898 resultados para Maintenance, Rehabilitation, Budget Estimate, Roads, Asset Management
Resumo:
Most local agencies in Iowa currently make their pavement treatment decisions based on their limited experience due primarily to lack of a systematic decision-making framework and a decision-aid tool. The lack of objective condition assessment data of agency pavements also contributes to this problem. This study developed a systematic pavement treatment selection framework for local agencies to assist them in selecting the most appropriate treatment and to help justify their maintenance and rehabilitation decisions. The framework is based on an extensive literature review of the various pavement treatment techniques in terms of their technical applicability and limitations, meaningful practices of neighboring states, and the results of a survey of local agencies. The treatment selection framework involves three different steps: pavement condition assessment, selection of technically feasible treatments using decision trees, and selection of the most appropriate treatment considering the return-on-investment (ROI) and other non-economic factors. An Excel-based spreadsheet tool that automates the treatment selection framework was also developed, along with a standalone user guide for the tool. The Pavement Treatment Selection Tool (PTST) for Local Agencies allows users to enter the severity and extent levels of existing distresses and then, recommends a set of technically feasible treatments. The tool also evaluates the ROI of each feasible treatment and, if necessary, it can also evaluate the non-economic value of each treatment option to help determine the most appropriate treatment for the pavement. It is expected that the framework and tool will help local agencies improve their pavement asset management practices significantly and make better economic and defensible decisions on pavement treatment selection.
Resumo:
Condition monitoring systems for physical assets are constantly becoming more and more common in the industrial sector. At the same time an increasing portion of asset monitoring systems are being remotely supported. As global competitors are actively developing solutions for condition monitoring and condition-based maintenance, which it enables, Wärtsilä too feels the pressure to provide customers with more sophisticated condition-based maintenance solutions. The main aim of this thesis study is to consider Wärtsilä remote condition monitoring solutions and how they relate to similar solutions from other suppliers and end customers’ needs, in the context of offshore assets. A theoretical study is also included in the thesis, where the concepts of condition monitoring, condition-based maintenance, maintenance management and physical asset management are introduced.
Resumo:
Asset Management (AM) is a set of procedures operable at the strategic-tacticaloperational level, for the management of the physical asset’s performance, associated risks and costs within its whole life-cycle. AM combines the engineering, managerial and informatics points of view. In addition to internal drivers, AM is driven by the demands of customers (social pull) and regulators (environmental mandates and economic considerations). AM can follow either a top-down or a bottom-up approach. Considering rehabilitation planning at the bottom-up level, the main issue would be to rehabilitate the right pipe at the right time with the right technique. Finding the right pipe may be possible and practicable, but determining the timeliness of the rehabilitation and the choice of the techniques adopted to rehabilitate is a bit abstruse. It is a truism that rehabilitating an asset too early is unwise, just as doing it late may have entailed extra expenses en route, in addition to the cost of the exercise of rehabilitation per se. One is confronted with a typical ‘Hamlet-isque dilemma’ – ‘to repair or not to repair’; or put in another way, ‘to replace or not to replace’. The decision in this case is governed by three factors, not necessarily interrelated – quality of customer service, costs and budget in the life cycle of the asset in question. The goal of replacement planning is to find the juncture in the asset’s life cycle where the cost of replacement is balanced by the rising maintenance costs and the declining level of service. System maintenance aims at improving performance and maintaining the asset in good working condition for as long as possible. Effective planning is used to target maintenance activities to meet these goals and minimize costly exigencies. The main objective of this dissertation is to develop a process-model for asset replacement planning. The aim of the model is to determine the optimal pipe replacement year by comparing, temporally, the annual operating and maintenance costs of the existing asset and the annuity of the investment in a new equivalent pipe, at the best market price. It is proposed that risk cost provide an appropriate framework to decide the balance between investment for replacing or operational expenditures for maintaining an asset. The model describes a practical approach to estimate when an asset should be replaced. A comprehensive list of criteria to be considered is outlined, the main criteria being a visà- vis between maintenance and replacement expenditures. The costs to maintain the assets should be described by a cost function related to the asset type, the risks to the safety of people and property owing to declining condition of asset, and the predicted frequency of failures. The cost functions reflect the condition of the existing asset at the time the decision to maintain or replace is taken: age, level of deterioration, risk of failure. The process model is applied in the wastewater network of Oslo, the capital city of Norway, and uses available real-world information to forecast life-cycle costs of maintenance and rehabilitation strategies and support infrastructure management decisions. The case study provides an insight into the various definitions of ‘asset lifetime’ – service life, economic life and physical life. The results recommend that one common value for lifetime should not be applied to the all the pipelines in the stock for investment planning in the long-term period; rather it would be wiser to define different values for different cohorts of pipelines to reduce the uncertainties associated with generalisations for simplification. It is envisaged that more criteria the municipality is able to include, to estimate maintenance costs for the existing assets, the more precise will the estimation of the expected service life be. The ability to include social costs enables to compute the asset life, not only based on its physical characterisation, but also on the sensitivity of network areas to social impact of failures. The type of economic analysis is very sensitive to model parameters that are difficult to determine accurately. The main value of this approach is the effort to demonstrate that it is possible to include, in decision-making, factors as the cost of the risk associated with a decline in level of performance, the level of this deterioration and the asset’s depreciation rate, without looking at age as the sole criterion for making decisions regarding replacements.
