954 resultados para Construction industry - Cost effectiveness


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The principle aim of the research is to develop a framework that provides certainty for end-users and clients to achieve, from capital works projects, an outstanding or excellent outcome while creating additional wealth for all stakeholders and suppliers. If the framework were applied to all Australian capital works projects, there would be $10bn savings each year to the total economy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Little research has been conducted into the cost and prevention of self-harm in the workplace. AIMS: To quantify the economic cost of self-harm and suicide among New South Wales (NSW) construction industry (CI) workers and to examine the potential economic impact of implementing Mates in Construction (MIC). METHOD: Direct and indirect costs were estimated. Effectiveness was measured using the relative risk ratio (RRR). In Queensland (QLD), relative suicide risks were estimated for 5-year periods before and after the commencement of MIC. For NSW, the difference between the expected (i.e., using NSW pre-MIC [2008-2012] suicide risk) and counterfactual suicide cases (i.e., applying QLD RRR) provided an estimate of potential suicide cases averted in the post-MIC period (2013-2017). Results were adjusted using the average uptake (i.e., 9.4%) of MIC activities in QLD. Economic savings from averted cases were compared with the cost of implementing MIC. RESULTS: The cost of self-harm and suicide in the NSW CI was AU $527 million in 2010. MIC could potentially avert 0.4 suicides, 1.01 full incapacity cases, and 4.92 short absences, generating annual savings of AU $3.66 million. For every AU $1 invested, the economic return is approximately AU $4.6. CONCLUSION: MIC represents a positive economic investment in workplace safety.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Training is essential to the growth and economic well-being of a nation. This need for training pervades all levels of industry, from a national level where a country’s well being is enhanced by training, to each company where productivity is improved, down to the individual whose skills are enhanced and as a result improve their position in the employment marketplace. The Australian Bureau of Statistics report ‘Training and Education Experience –Australia’ (ABS 1993) indicates that training in Australia is undertaken at a significant level with some 86% of employers undertaking some form of training. This is slightly higher in the Finance industry at a little over 89%. On the job training is undertaken by 82% of employers and off the job training is used by 47% of employers. In 80% of the off the job cases these courses were conducted in a conventional manner using an instructor. The remaining 20% of cases were either self paced (14%) or instructor based (6%). These latter cases could involve Computer Based Training (CBT). The report, referred to in the last paragraph, also indicates that a significant aspect of business in Australia is that 95% of businesses have less than 20 staff. This poses significant problems in that the ability to deliver effective training is limited. With businesses as small as these their size does not permit them to carry specialist training personnel so this role falls to the senior staff. These people already have a full workload and their ability to be able to take on training duties is limited. In addition these people were employed for their technical skills, not training. It may be that their ability to fill the role of a trainer is not good and as a result the training may not be very effective. In addition, small business has difficulty in releasing staff for training, The difficulties faced by small business were recognised by the Australian National Training Authority in their 1995 report which indicated that there was a need to develop a ‘training culture’ among small business employers. The authority made a commitment to provide flexible delivery strategies. This includes Computer Based Training (CBT). CBT has existed since the 1970’s. It came on to the scene with a flourish and tended to provide ‘page turning’ programs or ‘drill and practice programs’. In limited areas this form of training became popular but its popularity waned in the 80’s. With the advent of better graphical displays, larger and faster memory, and improved programs in the 1990’s the quality of CBT today is superior to those offered in the 70’s and has greater appeal. Today, still photographs and video clips can be displayed and made interactive. Because of this CBT is making a comeback and starting to have a greater impact. The insurance industry covers a wide range of companies in Australia, these companies vary in size from companies with employees in the thousands to companies with less than five staff. While the needs of the employees of each are similar the ability of these companies to deliver the training varies significantly. Any training can be divided into two parts. Internal or on the job training and external. External training deals with those aspects that concern the industry as a whole whereas internal training affects the individual company. Internal training would deal with matters like company procedures, company products and the like. External training deals with matters such as legislation, products generally, and the like. In the insurance industry the major problem arises with the small companies. Insurance companies would tend to be large in size and able to cover their training costs but the insurance brokers who would make up, numerically, the major number of companies would have a significant number of companies that fall into the 20 staffer less category. In fact many would have a staff of less than 5. While CBT can benefit all companies it is these small companies that could benefit from it the most. This thesis examines: • The place of CBT in training, its cost and effectiveness. • The incidence of CBT in the insurance industry and how the industry determines its effectiveness. • If a program that meets an industry need is able to be produced at a realistic price?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organisations need to rely on leadership, information support and human capital in order to ensure a knowledge advantage over their competitors. Knowledge management (KM) provides organisations with sustainable competitive advantage, because it becomes extremely difficult for an organisation to cut expenditure and increase revenue by simply reengineering its business model. Project delivery and success has been traditionally viewed and measured as management of a three-legged stool, with the legs defined as cost, schedule and quality. However, KM can be linked to success by organisations becoming more effective as well as being more efficient.

