990 resultados para Last planner system
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do Grau Mestre em Engenharia Civil – Perfil de Construção
Resumo:
21st Annual Conference of the International Group for Lean Construction – IGLC 21 – Fortaleza, Brazil
Resumo:
La enseñanza de Gestión del Proceso Constructivo en el grado de Arquitectura Técnica se realiza actualmente siguiendo un esquema teórico-práctico. A través de clases magistrales se define el proceso constructivo de una edificación y la relación e interdependencia entre los oficios. Estos contenidos se refuerzan en las sesiones prácticas a través de la herramienta gráfica diagrama de Gantt, donde el alumno se enfrenta de manera individual a la planificación de la obra siguiendo los criterios estipulados en la asignatura. Esta metodología no permite a los estudiantes enfrentarse a los problemas frecuentes de re-planificación y gestión de imprevistos en el entorno de la construcción. Como consecuencia, se plantea una propuesta para la implementación de la herramienta Last Planner en la asignatura como sistema de planificación colaborativa basado en la filosofía Lean Construction. A través del uso de Last Planner como técnica de Gamificación se pretende dotar de dinamismo a las sesiones teórico-prácticas. En cada sesión se simularán diferentes escenarios que requieran procesos constructivos variados, favoreciendo la motivación del alumnado, su capacidad para aprender y proponer soluciones justificadas huyendo de soluciones rígidas y estándar, y el trabajo en equipo de forma colaborativa.
Resumo:
Trabalho de Projeto
Resumo:
21th Annual Conference of the International Group for Lean Construction (IGLC 21), July 2013, Fortaleza, Brazil
Resumo:
Dissertação para obtenção do Grau Mestre em Engenharia Civil – Perfil de Construção
Resumo:
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.
Resumo:
El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.
Resumo:
Proceedings IGLC-19, July 2011, Lima, Perú
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia Civil – Perfil de Construção
Resumo:
Com o objetivo de avaliar os efeitos do método de preparo do solo e do controle de plantas daninhas em resteva de aveia preta (Avena strigosa), na cultura da soja (Glycine max cv. 'IAC 14'), foi conduzido um experimento de campo na Fazenda Experimental Lageado - UNESP Botucatu - SP, em 1993/94. Os tratamentos de manejo do solo foram Plantio Direto e Plantio Convencional (preparado com uma aração e três gradagens). As formas de controle de plantas daninhas estudadas corresponderam a uma testemunha sem controle do mato; controle com uso exclusivo de herbicidas aplicados em préemergência (0,28 kg/ha de metribuzim + 1,29 kg/ha de orizalin); controle com uso exclusivo de herbicidas aplicados em pósemergência (0,25 kg/ha de fluazifop-p-butil + 0,25 kg/ha de fomesafen); controle com o uso conjunto dos tratamentos em pré e pós-emergência mencionados. Tanto no plantio direto quanto no convencional, utilizou-se glyphosate para a eliminação da aveia preta e das plantas daninhas antes da implantação da cultura. O delineamento experimental adotado foi de blocos ao acaso em parcelas subdivididas, com quatro repetições. Os tipos de manejo do solo foram aplicados às parcelas e os métodos de controle das plantas daninhas às sub-parcelas. Deve ser ressaltado que durante a fase inicial do ensaio, as chuvas foram escassas, limitando tanto o crescimento da cultura quanto a atuação dos herbicidas de pré-emergência e pósemergência. As avaliações baseadas na contagem do número de plantas/m2, realizadas aos 14, 28 e 35 dias após a emergência da cultura da soja, indicaram diferenças entre os métodos de preparo do solo e os métodos de controle. Entre as espécies daninhas mais freqüentes, Brachiaria plantaginea e Amaranthus viridis foram as predominantes no sistema de plantio convencional; estas espécies apresentaram pequena importância no plantio direto, no qual predominou Euphorbia heterophylla. No plantio convencional, os herbicidas de pré-emergência proporcionaram melhor controle de A. viridis do que de B. plantaginea; o controle com herbicidas pós-emergentes foi insatisfatório para ambas espécies. No plantio direto, o controle de E. heterophylla foi insatisfatório em todos os sistemas de controle testados. O plantio direto apresentou sempre menor número total de plantas daninhas, sobretudo de gramineas. A germinação de plantas daninhas limitou-se ao período de até 15 dias após a emergência da cultura, nos dois sistemas de cultivo.