Resumo:
Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.
Resumo:
This project resulted in the development of a framework for making asset management decisions on low-volume bridges. The research focused on low-volume bridges located in the agricultural counties of Iowa because recent research has shown that these counties have the greatest percentage of structurally deficient bridges in the nation. Many of the same counties also have the highest crop yields in the state, creating a situation where detours caused by deficient bridges on farm-to-market roads increase the cost to transport the crops. Thus, the research proposed the use of social return on investment (SROI), a tool used by international institutions such as the World Bank, as an asset management metric to gauge to the socioeconomic impact of structurally deficient bridges on the state in an effort to provide quantified justification to fund improvements on low-volume assets such as these rural bridges. The study found that combining SROI with current asset management metrics like average daily traffic (ADT) made it possible to prioritize the bridges in such a way that the limited resources available are allocated in a manner that promotes a more equitable distribution and that directly benefits the user, in this case Iowa farmers. The result is a system that more closely aligns itself with the spirit of MAP-21, in that infrastructure investments are used to facilitate economic growth for Iowa’s agricultural economy.
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.
Final Report (SPR Project 90-00-RB10-012) on the Maintenance Asset Management Project Phase II, 2013
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.
Resumo:
ABSTRACTThis study presents a contribution to the modeling of a computer application employing a method of serviceability performance for unpaved roads, aiming the management of maintenance/restoration activities of the primary surface layer. The proposed methodology consisted of field inspections during dry (April to September) and rainy (October to March) periods, during which objective evaluations were performed to survey of defects and their densities and degrees of severity. To aid the functional classification of analyzed road sections and the determination of the defect with major influence on the serviceability of these roads, the method of serviceability performance proposed by Silva (2009)was implemented in the Visual Basic for Applications (VBA) language in Microsoft Excel software. With the use of the computer application proposed it was possible to identify among the defects analyzed in field, through the index of serviceability of the sampling unit per defect type (ISUdef), which one had the greatest influence on determining the relative serviceability index per road section (IST). The results allow us to conclude that the computer application Road achieved satisfactory results, since the objective evaluation criteria applied to road sections denotes consistency regarding their serviceability.
Resumo:
The tightening competition and increasing dynamism have created an emerging need for flexible asset management. This means that the changes of market demand should be responded to with adjustments in the amount of assets tied to the balance sheets of companies. On the other hand, industrial maintenance has recently experienced drastic changes, which have led to an increase in the number of maintenance networks (consisting of customer companies that buy maintenance services, as well as various supplier companies) and inter-organizational partnerships. However, the research on maintenance networks has not followed the changes in the industry. Instead, there is a growing need for new ways of collaboration between partnering companies to enhance the competitiveness of the whole maintenance network. In addition, it is more and more common for companies to pursue lean operations in their businesses. This thesis shows how flexible asset management can increase the profitability of maintenance companies and networks under dynamic operating conditions, and how the additional value can then be shared between the network partners. Firstly, I have conducted a systematic literature review to identify what kind of requirements for asset management models are set by the increasing dynamism. Then I have responded to these requirements by constructing an analytical model for flexible asset management, linking asset management to the profitability and financial state of a company. The thesis uses the model to show how flexible asset management can increase profitability in maintenance companies and networks, and how the created value can be shared in the networks to reach a win-win situation. The research indicates that the existing models for asset management are heterogeneous by nature due to the various definitions of ‘asset management’. I conclude that there is a need for practical asset management models which address assets comprehensively with an inter-organizational, strategic view. The comprehensive perspective, taking all kinds of asset types into account, is needed to integrate the research on asset management with the strategic management of companies and networks. I will show that maintenance companies can improve their profitability by increasing the flexibility of their assets. In maintenance networks, reorganizing the ownership of the assets among the different network partners can create additional value. Finally, I will introduce flexible asset management contracts for maintenance networks. These contracts address the value sharing related to reorganizing the ownership of assets according to the principles of win-win situations.
