998 resultados para Design and build,


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper summarises an initial report carried out by the Housing Business Research Group, of the University of Reading into Design and Build procurement and a number of research projects undertaken by the national federation of Housing Associations (NFHA), into their members' development programmes. The paper collates existing statistics from these sources and examines the way in which Design and Build procurement can be adapted for the provision of social housing. The paper comments on these changes and questions how risk averting the adopted strategies are in relation to long term housing business management issues arising from the quality of the product produced by the new system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUNDChisholm’s ‘first year experience’ is a significant feature of the new industry focused Bachelor of Engineering Technology program delivered in association with the South East Melbourne Manufacturers’ Alliance (SEMMA). This conceive-design-implement-operate (CDIO Initiative) program commenced as a full time program in first semester 2012. Whereas it is common for CDIO Initiative programs to have a first year experience program containing a project typical of the type of industry project they would complete as a graduate engineer or engineering technologist, this goes further by using real industry projects provided by SEMMA members.This design-and-build industry project runs across both semesters supporting project-based learning in three first year subjects. A concern is that the industry involvement of the projects adds substantially to an already heavy student workload. This has been further increased by the addition of two additional first year initiatives: writing workshops, and training in, and substantial use of, student oral presentations. It is recognised that an excessive workload could lead students to adopt surface learning approaches in other subjects.PURPOSEThe goal of the project is to evaluate student perceptions of the value and work load impact of the industry project and the other new first year initiatives.DESIGN/METHODCentral to this project is a student survey-based evaluation of the industry project based learning that is the core of the ‘first year experience’. The participants were limited to the small group of students who, in a single year, completed all three subjects that comprise the ‘first year experience’. To avoid compromising the results the survey was administered by Chisholm Institute’s Department of Strategy and Planning with no engineering technology degree program staff present. The survey included questions to enable responses to be linked with specific student demographics without identifying any of the respondents.RESULTSThe study showed the industry project-based learning had worthwhile outcomes but placed considerable time pressures on most respondents. For some, this also impacted on their other subjects. A first year oral presentation program was also shown to have worthwhile outcomes. However no conclusions could be reliably drawn on the third initiative – writing workshops.CONCLUSIONSThe results confirm that the authentic industry project is considered a worthwhile initiative but contributes significantly to student overload. This applies also – to a lesser extent – to the first year oral presentation program. Both also require new approaches to delivery as student numbers increase. Strategies to address these issues are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Presents a case study of design management within an Australian design-construct organization on a large residential apartment project, with the purpose of identifying and analysing issues associated with the organization, responsibilities and stages of development in a typical design-construct project. Discusses the nature of introspection in the Australian construction industry, the shift in procurement methods, the design and build approach, whole life issues, the need for a design manager, and the role of the facilities manager. Profiles the case study organization and its contracts and procurement methods, before focusing on weaknesses in the company, the role of the project design development manager in leading the design team, managing the design consultants, and interacting and advising the developer in relation to design decisions. Suggests from the exercise that: the project manager should remain the overall project leader, manager and interface between design, cost, programme, buildability, construction and user requirements; the design manager should be responsible for issuing all documentation; and the design cost manager should be responsible for verifying that the design developed accords with project budgets, project brief and quality requirements in conjunction with the design manager.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The School of Mechanical and Aerospace Engineering at Queen’s University Belfast introduced a new degree programme in Product Design and Development (PDD) in 2004. As well as setting out to meet all UK-SPEC requirements, the entirely new curriculum was developed in line with the syllabus and standards defined by the CDIO Initiative, an international collaboration of universities aiming to improve the education of engineering students. The CDIO ethos is that students are taught in the context of conceiving, designing, implementing and operating a product or system. Fundamental to this is an integrated curriculum with multiple Design-Build-Test (DBT) experiences at the core. Unlike most traditional engineering courses the PDD degree features group DBT projects in all years of the programme. The projects increase in complexity and challenge in a staged manner, with learning outcomes guided by Bloom’s taxonomy of learning domains. The integrated course structure enables the immediate application of disciplinary knowledge, gained from other modules, as well as development of professional skills and attributes in the context of the DBT activity. This has a positive impact on student engagement and the embedding of these relevant skills, identified from a stakeholder survey, has also been shown to better prepare students for professional practice. This paper will detail the methodology used in the development of the curriculum, refinements that have been made during the first five years of operation and discuss the resource and staffing issues raised in facilitating such a learning environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

