925 resultados para DOMS digital object management system


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Semantic Web technology is able to provide the required computational semantics for interoperability of learning resources across different Learning Management Systems (LMS) and Learning Object Repositories (LOR). The EU research project LUISA (Learning Content Management System Using Innovative Semantic Web Services Architecture) addresses the development of a reference semantic architecture for the major challenges in the search, interchange and delivery of learning objects in a service-oriented context. One of the key issues, highlighted in this paper, is Digital Rights Management (DRM) interoperability. A Semantic Web approach to copyright management has been followed, which places a Copyright Ontology as the key component for interoperability among existing DRM systems and other licensing schemes like Creative Commons. Moreover, Semantic Web tools like reasoners, rule engines and semantic queries facilitate the implementation of an interoperable copyright management component in the LUISA architecture.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report of a submission being made to a major international software engineering standards group, the Object Management Group which ties together OMG standards with World-Wide Web Consortium and International Standards Organization standards. Major industry bodies including IBM are collaborating, and the submission has the support of 24 companies. OMG, W3C and ISO standards strongly influence the industry, especially in combination. Colomb was a major contributor, responsible for 30% of the submission, and the primary author of the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a system for dynamic network resource configuration in environments with bandwidth reservation and path restoration mechanisms. Our focus is on the dynamic bandwidth management results, although the main goal of the system is the integration of the different mechanisms that manage the reserved paths (bandwidth, restoration, and spare capacity planning). The objective is to avoid conflicts between these mechanisms. The system is able to dynamically manage a logical network such as a virtual path network in ATM or a label switch path network in MPLS. This system has been designed to be modular in the sense that in can be activated or deactivated, and it can be applied only in a sub-network. The system design and implementation is based on a multi-agent system (MAS). We also included details of its architecture and implementation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2005, Wetland Studies and Solutions, Inc. (WSSI) installed an extensive Low Impact Development (LID) stormwater management system on their new office site in Gainesville, Virginia. The 4-acre site is serviced by a network of LID components: permeable pavements (two proprietary and one gravel type), bioretention cell / rain garden, green roof, vegetated swale, rainwater harvesting and drip irrigation, and slow-release underground detention. The site consists of heavy clay soils, and the LID components are mostly integrated by a series of underdrain pipes. A comprehensive monitoring system has been designed and installed to measure hydrologic performance throughout the LID, underdrained network. The monitoring system measures flows into and out of each LID component independently while concurrently monitoring rainfall events. A sensitivity analysis and laboratory calibration has been performed on the flow measurement system. Field data has been evaluated to determine the hydrologic performance of the LID features. Finally, hydrologic models amenable to compact, underdrained LID sites have been reviewed and recommended for future modeling and design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

European public administrations must manage citizens' digital identities, particularly considering interoperability among different countries. Owing to the diversity of electronic identity management (eIDM) systems, when users of one such system seek to communicate with governments using a different system, both systems must be linked and understand each other. To achieve this, the European Union is working on an interoperability framework. This article provides an overview of eIDM systems' current state at a pan-European level. It identifies and analyzes issues on which agreement exists, as well as those that aren't yet resolved and are preventing the adoption of a large-scale model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project analyzes the challenges, issues, benefits, and lessons learned that several companies experienced while implementing integrated management systems. Based on previous experiences, this paper defines several strategies that an organization should use to increase the probability of implementing an integrated management system (IMS) successfully. Strategies include completing a feasibility analysis, creating a policy, allocating resources, developing objectives, modifying documentation, and creating a continuous monitoring process. Moreover, an organization can reduce potential obstacles by promoting a culture that encourages management commitment and employee participation. Results indicate the implementation of an IMS provides the framework to manage environmental, health, and safety programs effectively. By implementing an IMS, an organization can save time and money, as well as proactively control risk.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main requirements to DRM platforms implementing effective user experience and strong security measures to prevent unauthorized use of content are discussed. Comparison of hardware-based and software- based platforms is made showing the general inherent advantages of hardware DRM solutions. Analysis and evaluation of the main flaws of hardware platforms are conducted, pointing out the possibilities to overcome them. The overview of the existing concepts for practical realization of hardware DRM protection reveals their advantages and disadvantages and the increasing demand for creation of multi-core architecture, which could assure an effective DRM protection without decreasing the user’s freedom and importing risks for end system security.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In his study - Evaluating and Selecting a Property Management System - by Galen Collins, Assistant Professor, School of Hotel and Restaurant Management, Northern Arizona University, Assistant Professor Collins states briefly at the outset: “Computerizing a property requires a game plan. Many have selected a Property Management System without much forethought and have been unhappy with the final results. The author discusses the major factors that must be taken into consideration in the selection of a PMS, based on his personal experience.” Although, this article was written in the year 1988 and some information contained may be dated, there are many salient points to consider. “Technological advances have encouraged many hospitality operators to rethink how information should be processed, stored, retrieved, and analyzed,” offers Collins. “Research has led to the implementation of various cost-effective applications addressing almost every phase of operations,” he says in introducing the computer technology germane to many PMS functions. Professor Collins talks about the Request for Proposal, its conditions and its relevance in negotiating a