976 resultados para Control Model
Resumo:
Among the various work stress models, one of the most popular has been the job demands-control (JDC) model developed by Karasek (1979), which postulates that work-related strain is highest under work conditions characterized by high demands and low autonomy. The absence of social support at work further increases negative outcomes. This model, however, does not apply equally to all individuals and to all cultures. This review demonstrates how various individual characteristics, especially some personality dimensions, influence the JDC model and could thus be considered buffering or moderator factors. Moreover, we review how the cultural context impacts this model as suggested by results obtained in European, American, and Asian contexts. Yet there are almost no data from Africa or South America. More crosscultural studies including populations from these continents would be valuable for a better understanding of the impact of the cultural context on the JDC model.
Resumo:
This was a cross-sectional study that aimed to assess the association between work-related stress according to the Demand-Control Model, and the occurrence of Minor Psychic Disorder (MPD) in nursing workers. The participants were 335 professionals, out of which 245 were nursing technicians, aged predominantly between 20 and 40 years. Data were collected using the Job Stress Scale and the Self-Reporting Questionnaire-20. The analysis was performed using descriptive and analytical statistics. The prevalence of suspected MPD was 20.6%. Workers classified in the quadrants active job and high strain of the Demand-Control Model presented higher potential for developing MPD compared with those classified in the quadrant low strain. In conclusion, stress affects the mental health of workers and the aspects related to high psychological demands and high control still require further insight in order to understand their influence on the disease processes of nursing workers.
Resumo:
The general objective of this work was to develop a monitoring and management model for aquatic plants that could be used in reservoir cascades in Brazil, using the reservoirs of AES-Tiete as a study case. The investigations were carried out at the reservoirs of Barra-Bonita, Bariri, Ibitinga, Promissao, and Nova-Avanhandava, located in the Tiete River Basin; Agua Vermelha, located in the Grande River Basin; Caconde, Limoeiro, and Euclides da Cunha, which are part of the Pardo River Basin; and the Mogi-Guacu reservoir, which belongs to the Mogi-Guacu River basin. The main products of this work were: development of techniques using satellite-generated images for monitoring and planning aquatic plant control; planning and construction of a boat to move floating plant masses and an airboat equipped with a DGPS navigation and application flow control system. Results allowed to conclude that the occurrence of all types of aquatic plants is directly associated with sedimentation process and, consequently, with nutrient and light availability. Reservoirs placed at the beginning of cascades are more subject to sedimentation and occurrence of marginal, floating and emerged plants, and are the priority when it comes to controlling these plants, since they provide a supply of weeds for the other reservoirs. Reservoirs placed downstream show smaller amounts of water-suspended solids, with greater transmission of light and occurrence of submerged plants.
Resumo:
Flash floods are of major relevance in natural disaster management in the Mediterranean region. In many cases, the damaging effects of flash floods can be mitigated by adequate management of flood control reservoirs. This requires the development of suitable models for optimal operation of reservoirs. A probabilistic methodology for calibrating the parameters of a reservoir flood control model (RFCM) that takes into account the stochastic variability of flood events is presented. This study addresses the crucial problem of operating reservoirs during flood events, considering downstream river damages and dam failure risk as conflicting operation criteria. These two criteria are aggregated into a single objective of total expected damages from both the maximum released flows and stored volumes (overall risk index). For each selected parameter set the RFCM is run under a wide range of hydrologic loads (determined through Monte Carlo simulation). The optimal parameter set is obtained through the overall risk index (balanced solution) and then compared with other solutions of the Pareto front. The proposed methodology is implemented at three different reservoirs in the southeast of Spain. The results obtained show that the balanced solution offers a good compromise between the two main objectives of reservoir flood control management
Resumo:
Postprint
Resumo:
"Georgia Institute of Technology."
Resumo:
This work deals with a procedure for model re-identification of a process in closed loop with ail already existing commercial MPC. The controller considered here has a two-layer structure where the upper layer performs a target calculation based on a simplified steady-state optimization of the process. Here, it is proposed a methodology where a test signal is introduced in a tuning parameter of the target calculation layer. When the outputs are controlled by zones instead of at fixed set points, the approach allows the continuous operation of the process without an excessive disruption of the operating objectives as process constraints and product specifications remain satisfied during the identification test. The application of the method is illustrated through the simulation of two processes of the oil refining industry. (c) 2008 Elsevier Ltd. All rights reserved.