Resumo:
This paper studies the energy consumption and subsequent CO2 emissions of road highway transportation under three toll systems in Spain for four categories of vehicles: cars, vans, buses and articulated trucks. The influence of toll systems is tested for a section of AP-41 highway between Toledo and Madrid. One system is free flow, other is traditional stop and go and the last toll system operates with an electronic toll collection (ETC) technology. Energy consumption and CO2 emissions were found to be closely related to vehicle mass, wind exposure, engine efficiency and acceleration rate. These parameters affect, directly or indirectly, the external forces which determine the energy consumption. Reducing the magnitude of these forces through an appropriate toll management is an important way of improving the energy performance of vehicles. The type of toll system used can have a major influence on the energy efficiency of highway transportation and therefore it is necessary to consider free flow.
Resumo:
Nos tempos que correm a gestão de topo das empresas tem como desafio adaptar-se às exigências do mercado, tendo em conta a crise atravessada nos diversos setores. O lean mais do que uma ferramenta, é uma filosofia de vida que visa a excelência. Esta filosofia contém dois pilares importantes, a melhoria contínua e o respeito pelas pessoas. A melhoria contínua pretendida visa a obtenção do valor esperado e definido perante um desafio. O lean é uma filosofia de gestão que nasce após a segunda guerra mundial caracterizado como sistema de produção enxuto que visa eliminação de desperdícios. Algumas empresas do setor da construção após verificar os resultados satisfatórios noutras áreas, impuseram a implementação da filosofia lean nas suas organizações. Esta implementação passa por adotar ferramentas que visam a eliminação de desperdícios, produção puxada e a flexibilidade de processos. A construção adotou ferramentas tais como: just in time, definição de valor, definição de desperdício, fluxo contínuo, task time, sistema puxado, poka-yoke, kanban, heijunka (nivelamento de produção), seis sigmas, last planner, kaizen, fluxo de valor, 5S`s. A presente tese pretende clarificar algumas destas ferramentas e conceitos, aproximando-os da área da construção. Inclui-se um questionário a um grupo de trabalhadores de uma empresa de construção que está na fase inicial de implementação do lean. O questionário visou entender em que fase se encontra a implementação e a importância dada ao tema pelos trabalhadores. Foram analisados alguns casos práticos onde a gestão da empresa decidiu implementar o lean.
Resumo:
Nos tempos que correm a gestão de topo das empresas tem como desafio adaptar-se às exigências do mercado, tendo em conta a crise atravessada nos diversos setores. O lean mais do que uma ferramenta, é uma filosofia de vida que visa a excelência. Esta filosofia contém dois pilares importantes, a melhoria contínua e o respeito pelas pessoas. A melhoria contínua pretendida visa a obtenção do valor esperado e definido perante um desafio. O lean é uma filosofia de gestão que nasce após a segunda guerra mundial caracterizado como sistema de produção enxuto que visa eliminação de desperdícios. Algumas empresas do setor da construção após verificar os resultados satisfatórios noutras áreas, impuseram a implementação da filosofia lean nas suas organizações. Esta implementação passa por adotar ferramentas que visam a eliminação de desperdícios, produção puxada e a flexibilidade de processos. A construção adotou ferramentas tais como: just in time, definição de valor, definição de desperdício, fluxo contínuo, task time, sistema puxado, poka-yoke, kanban, heijunka (nivelamento de produção), seis sigmas, last planner, kaizen, fluxo de valor, 5S`s. A presente tese pretende clarificar algumas destas ferramentas e conceitos, aproximando-os da área da construção. Inclui-se um questionário a um grupo de trabalhadores de uma empresa de construção que está na fase inicial de implementação do lean. O questionário visou entender em que fase se encontra a implementação e a importância dada ao tema pelos trabalhadores. Foram analisados alguns casos práticos onde a gestão da empresa decidiu implementar o lean.
