtail opportunism. In spelling out what this means, the paper proposes a three-step test: bad faith is present where a substantial informational or other asymmetry exists between the parties, which one of them turns into an undue advantage, considered against the gains both parties could normally expect to realise through the contract, and where loss to the disadvantaged party is so serious as to provoke recourse to expensive self-protection, which significantly raises transactions costs in the market. The three-step test is then used to analyse a set of recent decisions in international commercial transactions and three concepts derived from good faith: fraud, warranty for latent defects and lesion.
Resumo:
Cet article sera publié dans Ghent Encyclopedia of Law and Economics, Gerrit De Geest (General Editor), 2nd edition, Cheltenham, Edward Elgar, 2010.
Resumo:
Thèse numérisée par la Division de la gestion de documents et des archives de l'Université de Montréal
Resumo:
In trademark systems such as the Andean Community, a state authority verifiesthat the marks are distinctive, lawful and do not affect third parties, and after that,given their ownership. In this context, particular interest has sparked the possibilityof individuals by agreements or statements of co-existence, are who ensure that theirsigns meet the conditions for simultaneous registrations.Such agreements for the coexistence of marks are problematic if one thinks thatthe holders of interests that would be available also seem to matter to consumers,competitors and the market. Therefore, define the scope of contractual freedom inthe field of trademark law, whose rules are considered imperative, acquire practicaland theoretical importance because its realization i) recognizes the risks that maybe relevant to evaluating trade agreements and ii) contributes to debates on the roleof private autonomy in areas reserved for non-derogable norms. Thus, this researchputs the declarations of consent for the coexistence of registrations in Colombia, ina larger scope of the limits of freedom of contract.
Resumo:
Cash retention is a common means of protecting an employer from a contractor's insolvency as well as ensuring that contractors finish the work that they start. Similarly, contractors withhold part of payments due to their sub-contractors. Larger contracts tend to be subjected to smaller rates of retention. By calculating the cost of retention as an amount per year of a contract, it is shown that retention is far more expensive for firms whose work consists of short contracts. The extra cost is multiplied when the final payment is delayed, as it often is for those whose work takes place at the beginning of a project. This may explain why it is that main contractors are a lot less interested than sub-contractors in alternatives to cash retention, such as retention bonds
Resumo:
FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.
Resumo:
Mirroring the paper versions exchanged between businesses today, electronic contracts offer the possibility of dynamic, automatic creation and enforcement of restrictions and compulsions on agent behaviour that are designed to ensure business objectives are met. However, where there are many contracts within a particular application, it can be difficult to determine whether the system can reliably fulfil them all; computer-parsable electronic contracts may allow such verification to be automated. In this paper, we describe a conceptual framework and architecture specification in which normative business contracts can be electronically represented, verified, established, renewed, etc. In particular, we aim to allow systems containing multiple contracts to be checked for conflicts and violations of business objectives. We illustrate the framework and architecture with an aerospace example.
Resumo:
In the domain of aerospace aftermarkets, which often has long supply chains that feed into the maintenance of aircraft, contracts are used to establish agreements between aircraft operators and maintenance suppliers. However, violations at the bottom of the supply chain (part suppliers) can easily cascade to the top (aircraft operators), making it difficult to determine the source of the violation, and seek to address it. In this context, we have developed a global monitoring architecture that ensures the detection of norm violations and generates explanations for the origin of violations. In this paper, we describe the implementation and deployment of a global monitor in the aerospace domain of [8] and show how it generates explanations for violations within the maintenance supply chain. We show how these explanations can be used not only to detect violations at runtime, but also to uncover potential problems in contracts before their deployment, thus improving them.
Resumo:
Estimate for $5942.68 for the completion of the interior fixtures of University Hall including folding doors, pew arrangement in the chapel, and architraves to doors, windows, and fireplaces.