855 resultados para Finishes in the construction
Resumo:
Work-related falls continues to be one of the leading causes of fatalities in the Australian construction industry, and the failure to use fall protection equipment, such as fall-arrest harnesses and arresting devices, has been found to be a contributing factor. In an attempt to gain an understanding of the issues surrounding the use of fallarrest harness systems by construction workers a study involving semi-structured interviews of 15 male construction workers was carried out at three construction sites. The majority of interviewees commented that there was discomfort in wearing a fall-arrest harness; that there were a number of problems when anchored via an arresting device; and that using a fall-arrest system reduced productivity. Most of the interviewees considered that they needed safety precautions against falls, and they expressed the view that workers’ attitudes towards safety depended critically upon their supervisors’ attitude towards safety. It was also found that workers were not trained in rescue procedures. Interviewees expressed concern that retrieval of a suspended worker may not be carried out in time to prevent the onset of suspension trauma. A number of issues were identified which require further research, such as, investigation into suspension trauma, harness and arresting device design, training provided to workers, and the provision for rescues.
Resumo:
The construction sector has one of the worst occupational safety and health records in Europe. The costs of this scenario are very high, namely costs for workers and their families, costs to organizations, resulting from the absence of workers due to illness, insurance premiums, costs resulting from reduced productivity, cost of replacement and training of workers, etc., and costs to society, which in turn increases the costs of health systems. This paper presents and discusses the development of a methodology for economic evaluation in the context of risk management, which will allow senior management to support decision making. The possible application of this methodology to the construction sector is discussed.
Resumo:
In this paper we examine the construction of first entities in narratives produced by children of 5, 7, 10 years and adults1 . The study demonstrates that when children reformulate they try to construct entities detached from the situation of enunciation, which means that they construct a detached or a translated plane and they construct linguistic existence of entities. Entities must first be introduced into the enunciative space and then comments will be made in subsequent utterances. Constructing existence supposes extraction. This consists of “singling out an occurrence, that is, isolating and drawing its spatiotemporal boundaries” (Culioli, 1990, p. 182) . Once the occurrence of the notion is constructed (which means it has become a separate occurrence with situational properties), children can predicate about it. However, there are children who do not construct the linguistic existence of entities. I hypothesize that the mode of task presentation influences the success of constructing linguistic existence. Sharing the investigator’s knowledge about the stimulus images, children do not ascribe an existential status to the occurrence of the notional domain.
Resumo:
International Conference: A Child's World - Next Steps, 25 June 2012 - 27th June 2014.
Resumo:
This paper was presented in the International Symposium on Toward the Creation of New-Sport Cultures, undertaken in Osaka, Japan, in January 28, 1996. The main purpose is to make an interpretation of the cultural values of sport and Olympism in contemporary society, considering the enormous influence that the media have on them.
Resumo:
It is a well-established fact in the literature on simulating Input-Output tables that mechanical methods for estimating intermediate trade lead to biased results where cross-hauling is underestimated and Type-I multipliers are overstated. Repeated findings to this effect have led to a primary emphasis on advocating the accurate estimation of intermediate trade flows. This paper reviews previous research and argues for a qualification of the consensus view: When simulating IO tables, construction approaches need to consider spill-over effects driven by wage and consumption flows. In particular, for the case of metropolitan economies, wage and consumption flows are important if accurate Type-II multipliers are to be obtained. This is demonstrated by constructing an interregional Input-Output table, which captures interdependencies between a city and its commuter belt, nested within the wider regional economy. In addition to identifying interdependencies caused by interregional intermediate purchases, data on subregional household incomes and commuter flows are used to identify interdependencies from wage payments and household consumption. The construction of the table is varied around a range of assumptions on intermediate trade and household consumption to capture the sensitivity of multipliers.
Resumo:
In 2002 in the Ivory Coast three months of armed conflict ended with the division of the country. Two regions were separated by an interposition line controlled by the French Forces Licorne. This significant peace process was maintained over time, but characterized for lack of mutual confidence and political immobility, which led to an impasse and the continuation of Laurent Gbagbo in the presidency. Moreover, the peace building process was less successful because the different political agreements failed to address some of the main national problems, such as land property and identity issues. The following paper aims first to analyze the main facts and causes that instigated the conflict since the coup d’état in 2002. Secondly, the paper will analyze the peace process and point out the key elements of the Ouagadougou Peace Agreement (2007): the creation of a new and unique armed forces structure, as well as the identification of the population and implementation of an electoral process. The main goal is to provide the International Catalan Institute for Peace (ICIP) a working tool in order to send an electoral observation mission to this African country by November 2009.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.