931 resultados para Lean six sigma


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diplomityössä tarkastellaan hitsaavan verkoston laadunhallintaa ja siinä ilmeneviä erilaisia ongelmakohtia. Tämän lisäksi työssä tarkastellaan kolmen eri laatutyökalun Lean, Six Sigma ja Total Welding Management soveltamista hitsaavan verkoston laadunhallinnassa. Teoriaosassa käsitellään sekä yleisesti että hitsauksen osalta laatua ja laadunhallintaa, sekä edellä mainittuja laatutyökaluja. Tutkimusosaan tietoja hitsaavista verkostoista kerättiin kaikkiaan kolmesta eri verkostosta. Näiden kerättyjen tietojen pohjalta tarkasteltiin valittujen laatutyökalujen soveltuvuutta verkostomaiseen käyttöön. Verkostoitunut toiminta aiheuttaa monia uusia haasteita yritysten laadunhallinnalle verrattuna yksittäisiin hitsaaviin yrityksiin. Suurimpia tutkimuksessa havaittuja ongelmakohtia ovat suunnittelun ja valmistuksen yhteistyön erilaiset puutteet, laatutasoon ja sen varmistukseen liittyvät asiat, sekä verkoston sisälle syntyvä niin sanottu hiljainen tieto ja sen häviäminen. Tutkimuksen tarkastelujen perusteella havaittiin, että kaikkien tutkimukseen valitun kolmen laatutyökalun soveltaminen myös verkostomaisessa toiminnassa on mahdollista, mutta se vaatii huomattavasti suurempaa työpanosta kuin soveltaminen yksittäisessä yrityksessä. Myös näiden kaikkien kolmen työkalun yhtä aikainen käyttö on mahdollista. Juuri oikean työkalun valitseminen kullekin hitsaavalle verkostolle vaatii tarkkaa perehtymistä verkostoon ja sen tilanteeseen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this research is to demonstrate the use of Lean Six Sigma methodology in a manufacturing lead time improvement project. Moreover, the goal is to develop working solutions for the target company to improve its manufacturing lead time. The theoretical background is achieved through exploring the literature of Six Sigma, Lean and Lean Six Sigma. The development will be done in collaboration with the related stakeholders, by following the Lean Six Sigma improvement process DMAIC and by analyzing the process data from the target company. The focus of this research is in demonstrating how to use Lean Six Sigma improvement process DMAIC in practice, rather than in comparing Lean Six Sigma to other improvement methodologies. In order to validate the manufacturing system’s current state, improvement potential and solutions, statistical tools such as linear regression analysis were used. This ensured that all the decisions were as heavily based on actual data as possible. As a result of this research, a set of solutions were developed and implemented in the target company. These solutions included batch size reduction, bottleneck shift, first-in first-out queuing and shifting a data entry task from production planners to line workers. With the use of these solutions, the target company was able to reduce its manufacturing lead time by over one third.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Imagine the potential implications of an organization whose business and IT processes are well aligned and are capable of reactively and proactively responding to the external and internal changes. The Philips IT Infrastructure and Operations department (I&O) is undergoing a series of transformation activities to help Philips business keeping up with the changes. I&O would serve a critical function in any business sectors; given that the I&O’s strategy switched from “design, build and run” to “specify, acquire and performance manage”, that function is amplified. In 2013, I&O’s biggest transforming programme I&O Futures engaged multiple interdisciplinary departments and programs on decommissioning legacy processes and restructuring new processes with respect to the Information Technology Internet Library (ITIL), helping I&O to achieve a common infrastructure and operating platform (CI&OP). The author joined I&O Futures in the early 2014 and contributed to the CI&OP release 1, during which a designed model Bing Box and its evaluations were conducted through the lens of six sigma’s structured define-measure-analyze-improve-control (DMAIC) improvement approach. This Bing Box model was intended to firstly combine business and IT principles, namely Lean IT, Agile, ITIL best practices, and Aspect-oriented programming (AOP) into a framework. Secondly, the author implemented the modularized optimization cycles according to the defined framework into Philips’ ITIL-based processes and, subsequently, to enhance business process performance as well as to increase efficiency of the optimization cycles. The unique of this thesis is that the Bing Box model not only provided comprehensive optimization approaches and principles for business process performance, but also integrated and standardized optimization modules for the optimization process itself. The research followed a design research guideline that seek to extend the boundaries of human and organizational capabilities by creating new and innovative artifacts. The Chapter 2 firstly reviewed the current research on Lean Six Sigma, Agile, AOP and ITIL, aiming at identifying the broad conceptual bases for this study. In Chapter 3, we included the process of constructing the Bing Box model. The Chapter 4 described the adoption of Bing Box model: two-implementation case validated by stakeholders through observations and interviews. Chapter 5 contained the concluding remarks, the limitation of this research work and the future research areas. Chapter 6 provided the references used in this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a growing search for continuous improvement within the companies which creates an obligation of reducing and when it is possible eliminating waste. Production Planning and Control Department (PCP) is not out of this question, making necessary the application of methods and creation of tools that eliminate steps which do not add value to the planning process. This paper aims to develop a tool which concentrates in just one place all the necessary information to make the packaging material requirement planning (MRP) in a agribusiness company. Besides, it also aims, in a more visual way and using devices that prevent mistakes (Poka-Yoke), to reduce the number of reviews and mistakes made by analysts. As a result, an Excel spreadsheet was developed. This spreadsheet shows what happens with the status of planning and receiving of packaging, giving some advices when some critical situation happens. The use of Lean Manufacturing Method and the action research method helped to well define the problem and to reduce the number of steps, spreadsheets and time of process in 80%, 60% and 75%, respectively

