958 resultados para Long-term network planning
Resumo:
Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper
Resumo:
Evolving family structure and economic conditions may affect individuals' ability and willingness to plan for future long-term care (LTC) needs. We applied life course constructs to analyze focus group data from a study of family decision making about LTC insurance. Participants described how past exposure to caregiving motivated them to engage in LTC planning; in contrast, child rearing discouraged LTC planning. Perceived institutional and economic instability drove individuals to regard financial LTC planning as either a wise precaution or another risk. Perceived economic instability also shaped opinions that adult children are ill-equipped to support parents' LTC. Despite concerns about viability of social insurance programs, some participants described strategies to maximize gains from them. Changing norms around aging and family roles also affected expectations of an active older age, innovative LTC options, and limitations to adult children's involvement. Understanding life course context can inform policy efforts to encourage LTC planning.
Resumo:
This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.
Resumo:
A multi-agent system with a percolation approach to simulate the driving pattern of Plug-In Electric Vehicle (PEV), especially suited to simulate the PEVs behavior on any distribution systems, is presented. This tool intends to complement information about the driving patterns database on systems where that kind of information is not available. So, this paper aims to provide a framework that is able to work with any kind of technology and load generated of PEVs. The service zone is divided into several sub-zones, each subzone is considered as an independent agent identified with corresponding load level, and their relationships with the neighboring zones are represented as network probabilities. A percolation approach is used to characterize the autonomy of the battery of the PVEs to move through the city. The methodology is tested with data from a mid-size city real distribution system. The result shows the sub-area where the battery of PEVs will need to be recharge and gives the planners of distribution systems the necessary input for a medium to long term network planning in a smart grid environment. © 2012 IEEE.
Resumo:
The simulated annealing optimization technique has been successfully applied to a number of electrical engineering problems, including transmission system expansion planning. The method is general in the sense that it does not assume any particular property of the problem being solved, such as linearity or convexity. Moreover, it has the ability to provide solutions arbitrarily close to an optimum (i.e. it is asymptotically convergent) as the cooling process slows down. The drawback of the approach is the computational burden: finding optimal solutions may be extremely expensive in some cases. This paper presents a Parallel Simulated Annealing, PSA, algorithm for solving the long term transmission network expansion planning problem. A strategy that does not affect the basic convergence properties of the Sequential Simulated Annealing algorithm have been implementeded and tested. The paper investigates the conditions under which the parallel algorithm is most efficient. The parallel implementations have been tested on three example networks: a small 6-bus network, and two complex real-life networks. Excellent results are reported in the test section of the paper: in addition to reductions in computing times, the Parallel Simulated Annealing algorithm proposed in the paper has shown significant improvements in solution quality for the largest of the test networks.
Resumo:
Az EU-ban, a mai állapotok szerint, csak „transzferunióról” beszélhetünk és nem egységes piacról. Az eurós pénzfolyamatok eltorzítva közvetítik a versenyképességet is: mind az árukban és vagyontárgyakban, mind – főleg – a pénzügyi eszközökben megtestesült munkákat/teljesítményeket rosszul árazzák. Egy ilyen keretben különösen könnyen alakul ki az, amit potyautas-problémának nevezünk, vagyis ahol tényleges vagy mérhető teljesítményleadás, vagy éppen fizetés nélkül lehet fogyasztani, és túl olcsón lehet szabad forrásokhoz jutni. Az eurózóna számos közvetítő mechanizmusában is tökéletlen. A sok, szuverénadósság-présbe került tagország között van kicsi, közepes és nagy is. Ez a tény, valamint az általános növekedési és munkapiaci problémák, egyértelműen „rendszerszintű zavarokat” jeleznek, amelyeket ebben a dolgozatban teljesítmény közvetítési-átviteli problémának hívunk, és ezért egy szokatlan, ám annál beszédesebb, elektromosenergia-átviteli rendszeranalógiával segítünk értelmezni. Megmutatjuk, hogy egy jó nagyvállalat miért jobb pénzügyi tervező, mint egy azonos méretű állam. _____ Why are ill-defined transfer mechanisms diverting valuable assets and resources to the wrong destination within the EU? Why do we witness ongoing pressure in the EU banking sector and in government finances? We offer an unusual answer to these questions: we apply an analogy from physics (from an electric generation and distribution network) to show the transmission inefficiency and waste, respectively, of the EU distribution mechanisms. We demonstrate that there are inherent flaws in both the measurement and in the distribution of assets and resources amongst the key EU markets: goods, money and factor markets. In addition, we find that when international equalizer mechanism is at work (cohesion funds allocated), many of these equity functions are at risk with respect to their reliable measurement. Especially are at risk the metered load factors, likewise the loss/waste factors. The map of desired outcomes does not match the real outcome, since EUtransfers in general are put to work with low efficiency.