This paper uses a KM framework, the Knowledge Advantage (K-Adv), developed initially for use by construction organisations. It assesses the impact of leadership and its supporting information communication technology infrastructure on the ability of people (by effectively creating, sharing, disseminating and using knowledge) to facilitate sustainable competitive advantage.

A case study that is presented is based upon the experience of a leading construction company using an Enterprise Resources Planning (ERP) system to demonstrate the effectiveness of KM from a cost management business unit perspective. Results are evaluated using a capability maturity model (CMM) - that forms the core of the K-Adv tool - to help improve processes that meet the needs of the organisation operating in a highly dynamic business environment. The case study is part of a broader doctoral research project that uses action learning to facilitate and measure ERP improvement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cost estimation process is undertaken to predict the total cost of the project. Studies indicate that one of the construction company failures in contracting is because of the uncertain, incorrect, and unrealistic cost estimation. Cost estimation process are heavily influenced by the complexity of the project, scale and scope of construction, market conditions, method of construction, site constraints, client’s financial position, buildability and the location of the project. However, there are other combinations factors that have not been studied thus far. Hence, this paper focuses on the review of other researchers’ findings in relation to cost estimation issues in the construction industry. Among the findings, it has been revealed that the cost estimation issues are related to accuracy, human factors, practical knowledge and insufficient cost data/information. The aim of this paper is to investigate these factors and determining other potential factors that may influence cost estimation process in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The possibility of winning the tender is subject to the cost estimation proposed by the contractors compared to the cost estimation prepared by the client’s representative. Studies indicated that one of the construction company failures in the tendering process is due to the uncertain, incorrect, and unrealistic cost estimation. Failure to provide a competitive cost estimation on time is the main reason the contractor is not successful in winning the tender, and will not be considered for the tender evaluation stage. The aim of this paper is to validate the key factors that affect the cost estimation activities in the tender preparation process. This paper describes the results of a pilot study, from a questionnaire survey on the factors that affect the cost estimation activities in the tender preparation process. The study shows the importance of all the factors in the cost estimation activities in the tender preparation process in terms of human factors, working culture, and information technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to investigate the cost management practices of building industry companies of Parana that follow the typology of Porter's strategies. The sample comprises member companies of the Association of Construction Industries of the State of Parana (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis of the data allowed us to identify two groups of cost management practices. Analyses suggest equality between the adopted cost management practices and the Cost Control Planning (CCP) practices among the companies of the Group 1, regardless of the generic strategy adopted. The companies of the Group 2 that adopted the differentiation strategy seem to use mainly the ACR cost management practice. Our findings differ from those obtained by Chenhall insofar as companies that adopt low cost strategies tend to use managerial controls focused on cost control and rigid budgetary controls.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the early 1980s, researchers and practitioners in the organisational and management fields have presumed a link between organisational, or corporate, culture and organisational performance. Whilst many believe this exists, other authors have been critical of the validity of such studies. Part of this doubt stems from a reliance on measures of organisational performance that are based purely on financial measures of business growth. Using the construction industry as the subject of his research, Vaughan Coffey traces the development of the literature on organisational culture and business effectiveness and investigates the culture–performance link using a new and highly objective measure of company performance and an evaluation of organisational culture, which is largely behaviourally-based. Providing a theoretical contribution to the field, this work shows that various cultural traits appear to be closely linked to objectively measured organisational effectiveness. This book will be valuable to professionals and researchers in the fields of management and public policy. It indicates directions for construction companies to develop and change, and in doing so strengthen their chances of remaining strong when opportunities for work might deplete and only the most successful companies will be able to survive.