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aims to assess the implementation of Lean Six Sigma in the preparation of plates and hot lamination process for a company of aluminum rolled products, to improve the quality, productivity and process efficiency. As a basis for achieving these goals, the DMAIC methodology and various quality tools such as Cause Effect Diagram, Process Flow, SIPOC, Pareto, FMEA and Control Chart were used, trying to propose improvements to processes and increase their efficiency. The results were significant and were the basis for the continuation of a continuous improvement project throughout the factory

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the advent of a global economy, Lean Six Sigma meets the demand of new production process that creates products within the customer’s specification without any wastage. The objectives of this work is to use the concepts Lean Manufacturing and Six Sigma parallel to minimize costs, increase the customer base, reduce the delivery time which implies an increase in the turnover of products on the shelves in a packaging company. We used the DMAIC method to continue working. The method DMAIC indicated the main failure modes that were fixed in the step improve. At this stage the tools of Lean Manufacturing gain tremendous value by optimizing processes with defects. The conclusion involves an increase in monthly billing, a corporate restructuring and, finally, a renewal in how to conduct the work of management

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work evaluates the implementation of Lean Six Sigma into the Steam Turbine’s Blades Manufacturing Process, aiming to improve productivity, quality and operational efficiency. Therefore, several tools have been applied, such as VSM, Spaghetti Diagram, Ishikawa, Pareto, DMAIC, Benchmarking and Control Charts, seeking to propose process improvements, as well as Quality Indicators creation. It was obtained a significant waste reduction throughout the process, achieving a lead time reduction of 42% and 83,41% in transport. Also, were introduced the Lean Thinking concepts, such as pull production and Continuous material flow. At the same time, it was possible to calculate the process capability and the sigma level, evaluating and proposing some improvements