Resumo:
The International Long-Term Ecological Research (ILTER) network comprises > 600 scientific groups conducting site-based research within 40 countries. Its mission includes improving the understanding of global ecosystems and informs solutions to current and future environmental problems at the global scales. The ILTER network covers a wide range of social-ecological conditions and is aligned with the Programme on Ecosystem Change and Society (PECS) goals and approach. Our aim is to examine and develop the conceptual basis for proposed collaboration between ILTER and PECS. We describe how a coordinated effort of several contrasting LTER site-based research groups contributes to the understanding of how policies and technologies drive either toward or away from the sustainable delivery of ecosystem services. This effort is based on three tenets: transdisciplinary research; cross-scale interactions and subsequent dynamics; and an ecological stewardship orientation. The overarching goal is to design management practices taking into account trade-offs between using and conserving ecosystems toward more sustainable solutions. To that end, we propose a conceptual approach linking ecosystem integrity, ecosystem services, and stakeholder well-being, and as a way to analyze trade-offs among ecosystem services inherent in diverse management options. We also outline our methodological approach that includes: (i) monitoring and synthesis activities following spatial and temporal trends and changes on each site and by documenting cross-scale interactions; (ii) developing analytical tools for integration; (iii) promoting trans-site comparison; and (iv) developing conceptual tools to design adequate policies and management interventions to deal with trade-offs. Finally, we highlight the heterogeneity in the social-ecological setting encountered in a subset of 15 ILTER sites. These study cases are diverse enough to provide a broad cross-section of contrasting ecosystems with different policy and management drivers of ecosystem conversion; distinct trends of biodiversity change; different stakeholders’ preferences for ecosystem services; and diverse components of well-being issues.
Resumo:
We describe the design, development and learnings from the first phase of a rainforest ecological sensor network at Springbrook - part of a World Heritage precinct in South East Queensland. This first phase is part of a major initiative to develop the capability to provide reliable, long-term monitoring of rainforest ecosystems. We focus in particular on our analysis around energy and communication challenges which need to be solved to allow for reliable, long-term deployments in these types of environments.
Resumo:
On 17-20 July 2007, 45 experts on sea turtles, fisheries, conservation and finance from 10 countries convened at the Bellagio Sea Turtle Conservation Initiative workshop in Terengganu to focus on methods to save the imperiled Pacific leatherback from extinction. The group developed a strategic plan to guide the prioritization and long term financing of Pacific leatherback turtle conservation and recovery objectives. Participants identified critical conservation actions and agreed that a business plan is urgently needed to reverse the trajectory towards extinction of the Pacific leatherback. The conservation actions prioritized by the participants encompassed protecting nesting beaches including eggs and nesting females; reducing direct and indirect turtle take in coastal fisheries; and strengthening regional and sub-regional cooperation. The group committed to work together on fundraising and implementation of these urgent conservation actions. This report presents outputs and the plan that was produced from the workshop.
Resumo:
Long-term precipitation series are critical for understanding emerging changes to the hydrological cycle. To this end we construct a homogenized Island of Ireland Precipitation (IIP) network comprising 25 stations and a composite series covering the period 1850–2010, providing the second-longest regional precipitation archive in the British-Irish Isles. We expand the existing catalogue of long-term precipitation records for the island by recovering archived data for an additional eight stations. Following bridging and updating of stations HOMogenisation softwarE in R (HOMER) homogenization software is used to detect breaks using pairwise and joint detection. A total of 25 breakpoints are detected across 14 stations, and the majority (20) are corroborated by metadata. Assessment of variability and change in homogenized and extended precipitation records reveal positive (winter) and negative (summer) trends. Trends in records covering the typical period of digitization (1941 onwards) are not always representative of longer records. Furthermore, trends in post-homogenization series change magnitude and even direction at some stations. While cautionary flags are raised for some series, confidence in the derived network is high given attention paid to metadata, coherence of behaviour across the network and consistency of findings with other long-term climatic series such as England and Wales precipitation. As far as we are aware, this work represents the first application of HOMER to a long-term precipitation network and bodes well for use in other regions. It is expected that the homogenized IIP network will find wider utility in benchmarking and supporting climate services across the Island of Ireland, a sentinel location in the North Atlantic.
Resumo:
Research Proposal in SB.TV case study. New dimension to brand model for Web 2.0 success
Resumo:
Background. It has been suggested that the study of women who survive life-threatening complications related to pregnancy (maternal near-miss cases) may represent a practical alternative to surveillance of maternal morbidity/mortality since the number of cases is higher and the woman herself is able to provide information on the difficulties she faced and the long-term repercussions of the event. These repercussions, which may include sexual dysfunction, postpartum depression and posttraumatic stress disorder, may persist for prolonged periods of time, affecting women's quality of life and resulting in adverse effects to them and their babies. Objective. The aims of the present study are to create a nationwide network of scientific cooperation to carry out surveillance and estimate the frequency of maternal near-miss cases, to perform a multicenter investigation into the quality of care for women with severe complications of pregnancy, and to carry out a multidimensional evaluation of these women up to six months. Methods/Design. This project has two components: a multicenter, cross-sectional study to be implemented in 27 referral obstetric units in different geographical regions of Brazil, and a concurrent cohort study of multidimensional analysis. Over 12 months, investigators will perform prospective surveillance to identify all maternal complications. The population of the cross-sectional component will consist of all women surviving potentially life-threatening conditions (severe maternal complications) or life-threatening conditions (the maternal near miss criteria) and maternal deaths according to the new WHO definition and criteria. Data analysis will be performed in case subgroups according to the moment of occurrence and determining cause. Frequencies of near-miss and other severe maternal morbidity and the association between organ dysfunction and maternal death will be estimated. A proportion of cases identified in the cross-sectional study will comprise the cohort of women for the multidimensional analysis. Various aspects of the lives of women surviving severe maternal complications will be evaluated 3 and 6 months after the event and compared to a group of women who suffered no severe complications in pregnancy. Previously validated questionnaires will be used in the interviews to assess reproductive function, posttraumatic stress, functional capacity, quality of life, sexual function, postpartum depression and infant development. © 2009 Cecatti et al.