People have adopted various formats of media such as graphics, photo and text (nickname) in order to represent themselves when communicate with others online. Avatar is known as a visual form representing a user oneself and one's identity wished. Its form can vary from a two-dimensional model to a three-dimensional model, and can be visualised with various visual forms and styles. In general, two-dimensional images including an animated image are used in online forum communities and live chat software; while three-dimensional models are often used in computer games. Avatar design is often regarded as a graphic designer's visual image creation or a user's output based on one's personal preference, yet it often causes the avatar design having no consideration of its practical visual design and users' interactive communication experience aspects. This paper will review various types and styles of avatar and discuss about avatar design from visual design and online user experience perspectives. It aims to raise a design discourse in avatar design and build up a well-articulated set of design principles for effective avatar design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Buildings and infrastructure represent principal assets of any national economy as well as prime sources of environmental degradation. Making them more sustainable represents a key challenge for the construction, planning and design industries and governments at all levels; and the rapid urbanisation of the 21st century has turned this into a global challenge. This book embodies the results of a major research programme by members of the Australia Co-operative Research Centre for Construction Innovation and its global partners, presented for an international audience of construction researchers, senior professionals and advanced students. It covers four themes, applied to regeneration as well as to new build, and within the overall theme of Innovation: Sustainable Materials and Manufactures, focusing on building material products, their manufacture and assembly – and the reduction of their ecological ‘fingerprints’, the extension of their service lives, and their re-use and recyclability. It also explores the prospects for applying the principles of the assembly line. Virtual Design, Construction and Management, viewed as increasing sustainable development through automation, enhanced collaboration (such as virtual design teams), real time BL performance assessment during design, simulation of the construction process, life-cycle management of project information (zero information loss) risk minimisation, and increased potential for innovation and value adding. Integrating Design, Construction and Facility Management over the Project Life Cycle, by converging ICT, design science engineering and sustainability science. Integration across spatial scales, enabling building–infrastructure synergies (such as water and energy efficiency). Convergences between IT and design and operational processes are also viewed as a key platform increased sustainability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many firms develop successful businesses around competencies and over time these competencies can become core rigidities and barriers to new ways of working. This paper investigates how firms respond to a design innovation program apply design methodologies to their business. Early findings from a study of companies engaged in a design innovation program indicate that applying design principles to multiple aspects of their business provides a new strategic focus, tools for a better understanding of their business and the marketplace, new economic activity, awareness of the need for an innovative culture and strategic renewal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated design and delivery solutions (IDDS) is a priority theme of the International Council for Research and Innovation in Building and Construction (CIB), which will be used to drive the global research agenda forward. IDDS will use collaborative work processes and enhanced skills together with integrated data, information and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, operation, and across projects. IDDS build on building information modelling (BIM), incorporating advances in the training and employment of people, together with supporting new technologies. The successful use of IDDS involves changes in each of the project phases from conceptual planning and business case formulation to all stages of the supply chain: design, construction, commissioning, operation, retrofit and decommissioning. For each of these phases, key changes in the structure and culture of the project team across the different collaborating firms create a favourable context for IDDS. Special for IDDS thinking is the idea of adding project and whole-life value in all phases, for all stakeholders...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cloud Computing, based on early virtual computer concepts and technologies, is now itself a maturing technology in the marketplace and it has revolutionized the IT industry, being the powerful platform that many businesses are choosing to migrate their in-premises IT services onto. Cloud solution has the potential to reduce the capital and operational expenses associated with deploying IT services on their own. In this study, we have implemented our own private cloud solution, infrastructure as a service (IaaS), using the OpenStack platform with high availability and a dynamic resource allocation mechanism. Besides, we have hosted unified communication as a service (UCaaS) in the underlying IaaS and successfully tested voice over IP (VoIP), video conferencing, voice mail and instant messaging (IM) with clients located at the remote site. The proposed solution has been developed in order to give advice to bussinesses that want to build their own cloud environment, IaaS and host cloud services and applicatons in the cloud. This paper also aims at providing an alternate option for proprietary cloud solutions for service providers to consider.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Engineering students are best able to understand theory when one explains it in relation to realistic problems and its practical applications. Teaching theory in isolation has led to lower levels of comprehension and motivation and a correspondingly higher rate of failure. At Queensland University of Technology, a number of new methods have been introduced recently to improve the teaching and learning of steel structural design at undergradt1ate level. In the basic steel structures subject a project-based teaching method was introduced in which the students were required to analyse, design and build the lightest I most efficient steel columns for a given target capacity. A design assignment involving simple, but real structures was also introduced in the basic steel structures subject. Both these exercises simulated realistic engineering problems from the early years of the course and produced a range of benefits. Improvements to the teaching and learning was also made through integration of a number of related structural engineering subjects and by the introduction of animated computer models and laboratory models. This paper presents the details of all these innovative methods which improved greatly the students' understanding of the steel structures design process.