924 resultados para Down Time, Design Changes, Reliability Improvement, Cost Estimation
Resumo:
In order to overcome divergence of estimation with the same data, the proposed digital costing process adopts an integrated design of information system to design the process knowledge and costing system together. By employing and extending a widely used international standard, industry foundation classes, the system can provide an integrated process which can harvest information and knowledge of current quantity surveying practice of costing method and data. Knowledge of quantification is encoded from literatures, motivation case and standards. It can reduce the time consumption of current manual practice. The further development will represent the pricing process in a Bayesian Network based knowledge representation approach. The hybrid types of knowledge representation can produce a reliable estimation for construction project. In a practical term, the knowledge management of quantity surveying can improve the system of construction estimation. The theoretical significance of this study lies in the fact that its content and conclusion make it possible to develop an automatic estimation system based on hybrid knowledge representation approach.
Resumo:
For products sold with warranty, the warranty servicing cost can be reduced by improving product reliability through a development process. However, this increases the unit manufacturing cost. Optimal development must achieve a trade-off between these two costs. The outcome of the development process is uncertain and needs to be taken into account in the determination of the optimal development effort. The paper develops a model where this uncertainty is taken into account. (C) 2003 Elsevier Ltd. All rights reserved.
Resumo:
This paper elaborates the routing of cable cycle through available routes in a building in order to link a set of devices, in a most reasonable way. Despite of the similarities to other NP-hard routing problems, the only goal is not only to minimize the cost (length of the cycle) but also to increase the reliability of the path (in case of a cable cut) which is assessed by a risk factor. Since there is often a trade-off between the risk and length factors, a criterion for ranking candidates and deciding the most reasonable solution is defined. A set of techniques is proposed to perform an efficient and exact search among candidates. A novel graph is introduced to reduce the search-space, and navigate the search toward feasible and desirable solutions. Moreover, admissible heuristic length estimation helps to early detection of partial cycles which lead to unreasonable solutions. The results show that the method provides solutions which are both technically and financially reasonable. Furthermore, it is proved that the proposed techniques are very efficient in reducing the computational time of the search to a reasonable amount.
Resumo:
Photocopy.
Resumo:
This research addresses the problem of cost estimation for product development in engineer-to-order (ETO) operations. An ETO operation starts the product development process with a product specification and ends with delivery of a rather complicated, highly customized product. ETO operations are practiced in various industries such as engineering tooling, factory plants, industrial boilers, pressure vessels, shipbuilding, bridges and buildings. ETO views each product as a delivery item in an industrial project and needs to make an accurate estimation of its development cost at the bidding and/or planning stage before any design or manufacturing activity starts. ^ Many ETO practitioners rely on an ad hoc approach to cost estimation, with use of past projects as reference, adapting them to the new requirements. This process is often carried out on a case-by-case basis and in a non-procedural fashion, thus limiting its applicability to other industry domains and transferability to other estimators. In addition to being time consuming, this approach usually does not lead to an accurate cost estimate, which varies from 30% to 50%. ^ This research proposes a generic cost modeling methodology for application in ETO operations across various industry domains. Using the proposed methodology, a cost estimator will be able to develop a cost estimation model for use in a chosen ETO industry in a more expeditious, systematic and accurate manner. ^ The development of the proposed methodology was carried out by following the meta-methodology as outlined by Thomann. Deploying the methodology, cost estimation models were created in two industry domains (building construction and the steel milling equipment manufacturing). The models are then applied to real cases; the cost estimates are significantly more accurate than the actual estimates, with mean absolute error rate of 17.3%. ^ This research fills an important need of quick and accurate cost estimation across various ETO industries. It differs from existing approaches to the problem in that a methodology is developed for use to quickly customize a cost estimation model for a chosen application domain. In addition to more accurate estimation, the major contributions are in its transferability to other users and applicability to different ETO operations. ^
Resumo:
Recent developments in automation, robotics and artificial intelligence have given a push to a wider usage of these technologies in recent years, and nowadays, driverless transport systems are already state-of-the-art on certain legs of transportation. This has given a push for the maritime industry to join the advancement. The case organisation, AAWA initiative, is a joint industry-academia research consortium with the objective of developing readiness for the first commercial autonomous solutions, exploiting state-of-the-art autonomous and remote technology. The initiative develops both autonomous and remote operation technology for navigation, machinery, and all on-board operating systems. The aim of this study is to develop a model with which to estimate and forecast the operational costs, and thus enable comparisons between manned and autonomous cargo vessels. The building process of the model is also described and discussed. Furthermore, the model’s aim is to track and identify the critical success factors of the chosen ship design, and to enable monitoring and tracking of the incurred operational costs as the life cycle of the vessel progresses. The study adopts the constructive research approach, as the aim is to develop a construct to meet the needs of a case organisation. Data has been collected through discussions and meeting with consortium members and researchers, as well as through written and internal communications material. The model itself is built using activity-based life cycle costing, which enables both realistic cost estimation and forecasting, as well as the identification of critical success factors due to the process-orientation adopted from activity-based costing and the statistical nature of Monte Carlo simulation techniques. As the model was able to meet the multiple aims set for it, and the case organisation was satisfied with it, it could be argued that activity-based life cycle costing is the method with which to conduct cost estimation and forecasting in the case of autonomous cargo vessels. The model was able to perform the cost analysis and forecasting, as well as to trace the critical success factors. Later on, it also enabled, albeit hypothetically, monitoring and tracking of the incurred costs. By collecting costs this way, it was argued that the activity-based LCC model is able facilitate learning from and continuous improvement of the autonomous vessel. As with the building process of the model, an individual approach was chosen, while still using the implementation and model building steps presented in existing literature. This was due to two factors: the nature of the model and – perhaps even more importantly – the nature of the case organisation. Furthermore, the loosely organised network structure means that knowing the case organisation and its aims is of great importance when conducting a constructive research.
