1000 resultados para Girders -- Testing
Resumo:
Estudi experimental del comportament de bigues de formigó armades amb barres de materials compostos de matriu polimèrica (FRP)
Resumo:
A new steel girder bridge system was developed at the University of Nebraska. The innovative girder design is a box girder folded from a single steel plate that has a trapezoid shape with an opening on the bottom. The girder has application in short span bridges and accelerated construction situations. The structural performance of the girder requires investigation in all stages of a bridge’s lifecycle. This thesis contains descriptions and results from the first two tests from a series of tests developed to evaluate this new girder shape. The objective of these two tests was to investigate the constructability of the girders. During construction a bridge is in its least stable condition and it is important that the bridge components exhibit both adequate strength and stability during this critical stage. To this end, two girders were tested in flexure over a simple span as a non-composite beam simulating the loading the girders would be subjected to during construction. The results of the two tests indicate that the folded girder as a whole, and its components, provide adequate strength and stability at construction load levels. Failure occurred at loads that were above normal construction load levels and resulted in a ductile failure mode, which is a well documented benefit of steel components. The girders remained stable through all phases of loading including failure. The top flange was the weakest component of the beam during construction due to its role as a compression element that has a slender and un-braced form. The compression in the top flange caused local buckling in the top flange even at elastic load levels. This was the cause for loss of stiffness and failure in both specimens. Incorporation of a ridge at the center of the top flange of specimens, results of which are not reported in this thesis, proved to resolve this very early buckling issue.
Resumo:
For many years AASHTO provided no recommendation to state DOT’s on bottom flange confinement reinforcement for their bridge superstructures. The 1996 edition of AASHTO Standard Specification for Highway Bridges stated that nominal reinforcement be placed to enclose the prestressing steel from the end of the girder for at least a distance equal to the girder’s height. A few years later the 2004 AASHTO LRFD Bridge Design Specification changed the distance over which the confinement was to be distributed from 1.0h to 1.5h, and gave minimum requirements for the amount of steel to be used, No.3 bars, and their maximum spacing, not to exceed 6”. Research was undertaken to study what impact, if any, confinement reinforcement has on the performance of prestressed concrete bridge girders. Of particular interest was the effect confinement had on the transfer length, development length, and vertical shear capacity of the fore mentioned members. First, an analytical investigation was performed on the subject, and then an experimental investigation followed which consisted of designing, fabricating, and testing eight tee-girders and three NU1100 girders with particular attention paid to the amount and distribution of confinement reinforcement placed at the end of each girder. The results of the study show: 1) neither the amount or distribution of confinement reinforcement had a significant effect on the initial or final transfer length of the prestress strands; 2) at the AASHTO calculated development length, no significant impact from confinement was found on either the nominal flexural capacity of bridge girders or bond capacity of the prestressing steel; 3) the effects from varied confinement reinforcement on the shear resistance of girders tested was negligible, however, distribution of confinement did show to have an impact on the prestressed strands’ bond capacity; 4) confinement distribution across the entire girder did increase ductility and reduced cracking under extreme loading conditions.
Resumo:
Process modeling can be regarded as the currently most popular form of conceptual modeling. Research evidence illustrates how process modeling is applied across the different information system life cycle phases for a range of different applications, such as configuration of Enterprise Systems, workflow management, or software development. However, a detailed discussion of critical factors of the quality of process models is still missing. This paper proposes a framework consisting of six quality factors, which is derived from a comprehensive literature review. It then presents in a case study, a utility provider, who had designed various business process models for the selection of an Enterprise System. The paper summarizes potential means of conducting a successful process modeling initiative and evaluates the described modeling approach within the Guidelines of Modeling (GoM) framework. An outlook shows the potential lessons learnt, and concludes with insights to the next phases of this study.
Resumo:
The behavioral theory of “entrepreneurial bricolage” attempts to understand what entrepreneurs do when faced with resource constraints. Most research about bricolage, defined as “making do by applying combinations of the resources at hand to new problems and opportunities” (Baker & Nelson 2005: 333), has been qualitative and inductive (Garud & Karnoe, 2003). Although this has created a small body of rich descriptions and interesting insights, little deductive theory has been developed and the relationship between bricolage and firm performance has not been systematically tested. In particular, prior research has suggested bricolage can have both beneficial and harmful effects. Ciborra’s (1996) study of Olivetti suggested that bricolage helped Olivetti to adapt, but simultaneously constrained firm effectiveness. Baker & Nelson (2005) suggested that bricolage may be harmful at very high levels, but more helpful if used judiciously. Other research suggests that firm innovativeness may play an important role in shaping the outcomes of bricolage (Anderson 2008). In this paper, we theorize and provide preliminary test of the bricolage-performance relationship and how it is affected by firm innovativeness.
Resumo:
“Hardware in the Loop” (HIL) testing is widely used in the automotive industry. The sophisticated electronic control units used for vehicle control are usually tested and evaluated using HIL-simulations. The HIL increases the degree of realistic testing of any system. Moreover, it helps in designing the structure and control of the system under test so that it works effectively in the situations that will be encountered in the system. Due to the size and the complexity of interaction within a power network, most research is based on pure simulation. To validate the performance of physical generator or protection system, most testing is constrained to very simple power network. This research, however, examines a method to test power system hardware within a complex virtual environment using the concept of the HIL. The HIL testing for electronic control units and power systems protection device can be easily performed at signal level. But performance of power systems equipments, such as distributed generation systems can not be evaluated at signal level using HIL testing. The HIL testing for power systems equipments is termed here as ‘Power Network in the Loop’ (PNIL). PNIL testing can only be performed at power level and requires a power amplifier that can amplify the simulation signal to the power level. A power network is divided in two parts. One part represents the Power Network Under Test (PNUT) and the other part represents the rest of the complex network. The complex network is simulated in real time simulator (RTS) while the PNUT is connected to the Voltage Source Converter (VSC) based power amplifier. Two way interaction between the simulator and amplifier is performed using analog to digital (A/D) and digital to analog (D/A) converters. The power amplifier amplifies the current or voltage signal of simulator to the power level and establishes the power level interaction between RTS and PNUT. In the first part of this thesis, design and control of a VSC based power amplifier that can amplify a broadband voltage signal is presented. A new Hybrid Discontinuous Control method is proposed for the amplifier. This amplifier can be used for several power systems applications. In the first part of the thesis, use of this amplifier in DSTATCOM and UPS applications are presented. In the later part of this thesis the solution of network in the loop testing with the help of this amplifier is reported. The experimental setup for PNIL testing is built in the laboratory of Queensland University of Technology and the feasibility of PNIL testing has been evaluated using the experimental studies. In the last section of this thesis a universal load with power regenerative capability is designed. This universal load is used to test the DG system using PNIL concepts. This thesis is composed of published/submitted papers that form the chapters in this dissertation. Each paper has been published or submitted during the period of candidature. Chapter 1 integrates all the papers to provide a coherent view of wide bandwidth switching amplifier and its used in different power systems applications specially for the solution of power systems testing using PNIL.