979 resultados para Electric networks - Planning
Resumo:
The use of QoS parameters to evaluate the quality of service in a mesh network is essential mainly when providing multimedia services. This paper proposes an algorithm for planning wireless mesh networks in order to satisfy some QoS parameters, given a set of test points (TPs) and potential access points (APs). Examples of QoS parameters include: probability of packet loss and mean delay in responding to a request. The proposed algorithm uses a Mathematical Programming model to determine an adequate topology for the network and Monte Carlo simulation to verify whether the QoS parameters are being satisfied. The results obtained show that the proposed algorithm is able to find satisfactory solutions.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Includes bibliography.
Resumo:
This paper presents a strategy for the solution of the WDM optical networks planning. Specifically, the problem of Routing and Wavelength Allocation (RWA) in order to minimize the amount of wavelengths used. In this case, the problem is known as the Min-RWA. Two meta-heuristics (Tabu Search and Simulated Annealing) are applied to take solutions of good quality and high performance. The key point is the degradation of the maximum load on the virtual links in favor of minimization of number of wavelengths used; the objective is to find a good compromise between the metrics of virtual topology (load in Gb/s) and of the physical topology (quantity of wavelengths). The simulations suggest good results when compared to some existing in the literature.
Resumo:
Distributed generation unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to load centers, interchanging electric power with the network. This work presents a probabilistic methodology conceived to assist the electric system planning engineers in the selection of the distributed generation location, taking into account the hourly load changes or the daily load cycle. The hourly load centers, for each of the different hourly load scenarios, are calculated deterministically. These location points, properly weighted according to their load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where each source distributed generation point should preferably be located by the planning engineers. This takes into account, for example, the availability and the cost of the land lots, which are factors of special relevance in urban areas, as well as several obstacles important for the final selection of the candidates of the distributed generation points. The proposed methodology has been applied to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund’s exponential distribution and the Weibull probability distribution. The methodology algorithm has been programmed in MATLAB. Results are presented and discussed for the application of the methodology to a realistic case and demonstrate the ability of the proposed methodology for efficiently handling the determination of the best location of the distributed generation and their corresponding distribution networks.
Resumo:
Sähköisen verkon täsmällinen tunteminen on edellytys verkon tehokkaalle suunnittelulle ja käytölle. Lappeenrannassa ulkovalaistusverkon dokumentointi oli lähtökohtaisestei hyvin hajanaista. Tämän tutkimuksen tärkein anti oli tarjota Lappeenrannan kaupungille dokumentointiratkaisu, jolla ulkovalaistusverkon dokumentaatio ja topologia saatetaan moderniin sähköiseen muotoon. Tutkimus jakaantui neljään eri pääkohtaan: Lappeenrannan ulkovalaistusverkon tutkimustyöhön, verkkotietojärjestelmien tutkimustyöhön, dokumentointiprosessin määrittelyyn ja verkkotietojärjestelmien ylläpitoprosessin määrittelyyn. Näissä on käytetty merkittävissä määrin asiantuntijoiden lausuntoja, erityisesti ulkovalaistusverkon rakenteesta ja eri verkkotietojärjestelmien ominaisuuksista sekä käytöstä. Näihin perustuen on muodostettu kuva uuden verkkotietojärjestelmän vaatimuksista ja dokumentoinnin lähtötasosta, joiden avulla on määritelty itse dokumentointiprosessi, sen potentiaaliset ongelmat ja arvioitu työmäärää. Ylläpitoprosessien määrittelyssä on käytetty lähtökohtana Lappeenrannan Energiaverkot Oy:n nykyisiä ylläpitoprosesseja ja -menetelmiä. Tutkimuksen tuloksena syntyi määrittelyt kolmelle eri verkkotietojärjestelmälle, joilla ongelma saadaan ratkaistua. Näistä kaksi täytti vaatimukset täysin: Trimble NIS ja Keypron KeyLight.
Resumo:
Distribution networks paradigm is changing currently requiring improved methodologies and tools for network analysis and planning. A relevant issue is analyzing the impact of the Distributed Generation penetration in passive networks considering different operation scenarios. Studying DG optimal siting and sizing the planner can identify the network behavior in presence of DG. Many approaches for the optimal DG allocation problem successfully used multi-objective optimization techniques. So this paper contributes to the fundamental stage of multi-objective optimization of finding the Pareto optimal solutions set. It is proposed the application of a Multi-objective Tabu Search and it was verified a better performance comparing to the NSGA-II method. © 2009 IEEE.
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
In this work the numerical coupling of thermal and electric network models with model equations for optoelectronic semiconductor devices is presented. Modified nodal analysis (MNA) is applied to model electric networks. Thermal effects are modeled by an accompanying thermal network. Semiconductor devices are modeled by the energy-transport model, that allows for thermal effects. The energy-transport model is expandend to a model for optoelectronic semiconductor devices. The temperature of the crystal lattice of the semiconductor devices is modeled by the heat flow eqaution. The corresponding heat source term is derived under thermodynamical and phenomenological considerations of energy fluxes. The energy-transport model is coupled directly into the network equations and the heat flow equation for the lattice temperature is coupled directly into the accompanying thermal network. The coupled thermal-electric network-device model results in a system of partial differential-algebraic equations (PDAE). Numerical examples are presented for the coupling of network- and one-dimensional semiconductor equations. Hybridized mixed finite elements are applied for the space discretization of the semiconductor equations. Backward difference formluas are applied for time discretization. Thus, positivity of charge carrier densities and continuity of the current density is guaranteed even for the coupled model.