Resumo:
The atmosphere is a global influence on the movement of heat and humidity between the continents, and thus significantly affects climate variability. Information about atmospheric circulation are of major importance for the understanding of different climatic conditions. Dust deposits from maar lakes and dry maars from the Eifel Volcanic Field (Germany) are therefore used as proxy data for the reconstruction of past aeolian dynamics.rnrnIn this thesis past two sediment cores from the Eifel region are examined: the core SM3 from Lake Schalkenmehren and the core DE3 from the Dehner dry maar. Both cores contain the tephra of the Laacher See eruption, which is dated to 12,900 before present. Taken together the cores cover the last 60,000 years: SM3 the Holocene and DE3 the marine isotope stages MIS-3 and MIS-2, respectively. The frequencies of glacial dust storm events and their paleo wind direction are detected by high resolution grain size and provenance analysis of the lake sediments. Therefore two different methods are applied: geochemical measurements of the sediment using µXRF-scanning and the particle analysis method RADIUS (rapid particle analysis of digital images by ultra-high-resolution scanning of thin sections).rnIt is shown that single dust layers in the lake sediment are characterized by an increased content of aeolian transported carbonate particles. The limestone-bearing Eifel-North-South zone is the most likely source for the carbonate rich aeolian dust in the lake sediments of the Dehner dry maar. The dry maar is located on the western side of the Eifel-North-South zone. Thus, carbonate rich aeolian sediment is most likely to be transported towards the Dehner dry maar within easterly winds. A methodology is developed which limits the detection to the aeolian transported carbonate particles in the sediment, the RADIUS-carbonate module.rnrnIn summary, during the marine isotope stage MIS-3 the storm frequency and the east wind frequency are both increased in comparison to MIS-2. These results leads to the suggestion that atmospheric circulation was affected by more turbulent conditions during MIS-3 in comparison to the more stable atmospheric circulation during the full glacial conditions of MIS-2.rnThe results of the investigations of the dust records are finally evaluated in relation a study of atmospheric general circulation models for a comprehensive interpretation. Here, AGCM experiments (ECHAM3 and ECHAM4) with different prescribed SST patterns are used to develop a synoptic interpretation of long-persisting east wind conditions and of east wind storm events, which are suggested to lead to an enhanced accumulation of sediment being transported by easterly winds to the proxy site of the Dehner dry maar.rnrnThe basic observations made on the proxy record are also illustrated in the 10 m-wind vectors in the different model experiments under glacial conditions with different prescribed sea surface temperature patterns. Furthermore, the analysis of long-persisting east wind conditions in the AGCM data shows a stronger seasonality under glacial conditions: all the different experiments are characterized by an increase of the relative importance of the LEWIC during spring and summer. The different glacial experiments consistently show a shift from a long-lasting high over the Baltic Sea towards the NW, directly above the Scandinavian Ice Sheet, together with contemporary enhanced westerly circulation over the North Atlantic.rnrnThis thesis is a comprehensive analysis of atmospheric circulation patterns during the last glacial period. It has been possible to reconstruct important elements of the glacial paleo climate in Central Europe. While the proxy data from sediment cores lead to a binary signal of the wind direction changes (east versus west wind), a synoptic interpretation using atmospheric circulation models is successful. This shows a possible distribution of high and low pressure areas and thus the direction and strength of wind fields which have the capacity to transport dust. In conclusion, the combination of numerical models, to enhance understanding of processes in the climate system, with proxy data from the environmental record is the key to a comprehensive approach to paleo climatic reconstruction.rn