Influence of abutment-to-fixture design on reliability and failure mode of all-ceramic crown systems
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
It is generally recognized that information about the runtime cost of computations can be useful for a variety of applications, including program transformation, granularity control during parallel execution, and query optimization in deductive databases. Most of the work to date on compile-time cost estimation of logic programs has focused on the estimation of upper bounds on costs. However, in many applications, such as parallel implementations on distributed-memory machines, one would prefer to work with lower bounds instead. The problem with estimating lower bounds is that in general, it is necessary to account for the possibility of failure of head unification, leading to a trivial lower bound of 0. In this paper, we show how, given type and mode information about procedures in a logic program, it is possible to (semi-automatically) derive nontrivial lower bounds on their computational costs. We also discuss the cost analysis for the special and frequent case of divide-and-conquer programs and show how —as a pragmatic short-term solution —it may be possible to obtain useful results simply by identifying and treating divide-and-conquer programs specially.
Resumo:
The market for used products is becoming more competitive and dealers of used products use warranty to promote sales as well as to provide assurnace to customers. Offering warranty results in additional costs associated with warranty servicing. This cost can be reduced through actions such as overhaul and upgrade that improves the reliability of the item. This is worthwhile only if the cost of improvement is less than the reduction in the warranty servicing cost. This paper deals with two models to decide on the reliability improvement strategies for used items sold with FRW policy.
Resumo:
Copyright © 2014 Entomological Society of America.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
Työn tavoitteena oli kehittää tutkittavan insinööriyksikön projektien kustannusestimointiprosessia, siten että yksikön johdolla olisi tulevaisuudessa käytettävänään tarkempaa kustannustietoa. Jotta tämä olisi mahdollista, ensin täytyi selvittää yksikön toimintatavat, projektien kustannusrakenteet sekä kustannusatribuutit. Tämän teki mahdolliseksi projektien kustannushistoriatiedon tutkiminen sekä asiantuntijoiden haastattelu. Työn tuloksena syntyi kohdeyksikön muiden prosessien kanssa yhteensopiva kustannusestimointiprosessi sekä –malli.Kustannusestimointimenetelmän ja –mallin perustana on kustannusatribuutit, jotka määritellään erikseen tutkittavassa ympäristössä. Kustannusatribuutit löydetään historiatietoa tutkimalla, eli analysoimalla jo päättyneitä projekteja, projektien kustannusrakenteita sekä tekijöitä, jotka ovat vaikuttaneet kustannusten syntyyn. Tämän jälkeen kustannusatribuuteille täytyy määritellä painoarvot sekä painoarvojen vaihteluvälit. Estimointimallin tarkuutta voidaan parantaa mallin kalibroinnilla. Olen käyttänyt Goal – Question – Metric (GQM) –menetelmää tutkimuksen kehyksenä.
Resumo:
Cost estimation is an important, but challenging process when designing a new product or a feature of it, verifying the product prices given by suppliers or planning a cost saving actions of existing products. It is even more challenging when the product is highly modular, not a bulk product. In general, cost estimation techniques can be divided into two main groups - qualitative and quantitative techniques - which can further be classified into more detailed methods. Generally, qualitative techniques are preferable when comparing alternatives and quantitative techniques when cost relationships can be found. The main objective of this thesis was to develop a method on how to estimate costs of internally manufactured and commercial elevator landing doors. Because of the challenging product structure, the proposed cost estimation framework is developed under three different levels based on past cost information available. The framework consists of features from both qualitative and quantitative cost estimation techniques. The starting point for the whole cost estimation process is an unambiguous, hierarchical product structure so that the product can be classified into controllable parts and is then easier to handle. Those controllable parts can then be compared to existing past cost knowledge of similar parts and create as accurate cost estimates as possible by that way.
Resumo:
Target company of this study is a large machinery company, which is, inter alia, engaged in energy and pulp engineering, procurement and construction management (EPCM) supply business. The main objective of this study was to develop cost estimation of the target company by providing more accurate, reliable and up-to-date information through enterprise resource planning (ERP) system. Another objective was to find cost-effective methods to collect total cost of ownership information to support more informed supplier selection decision making. This study is primarily action-oriented, but also constructive, and it can be divided in two sections: theoretical literature review and empirical study on the abovementioned part of the target company’s business. Development of information collection is, in addition to literature review, based on nearly 30 qualitative interviews of employees at various organizational units, functions and levels at the target company. At the core of development was to make initial data more accurate, reliable and available, a necessary prerequisite for informed use of the information. Certain development suggestions and paths were presented in order to regain confidence in ERP system as information source by reorganizing work breakdown structure and by complementing mere cost information with quantitative, technical and scope information. Several methods to use the information ever more effectively were also discussed. While implementation of the development suggestions outreached the scope of this study, it was forwarded in test environment and interest groups.