---- Selected Contents: 1. An Introduction to Organizations, Culture, Performance and Construction 2. Organizations, Culture and Climate 3. Organizational Culture Studies 4. Measuring Organizational Performance and Effectiveness 5. Organizational Culture and Effectiveness – The Link Between Them 6. Research on the Relationship between Organizational Culture and Performance in Hong Kong Construction Companies 7. The Hong Kong Experiment – Presentation of Demographic Data, Overall Results and some Descriptive and Qualitative Analysis 8. Detailed Statistical Analysis of the Docs and Pass Data in Relation to the Major Research Questions 9. Four Hong Kong Construction Mini-Case Studies 10. Conclusions and Future Research Directions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Ecological sustainable development (ESD), defined as that which meets the needs of the present without compromising the ability of future generations to meet their own needs, has much to offer in enhancing the quality of life of people and maintaining the environment for future generations by reducing the pollution of water, air and land, minimizing the destruction of irreplaceable ecosystems and cutting down the amount of toxic materials released. However, there is still much to do to achieve full implementation world-wide. This paper reports on three factors-design, attitudes and financial constraints - that are likely barriers to the implementation of ESD within the built environment in Australian industry. A postal questionnaire survey is described aimed at soliciting views on detailed aspects of the factors. This shows that ESD in the Australian built environment has also not been successfully implemented. The main reason is found to be due to the perceived costs involved - the cost of using environmental materials being a predominant factor. The design of ESD, being more sophisticated, also is perceived as involving stakeholders in more expense. There also appears to be a lack of knowledge and a lack of specialised and interdisciplinary design teams available in the Australian context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background Total hip arthroplasty (THA) is a commonly performed procedure and numbers are increasing with ageing populations. One of the most serious complications in THA are surgical site infections (SSIs), caused by pathogens entering the wound during the procedure. SSIs are associated with a substantial burden for health services, increased mortality and reduced functional outcomes in patients. Numerous approaches to preventing these infections exist but there is no gold standard in practice and the cost-effectiveness of alternate strategies is largely unknown. Objectives The aim of this project was to evaluate the cost-effectiveness of strategies claiming to reduce deep surgical site infections following total hip arthroplasty in Australia. The objectives were: 1. Identification of competing strategies or combinations of strategies that are clinically relevant to the control of SSI related to hip arthroplasty 2. Evidence synthesis and pooling of results to assess the volume and quality of evidence claiming to reduce the risk of SSI following total hip arthroplasty 3. Construction of an economic decision model incorporating cost and health outcomes for each of the identified strategies 4. Quantification of the effect of uncertainty in the model 5. Assessment of the value of perfect information among model parameters to inform future data collection Methods The literature relating to SSI in THA was reviewed, in particular to establish definitions of these concepts, understand mechanisms of aetiology and microbiology, risk factors, diagnosis and consequences as well as to give an overview of existing infection prevention measures. Published economic evaluations on this topic were also reviewed and limitations for Australian decision-makers identified. A Markov state-transition model was developed for the Australian context and subsequently validated by clinicians. The model was designed to capture key events related to deep SSI occurring within the first 12 months following primary THA. Relevant infection prevention measures were selected by reviewing clinical guideline recommendations combined with expert elicitation. Strategies selected for evaluation were the routine use of pre-operative antibiotic prophylaxis (AP) versus no use of antibiotic prophylaxis (No AP) or in combination with antibiotic-impregnated cement (AP & ABC) or laminar air operating rooms (AP & LOR). The best available evidence for clinical effect size and utility parameters was harvested from the medical literature using reproducible methods. Queensland hospital data were extracted to inform patients’ transitions between model health states and related costs captured in assigned treatment codes. Costs related to infection prevention were derived from reliable hospital records and expert opinion. Uncertainty of model input parameters was explored in probabilistic sensitivity analyses and scenario analyses and the value of perfect information was estimated. Results The cost-effectiveness analysis was performed from a health services perspective using a hypothetical cohort of 30,000 THA patients aged 65 years. The baseline rate of deep SSI was 0.96% within one year of a primary THA. The routine use of antibiotic prophylaxis (AP) was highly cost-effective and resulted in cost savings of over $1.6m whilst generating an extra 163 QALYs (without consideration of uncertainty). Deterministic and probabilistic analysis (considering uncertainty) identified antibiotic prophylaxis combined with antibiotic-impregnated cement (AP & ABC) to be the most cost-effective strategy. Using AP & ABC generated the highest net monetary benefit (NMB) and an incremental $3.1m NMB compared to only using antibiotic prophylaxis. There was a very low error probability that this strategy might not have the largest NMB (<5%). Not using antibiotic prophylaxis (No AP) or using both antibiotic prophylaxis combined with laminar air operating rooms (AP & LOR) resulted in worse health outcomes and higher costs. Sensitivity analyses showed that the model was sensitive to the initial cohort starting age and the additional costs of ABC but the best strategy did not change, even for extreme values. The cost-effectiveness improved for a higher proportion of cemented primary THAs and higher baseline rates of deep SSI. The value of perfect information indicated that no additional research is required to support the model conclusions. Conclusions Preventing deep SSI with antibiotic prophylaxis and antibiotic-impregnated cement has shown to improve health outcomes among hospitalised patients, save lives and enhance resource allocation. By implementing a more beneficial infection control strategy, scarce health care resources can be used more efficiently to the benefit of all members of society. The results of this project provide Australian policy makers with key information about how to efficiently manage risks of infection in THA.