Resumo:
Recent developments in vehicle steering systems offer new opportunities to measure the steering torque and reliably estimate the vehicle sideslip and the tire-road friction coefficient. This paper presents an approach to vehicle stabilization that leverages these estimates to define state boundaries that exclude unstable vehicle dynamics and utilizes a model predictive envelope controller to bound the vehicle motion within this stable region of the state space. This approach provides a large operating region accessible by the driver and smooth interventions at the stability boundaries. Experimental results obtained with a steer-by-wire vehicle and a proof of envelope invariance demonstrate the efficacy of the envelope controller in controlling the vehicle at the limits of handling.
Resumo:
Mode of access: Internet.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.
Resumo:
How are the image statistics of global image contrast computed? We answered this by using a contrast-matching task for checkerboard configurations of ‘battenberg’ micro-patterns where the contrasts and spatial spreads of interdigitated pairs of micro-patterns were adjusted independently. Test stimuli were 20 × 20 arrays with various sized cluster widths, matched to standard patterns of uniform contrast. When one of the test patterns contained a pattern with much higher contrast than the other, that determined global pattern contrast, as in a max() operation. Crucially, however, the full matching functions had a curious intermediate region where low contrast additions for one pattern to intermediate contrasts of the other caused a paradoxical reduction in perceived global contrast. None of the following models predicted this: RMS, energy, linear sum, max, Legge and Foley. However, a gain control model incorporating wide-field integration and suppression of nonlinear contrast responses predicted the results with no free parameters. This model was derived from experiments on summation of contrast at threshold, and masking and summation effects in dipper functions. Those experiments were also inconsistent with the failed models above. Thus, we conclude that our contrast gain control model (Meese & Summers, 2007) describes a fundamental operation in human contrast vision.
Resumo:
The present study examined the effects of work control and job demands on employee adjustment and work performance using a multidimensional measure of work control (assessing levels of task control, decision control and work scheduling control). It was proposed that the negative effects of job demands and employee adjustment would be moderated by high levels of task control. It was also proposed that there would be evidence of main effects of both job demands and work control (particularly task-related levels of control) on employee adjustment. To test these predictions, a study of 135 university employees holding administrative positions was undertaken. Methodological improvements over previous research included the use of both self-reported adjustment measures and supervisor ratings of work performance as outcome variables, and the assessment of the predictor and outcome measures at different points in time (self-reported adjustment was assessed at both Times 1 and 2). The results revealed some support for the proposal that the effects of job demands would be buffered by high levels of task control, but not more peripheral aspects of work control. There were also significant main effects of task control on job satisfaction.
Resumo:
Extensive research conducted in the occupational stress literature has failed to provide convincing support for the stress-buffering effects of work control on employee adjustment. Drawing on research conducted in the laboratory context, it was proposed that the stress-buffering effects of work control on employee adjustment would be more marked at high, rather than low, levels of self-efficacy. In a sample of 100 customer service representatives, a significant three-way interaction among role conflict, work control and self-efficacy (measured at Time 1) was observed on (low) depersonalization (measured at Time 2). Consistent with expectations, work control reduced the negative effects of work stress on this outcome measure only for employees who perceived high levels of self-efficacy at work. In addition, there was evidence to suggest that self-efficacy moderated the main effects of work control on job satisfaction and somatic health. These findings are discussed hi terms of their theoretical contribution to the job strain model, and also in relation to workplace interventions designed to improve levels of employee adjustment.
Resumo:
This article addresses the problem of obtaining reduced complexity models of multi-reach water delivery canals that are suitable for robust and linear parameter varying (LPV) control design. In the first stage, by applying a method known from the literature, a finite dimensional rational transfer function of a priori defined order is obtained for each canal reach by linearizing the Saint-Venant equations. Then, by using block diagrams algebra, these different models are combined with linearized gate models in order to obtain the overall canal model. In what concerns the control design objectives, this approach has the advantages of providing a model with prescribed order and to quantify the high frequency uncertainty due to model approximation. A case study with a 3-reach canal is presented, and the resulting model is compared with experimental data. © 2014 IEEE.