The factors that affect the cost estimation activities in the tender preparation process in the Malaysian construction industry


Autoria(s): Ahmad, Normila; Osman-Schlegel, Linda
Contribuinte(s)

Vimonsatit, Vanissorn

Singh, Amarjit

Yazdani, Siamak

Data(s)

01/01/2013

Resumo

The possibility of winning the tender is subject to the cost estimation proposed by the contractors compared to the cost estimation prepared by the client’s representative. Studies indicated that one of the construction company failures in the tendering process is due to the uncertain, incorrect, and unrealistic cost estimation. Failure to provide a competitive cost estimation on time is the main reason the contractor is not successful in winning the tender, and will not be considered for the tender evaluation stage. The aim of this paper is to validate the key factors that affect the cost estimation activities in the tender preparation process. This paper describes the results of a pilot study, from a questionnaire survey on the factors that affect the cost estimation activities in the tender preparation process. The study shows the importance of all the factors in the cost estimation activities in the tender preparation process in terms of human factors, working culture, and information technology.

Identificador

http://hdl.handle.net/10536/DRO/DU:30051276

Idioma(s)

eng

Publicador

Research Publishing Services

Relação

http://dro.deakin.edu.au/eserv/DU:30051276/ahmad-thefactors-2013.pdf

http://dro.deakin.edu.au/eserv/DU:30051276/evid-aseasec1confandrvwgnrl-2013.pdf

http://isec-society.org/ASEA_SEC_01/

Direitos

2013, Research Publishing Services

Palavras-Chave #cost estimation #cost estimation accuracy #contractor #The malaysian construction industry #tender preparation process #pilot study
Tipo

Conference Paper