PMS system. The author also wants the system buyer to be aware [not necessarily beware] of vendor recommendations, and not to rely solely on them. Exercising forethought will help in avoiding the drawback of purchasing an inadequate PMS system. Remember, the vendor is there first and foremost to sell you a system. This doesn’t necessarily mean that the adjectives unreliable and unethical are on the table, but do be advised. Professor Collins presents a graphic outline for the Weighted Average Approach to Scoring Vendor Evaluations. Among the elements to be considered in evaluating a PMS system, and there are several analyzed in this essay, Professor Collins advises that a perspective buyer not overlook the service factor when choosing a PMS system. Service is an important element to contemplate. “In a hotel environment, the special emphasis should be on service. System downtime can be costly and aggravating and will happen periodically,” Collins warns. Professor Collins also examines the topic of PMS system environment; of which the importance of such a factor should not be underestimated. “The design of the computer system should be based on the physical layout of the property and the projected workloads. The heart of the system, housed in a protected, isolated area, can support work stations strategically located throughout the property,” Professor Collins provides. A Property Profile Description is outlined in Table 1. The author would also point out that ease-of-operation is another significant factor to think about. “A user-friendly software package allows the user to easily move through the program without encountering frustrating obstacles,” says Collins. “Programs that require users to memorize abstract abbreviations, codes, and information to carry out standard routines should be avoided,” he counsels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tämän kandidaatintutkimuksen tarkoituksena on löytää vastaus siihen, miten vahva voi olla DRM-systeemi, ennen kuin kuluttajat eivät enää hyväksy sitä. DRM-systeemejä on monen tasoisia, mutta ne eivät ole soveltuvia sellaisenaan kaikille eri alustoille. Peliteollisuuden digitaalisten käyttöoikeuksien hallintajärjestelmillä on omanlaisensa lainalaisuudet kuin esimerkiksi musiikkiteollisuudella. Lisäksi on olemassa tietty tämän hetkinen hyväksytty DRM:n taso, josta voi olla vaarallista poiketa. Tutkimus on luonteeltaan laadullinen tutkimus. Työssä on sovellettu sekä diskurssi- että sisällönanalyysin oppeja. Tutkimuksen aineistona on erilaisten viestiketjujen tekstit, joiden pohjalta pyritään löytämään vastaus tutkimuskysymykseen. Ketjut on jaettu eri vahvuisiksi sen perusteella, miten vahva on DRM:ää koskeva uutinen, jonka pohjalta viestiketju on syntynyt. Koska aineisto on puhuttua kieltä ja sillä on aina oma merkityksensä kontekstissaan, ovat valitut menetelmät soveltuvia analysoimaan aineistoa. Eri ketjujen analyysien tuloksien pohjalta voidaan sanoa, että DRM ei voi olla sitä tasoa suurempi kuin mikä on sen hetkinen vallitseva taso. Jos tästä tasosta poiketaan pikkaisenkin, voi se aiheuttaa suurta närästystä kuluttajien keskuudessa, jopa siihen saakka, että yritys menettää tuloja. Sen hetkiseen tasoon on päästy erinäisten kokeilujen kautta, joista kuluttajat ovat kärsineet, joten he eivät suosiolla hyväksy yhtään sen suurempaa tasoa kuin mikä vallitsee sillä hetkellä. Jos yritys näkee, että tasoa on pakko tiukentaa, täytyy tiukennus tehdä pikkuhiljaa ja naamioida se lisäominaisuuksilla. Kuluttajat ovat tietoisia omista oikeuksistaan, eivätkä he helpolla halua luopua niistä yhtään sen enempää kuin on tarpeellista.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A knowledge management tool developed by the GIS Center for to support project reporting tools, project publications, and a project data portal for materials related to the WAWASH Program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this article is to analyze the theoretical model proposed by [Jabbour CJC, Santos FCA. Relationships between human resource dimensions and environmental management in companies: proposal of a model. Journal of Cleaner Production 2008;16(1):5 1-8.] based on the data collected in four Brazilian companies. This model investigates how the phases of the environmental management system can be linked to human resource practices in order to attain continuous improvement of a company`s environmental performance. Our aim is to contribute to a field, which has little empirical evidence. Although the interaction between the phases of the environmental management system and human resource practices is recommended by the specialized literature [Daily BE Huang S. Achieving sustainability through attention to human resource factors in environmental management. International Journal of Operations and Production Management 2001:21(12):1539-52.], the results indicate that most of the theoretical assumptions could not be confirmed in these Brazilian companies. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a proposal for a Quality Management System for a generic GNSS Surveying Company as an alternative for management and service quality improvements. As a result of the increased demand for GNSS measurements, a large number of new or restructured companies were established to operate in that market. Considering that GNSS surveying is a new process, some changes must be performed in order to accommodate the old surveying techniques and the old fashioned management to the new reality. This requires a new management model that must be based on a well-described procedure sequence aiming at the Total Management Quality for the company. The proposed Quality Management System was based on the requirements of the Quality System ISO 9000:2000, applied to the whole company, focusing on the productive process of GNSS surveying work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study is to characterize how Portuguese Small and Medium Enterprises (SMEs) view the Occupational Health and Safety Management Systems (OHSMSs) certification process, after receiving the Quality Management System (QMS) certification. References were based on the ISO 9001 standard for a QMS and OHSAS 18001 for OHSMS. The method used to evaluate the implemented systems, was by form of questionnaire. Those questioned had to have a certified quality management system, an implemented OHSMS and be a SME. The questionnaire was sent to 300 SMEs; 46 responses were received and validated. Of them, only 12 SMEs had the OHSMS certificate according to OHSAS 18001. Within those 12 companies that participated: 7 SMEs are from the industrial sector; 3 belong to the electricity/telecommunications sector and 2 SMEs are from the trade/services activity sector. The size of the sample was small, but corresponds to Portuguese reality. Moreover, 34 SMEs did not have the OHSMS certificate. The questionnaire requested the main reasons for SMEs to opt for non-certification and it was related with high costs, while the main reasons to certificate were, among others, needed to eliminate or minimize risks to workers. The main benefits that Portuguese SMEs have gained from the referred certifications have been, improved working conditions, ensuring compliance with legislation and better internal communication about risks and hazards. Also presented are the main difficulties in achieving an OHSMS certification including high certification costs, difficulties motivating personnel, difficulties in changing the company’s culture and increased bureaucracy.