Resumo:
"Supported in part by the National Science Foundation under grant no. NSF GJ-503."
Resumo:
Includes bibliography.
Resumo:
This paper is sponsored by the Ministry of Education and Research of the Republic of Bulgaria in the framework of project No 105 “Multimedia Packet Switching Networks Planning with Quality of Service and Traffic Management”.
Resumo:
Com vista a revolucionar o sector das comunicações móveis, muito à custa dos elevados débitos prometidos, a tecnologia LTE recorre a uma técnica que se prevê que seja bastante utilizada nas futuras redes de comunicações móveis: Relaying. Juntamente com esta técnica, o LTE recorre à técnica MIMO, para melhorar a qualidade da transmissão em ambientes hostis e oferecer elevados ritmos de transmissão. No planeamento das próximas redes LTE, o recurso à técnica Relaying é frequente. Esta técnica, tem como objectivo aumentar a cobertura e/ou capacidade da rede, e ainda melhorar o seu desempenho em condições de fronteira de célula. A performance de uma RS depende da sua localização, das condições de propagação do canal rádio a que tanto a RS como o EU estão sujeitos, e ainda da capacidade que a RS tem de receber, processar e reencaminhar a informação. O objectivo da tese é estudar a relação existente entre o posicionamento de uma RS e o seu desempenho. Desta forma, pretende-se concluir qual a posição ideal de uma RS (tanto do tipo AF como SDF). Para além deste estudo, é apresentado um comparativo do desempenho dos modos MIMO TD e OL-SM, onde se conclui em que condições deverão ser utilizados, numa rede LTE equipada com FRSs.
Resumo:
Os direitos de transmissão (Transmission Rigths – TRs) correspondem, na sua essência, a contratos que conferem aos seus proprietários o direito de transmitir energia eléctrica, por um determinado caminho, a um preço fixo. Na actualidade vive-se uma era de liberalização dos mercados de energia eléctrica nos quais, no caso concreto dos mercados de TRs, os diversos agentes podem ceder os TRs que possuem a outros agentes desde que cumpram certos requisitos impostos pelo sistema na figura do seu operador de sistema (Independent System Operator – ISO). Neste sentido, o ISO oferece, aos diversos agentes do mercado, algumas ferramentas que lhes permite transaccionar, sob sua orientação, os seus respectivos TRs fazendo-se cumprir todos os requisitos indispensáveis para o efeito. A mais popular dessas ferramentas, nos principais mercados energético da actualidade, é o leilão. Com o presente trabalho de dissertação é pretendido apresentar-se um modelo para a resolução do problema inerente a um leilão de TRs em ambiente de mercado, neste caso concreto de direitos de transmissão financeiros de energia eléctrica (Financial Transmission Rigths – FTRs). Neste sentido foi desenvolvido um simulador informático (SIM_AuctFTR) que implementa um modelo para este tipo de problemas. Este trabalho foi estruturado essencialmente em três etapas com objectivos inerentes. Assim, numa primeira fase da realização deste trabalho, foi realizado um estudo de diversos conceitos e metodologias inerentes ao problema de leilão de FTRs em ambiente de mercado, suportado por uma sólida base bibliográfica. A segunda fase tratou-se do desenvolvimento do algoritmo da aplicação computacional que solucione um problema de um leilão de FTRs. O SIM_AuctFTR foi desenvolvido sobre o pressuposto da maximização dos rendimentos financeiros provenientes da atribuição dos FTRs propostos a leilão, tendo estes últimos de coabitar no sistema respeitando as restrições técnicas a que este são inerentes, mesmo na eventualidade da ocorrência de contingências de nível ‘n-1’. Por último, numa terceira fase, partindo da aplicação desenvolvida, foram realizados 4 casos de estudos com outras tantas redes eléctricas de forma a testar a robustez da ferramenta desenvolvida.
Resumo:
The work presented in this paper belongs to the power quality knowledge area and deals with the voltage sags in power transmission and distribution systems. Propagating throughout the power network, voltage sags can cause plenty of problems for domestic and industrial loads that can financially cost a lot. To impose penalties to responsible party and to improve monitoring and mitigation strategies, sags must be located in the power network. With such a worthwhile objective, this paper comes up with a new method for associating a sag waveform with its origin in transmission and distribution networks. It solves this problem through developing hybrid methods which hire multiway principal component analysis (MPCA) as a dimension reduction tool. MPCA reexpresses sag waveforms in a new subspace just in a few scores. We train some well-known classifiers with these scores and exploit them for classification of future sags. The capabilities of the proposed method for dimension reduction and classification are examined using the real data gathered from three substations in Catalonia, Spain. The obtained classification rates certify the goodness and powerfulness of the developed hybrid methods as brand-new tools for sag classification