948 resultados para Infrastructure and Construction Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reviews the technical features and requirements of Building Information Modelling (BIM)-servers as collaboration platforms for multi-disciplinary building and construction projects. Multi-disciplinary collaboration is the norm in the Architecture, Engineering, and Construction (AEC) industries, especially in complex projects. The widespread adoption of object-oriented Computer-aided Design (CAD) tools that support BIM capabilities has generated greater interest in model based exchange of information across disciplines and consultants who have traditionally collaborated through the frequent exchange of 2D drawings and documents. BIM-servers are collaboration platforms that are expected to provide the technical capability to support this inter-disciplinary exchange of 3D models in addition to intelligent management of the related drawings, documents and other forms of data. Since BIM-servers are a recent technical development a review of their technical features can help further development. This paper serves this objective by providing a review of the technical features and requirements for using BIM-servers as multi-disciplinary collaboration platforms on building and construction projects. The methodologies include focus group interviews (FIGs) with representatives from the diverse AEC disciplines, a case study on a state-of-the-art BIM-server, and a critical review and analysis of current collaboration platforms that are available to the AEC industries. This paper concludes that greater emphasis should be placed on supporting technical requirements to facilitate technology management and implementation across disciplines. Their implications for user-centric technology development in design and construction industry are also discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book brings together experts in the fields of spatial planning, landuse and infrastructure management to explore the emerging agenda of spatially-oriented integrated evaluation. It weaves together the latest theories, case studies, methods, policy and practice to examine and assess the values, impacts, benefits and the overall success in integrated land-use management. In doing so, the book clarifies the nature and roles of evaluation and puts forward guidance for future policy and practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report examines the involvement of manufacturers in value-adding through service-enhancement of product offerings. This focus has been prompted by:  emphasis in the knowledge-economy literature on the increasing role played by services in economic growth; and  recent analysis which suggests that the most dynamic sector of many economies is an integrated manufacturing-services sector (see Part One of this report). The report initially describes the emergence of an integrated manufacturing-services sector in the context of increasingly knowledge-based economic systems. Part Two reports on the results of a survey of manufacturers in the building and construction product system, investigating their involvement in service provision. Parts Three and Four present two case studies of exemplary manufacturers involved in adding value to their manufacturing operations through services offered on building and construction projects. The report examines manufacturers of materials, products, equipment and machinery used on building and construction projects. The two case study sections of the report, in part, focus on a major project undertaken by each of the manufacturers. This project element of activity is focussed on (as opposed to wholesale or retail supply), because this area of activity involves a broader array of service-enhancement mechanisms and more complex bundling of products and services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public engagement is an essential process for major municipal infrastructure and construction projects as it serves to identify the interests and concerns of citizens before the planning and design are finalised and thus ensures the schemes are beneficial to all sectors of the community. However, the success of public engagement depends on a number of factors, not least the suitability of the engagement methods used, representativeness and activeness of participants, time pressure, financial constraint and so on. In Hong Kong, the community has experienced discontent with several major projects recently, suggesting the need to examine the effectiveness of its current public engagement mechanism. This paper reports the results of a series of interviews with a variety of stakeholders – indicating the need for a carefully considered public engagement plan to be established at the beginning to drive the process and more experienced people to lead and facilitate the engagement process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.