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In questo momento i servizi costituiscono il principale settore d’impiego e la maggior fonte di reddito per le economie sviluppate, rappresentando circa tre quarti del prodotto interno lordo sia negli Stati Uniti che nel Regno Unito. (Piercy e Rich, 2009) Nonostante però questa notevole importanza per l’economia, le organizzazioni di questo settore non riescono a fornire dei servizi di qualità tale da soddisfare le richieste dei clienti. (Piercy e Rich, 2009) Ancora più preoccupante è il risultato degli indicatori che forniscono un livello di qualità dei servizi in calo di anno in anno. (Dickson et al., 2005) Questo lavoro di tesi si occupa di analizzare il Lean Six Sigma come metodologia di cambiamento organizzativo e miglioramento dei processi aziendali, nel contesto dei servizi e in modo particolare in quelli finanziari. L’obiettivo di questo lavoro è quello di presentare il Lean Six Sigma applicato ai servizi analizzando i fattori critici di successo, i fattori ostativi, le barriere organizzative interne, le differenze tra il settore manifatturiero e quello dei servizi, gli strumenti, gli obiettivi e i benefici introdotti. Si vuole inoltre indagare l’applicazione di tale metodologia a un’azienda italiana di piccole e medie dimensioni esaminando le caratteristiche da tenere in considerazione durante la sua implementazione.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The application of Lean Six Sigma (LSS) varies in different regions of the world in terms of both level of understanding and acceptability. Employing a qualitative methodological approach, this paper aims to explore factors hindering the acceptability of the LSS initiative in organizations and list factors required for successful application and implementation in a developing economy from the perspective of LSS consultants. Using Nigeria as a case study, primary data were collected though a number of semi-structured interviews with representatives of leading continuous improvement consultancy firms in Nigeria. Finding draws out links between major factors such as drivers and motivation, LSS performance, marketability and challenges to the acceptability and applicability of LSS in Nigeria. Further findings highlight major factors such as lack of management buy-in, level of awareness, certification driven market, Nigerian environment and culture, etc as problems that hinder successful implementation of LSS in Nigeria. This paper contributes to the theoretical foundation of critical success factors required for the implementation of Lean Six Sigma, with results from the experience of a developing economy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few people see both opportunities and threats coming from IT legacy in current world. On one hand, effective legacy management can bring substantial hard savings and smooth transition to the desired future state. On the other hand, its mismanagement contributes to serious operational business risks, as old systems are not as reliable as it is required by the business users. This thesis offers one perspective of dealing with IT legacy – through effective contract management, as a component towards achieving Procurement Excellence in IT, thus bridging IT delivery departments, IT procurement, business units, and suppliers. It developed a model for assessing the impact of improvements on contract management process and set of tools and advices with regards to analysis and improvement actions. The thesis conducted case study to present and justify the implementation of Lean Six Sigma in IT legacy contract management environment. Lean Six Sigma proved to be successful and this thesis presents and discusses all the steps necessary, and pitfalls to avoid, to achieve breakthrough improvement in IT contract management process performance. For the IT legacy contract management process two improvements require special attention and can be easily copied to any organization. First is the issue of diluted contract ownership that stops all the improvements, as people do not know who is responsible for performing those actions. Second is the contract management performance evaluation tool, which can be used for monitoring, identifying outlying contracts and opportunities for improvements in the process. The study resulted in a valuable insight on the benefits of applying Lean Six Sigma to improve IT legacy contract management, as well as on how Lean Six Sigma can be applied in IT environment. Managerial implications are discussed. It is concluded that the use of data-driven Lean Six Sigma methodology for improving the existing IT contract management processes is a significant addition to the existing best practices in contract management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this project, I examine current forms of scientific management systems, Lean and Six Sigma, as they relate to technical communication. With the goal of breaking work up into standardized processes in order to cut costs and increase efficiency, Lean, Six Sigma and Lean Six Sigma hybrid systems are increasingly applied beyond manufacturing operations to service and other types of organizational work, including technical communication. By consulting scholarship from fields such as business, management, and engineering, and analyzing government Lean Six Sigma documentation, I investigate how these systems influence technical communication knowledge and practice in the workplace. I draw out the consequences of system-generated power structures as they affect knowledge work, like technical communication practice, when it is reduced to process. In pointing out the problems these systems have in managing knowledge work, I also ask how technical communication might shape them.