Resumo:
Historically SCDOT ranks in the top 10 each year for highway conditions and cost-effectiveness as rated by the Reason Foundation. With billions of dollars invested and billions to be invested it makes sense to invest the public's tax dollars as wisely as possible. Therefore, assessing what we have or better yet what condition what we have is in can be vital to public safety and setting priorities. The focus of this project is on the maintenance responsibility of Roadway Inspection as outlined in SCDOT Engineering Directive Memorandum #8. This memorandum is a portion of the way SCDOT provides for the safety of the traveling public and keeps South Carolina's most expensive asset in working order.
Resumo:
The purpose of this Master´s Thesis is to develop asset management and its practices in case company. District heating and cooling systems operated by case company around Finland, Sweden, Poland and the Baltics form an enormous-sized asset base where some parts are starting to reach their end of life-cycles. Large-sized asset renewal actions are under discussion and maintenance spending is increasing. Financially justified decisions in changing business environment are needed. Asset management is one of the most important concepts for production organization which operates with capital-intensive production assets. Organizations profitability is highly dependent on assets´ performance. Such assets, like district heating and cooling systems, should be utilized as efficiently as possible within their life-cycles but also maintained and renewed optimally. In this qualitative thesis, empirical interview study was conducted to describe the current situation on how the assets are managed in the case company and to examine the readiness to implement a new, risk-based solution. Asset management revealed to be a very well-known concept. From proposed risk-based asset management point of view, several key observations were made. It was seen as a suitable solution, but further development will be needed. Based on the need and findings, several key processes and frameworks were created and also tested with a case study. Assets` condition monitoring should be improved, which would have a positive impact on event probability assessment. Risk acceptance is also a thing to be discussed further. When the evaluation becomes fluent in single investment cases, portfolio-level expansion should be considered and started. As a result, thesis proposes a solution how risk-based asset management could be performed practically in a capital-intensive case company in order to optimize the maintenance spending in a long run. Created practical framework is made universal: similar principles can be applied into multiple cases in case company but also in other energy companies. Risk-based asset management`s benefits could be utilized best in portfolio-level optimization where the capital would be invested to the most important objects from total risk point of view. Eventually, such approach would allow case company to optimize capital spending in a situation where funds are not adequate to cover all the mandatory needs and prioritization between the investment alternatives will truly be needed.
Resumo:
"HRDS-06/10-05(1M)E"--P. [4] of cover.
Resumo:
This research investigates technology transfer (TT) to developing countries, with specific reference to South Africa. Particular attention is paid to physical asset management, which includes the maintenance of plant, equipment and facilities. The research is case based, comprising a main case study (the South African electricity utility, Eskom) and four mini-cases. A five level framework adapted from Salami and Reavill (1997) is used as the methodological basis for the formulation of the research questions. This deals with technology selection, and management issues including implementation and maintenance and evaluation and modifications. The findings suggest the Salami and Reavill (1997) framework is a useful guide for TT. The case organisations did not introduce technology for strategic advantage, but to achieve operational efficiencies through cost reduction, higher quality and the ability to meet customer demand. Acquirers favour standardised technologies with which they are familiar. Cost-benefit evaluations have limited use in technology acquisition decisions. Users rely on supplier expertise to compensate for poor education and technical training in South Africa. The impact of political and economic factors is more evident in Eskom than in the mini-cases. Physical asset management follows traditional preventive maintenance practices, with limited use of new maintenance management thinking. Few modifications of the technology or R&D innovations take place. Little use is made of explicit knowledge from computerised maintenance management systems. Low operating and maintenance skills are not conducive to the transfer of high-technology equipment. South African organisations acquire technology as items of plant, equipment and systems, but limited transfer of technology takes place. This suggests that operators and maintainers frequently do not understand the underlying technology, and like workers elsewhere, are not always inclined towards adopting technology in the workplace.
Resumo:
Dissertação apresentada para cumprimento dos requisitos necessários à obtenção do grau de Mestre em Ciências da Informação e da Documentação na variante Arquivística