990 resultados para Delaware and Raritan Canal (N.J.)--Maps.
Resumo:
Signed: C. Johnson, Postmaster General.
Resumo:
On Sabbath desecration by the companies: revised and expanded version of letters "published about a year ago in one of the newspapers of Trenton."
Resumo:
Errata: p. [84]
Resumo:
Green, J.S., prof., 1847-55; trustee, 1828-62.
Resumo:
Mode of access: Internet.
Resumo:
Original has call no. : ARCHIVES/O/J900/M2/no. 54
Resumo:
Signed (page 20): I.H. Williamson, Elizabethtown, Dec. 8th, 1834 ... Garret D. Wall, Burlington, Dec. 19th, 1834.
Resumo:
Petition for reduced transit duty of heavy products carried.
Resumo:
General city street map also showing principal buildings, ward names, city block dimensions in feet (some blocks), and the Raritan terminus of the Delaware and Raritan Canal.
Resumo:
Vols. for 1867-1915 include report of the state director of the United New Jersey Railroad and Canal Company issued through 1878 under its earlier names: 1867-71, Delaware and Raritan Canal and Camden and Amboy Railroad and Transportation Companies (which continues the reports of the State Directors); 1873-78, United Rail Road and Canal Company of New Jersey.
Resumo:
NUC pre-1956
Resumo:
Pages [57]-70 contain: "An act to incorporate the president, managers and company, of the Delaware and Hudson Canal Company.
Resumo:
This paper presents a case report of a left mandibular second premolar with three canals and three different apical foramina. A 39-year-old male patient presented to our clinic with pain in the mandibular left second premolar. Initially, pain was caused by cold stimulus and later was spontaneously. The intraoral clinical examination revealed a fractured amalgam restoration with occlusal caries. Percussion and cold (Endo-Frost) tests were positive. The radiographic examination showed the presence of two roots. The probable diagnosis was an acute pulpitis. After access cavity, it was observed remaining roof of the pulp chamber and mild bleeding in the tooth lingual area, indicating the possible presence of a third canal. The endodontic treatment was completed in a single session using Root ZX apex locator and K3 NiTi rotary system with surgical diameter corresponding to a .02/45 file in the three canals and irrigation with 1% sodium hypochlorite. The canals were obtured with gutta-percha cones and Sealer 26 using the lateral condensation technique. After 1 year of follow-up, the tooth was asymptomatic and periapical repair was observed radiographically. Internal alterations should be considered during the endodontic treatment of mandibular second premolars. The correct diagnosis of these alterations by the analysis of preoperative radiographs can help the location of two or more canals, thereby avoiding root therapy failure.
Resumo:
In this preliminary study eighteen p-substituted benzoic acid [(5-nitro-thiophen-2-yl)-methylene]-hydrazides with antimicrobial activity were evaluated against multidrug-resistant Staphylococcus aureus, correlating the three-dimensional characteristics of the ligands with their respective bioactivities. The computer programs Sybyl and CORINA were used, respectively, for the design and three-dimensional conversion of the ligands. Molecular interaction fields were calculated using GRID program. Calculations using Volsurf resulted in a statistically consistent model with 48 structural descriptors showing that hydrophobicity is a fundamental property in the analyzed biological response.
Resumo:
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.