891 resultados para Complex Project Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The subject of management is renowned for its addiction to fads and fashions. Project Management is no exception. The issue of interest for this paper is the establishment of the 'College of Complex Project Managers' and their 'competency standard for complex project managers.' Both have generated significant interest in the Project Management community, and like any other human endeavour they should be subject to critical evaluation. The results of this evaluation show significant flaws in the definition of complex in this case, the process by which the College and its standard have emerged, and the content of the standard. However, there is a significant case for a portfolio of research that extends the existing bodies of knowledge into large-scale complicated (or major) projects that would be owned by the relevant practitioner communities, rather than focused on one organization. Research questions are proposed that would commence this stream of activity towards an intelligent synthesis of what is required to manage in both complicated and truly complex environments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Para hacerse cargo del legado de las Plantas de Gas Manufacturado (MGP) en el Estado de Nueva York, la División de Remediación Medioambiental del Departamento de Conservación Medioambiental, creo las Investigaciones de las áreas afectadas y el Programa de Remediación Medioambiental. Con el paso de los años, la conciencia y entendimiento de la importancia y complejidad de estos proyectos fue creciendo, ya que las investigaciones realizadas daban fe del tamaño y extensión de la contaminación asociada a las plantas de gas manufacturado, propiedad ahora de las diversas compañías de gas que operan a lo largo y ancho del Estado de Nueva York. Tras varios años dentro del Programa de Remediación Medioambiental, muchas de estas compañías han intentado manejar estos vastos y complejos proyectos como han podido, dejándose llevar un poco, subestimando y pasando por alto muchos detalles, ya que al fin y al cabo son proyecto regulados por el estado y que, por tanto, son financiados enteramente por este. Esto ha ido causando en los últimos años grandes problemas a algunas Compañías que a la hora de reportar estos proyectos se han encontrado con una falta total de control y grandes lagunas que resolver. Una técnica para resolver estos problemas es hacer uso de grandes técnicas de gestión empresarial como es el Project Management. En este proyecto se exponen y desarrollan las técnicas que han de utilizarse para integrar la Gestión de Proyectos con el fin de poder gestionar y coordinar las competentes demandas de alcance, tiempo, costes, calidad, recursos, y riesgos con el fin de alcanzar los requerimientos y objetivos del proyecto y de la Compañía. ABSTRACT To address the Manufactured Gas Plant (MGP) legacy in New York State, the Department of Environmental Conservation’s Division of Environmental Remediation has established the MGP Site Investigation and Remediation Programs. With the passage of time the Department’s understanding of the complexity of these sites grew, as investigations identified the extend of the contamination problem associated with many MGPs, property of the Operating Companies in the State. Through many years under the Remediation Programs, some Operating Companies have tried to manage these large and complex projects as they could, underestimating and overlooking them, as they were, in fact, regulated and financed by the Department. This has cause a lot of controlling issues and gaps to solve to the companies. Now the companies are trying to solve this kind of problems using the more innovative management techniques, as Project Management. This project expose and explains how to integrate the project management processes into the MGP Projects under the Remediation Program, to manage and balance the competing demands of scope, time ,cost, quality, resources, and risk to meet the project and company’s requirements and objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Society, as we know it today, is completely dependent on computer networks, Internet and distributed systems, which place at our disposal the necessary services to perform our daily tasks. Moreover, and unconsciously, all services and distributed systems require network management systems. These systems allow us to, in general, maintain, manage, configure, scale, adapt, modify, edit, protect or improve the main distributed systems. Their role is secondary and is unknown and transparent to the users. They provide the necessary support to maintain the distributed systems whose services we use every day. If we don’t consider network management systems during the development stage of main distributed systems, then there could be serious consequences or even total failures in the development of the distributed systems. It is necessary, therefore, to consider the management of the systems within the design of distributed systems and systematize their conception to minimize the impact of the management of networks within the project of distributed systems. In this paper, we present a formalization method of the conceptual modelling for design of a network management system through the use of formal modelling tools, thus allowing from the definition of processes to identify those responsible for these. Finally we will propose a use case to design a conceptual model intrusion detection system in network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project supported the planning and conduct of a two-day Iowa Department of Transportation–hosted peer exchange for state agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research Program–sponsored project R10, Project Management Strategies for Complex Projects. Presentations were made by participating states, and several opportunities were provided for directed discussion. General themes emerging from the presentations and discussions were identified as follows: To implement improvements in project management processes, agency leadership needs to decide that a new approach to project management is worth pursuing and then dedicate resources to developing a project management plan. The change to formalized project management and five-dimensional project management (5DPM) requires a culture shift in agencies from segmented “silo” processes to collaborative, cooperative processes that make communication and collaboration high priorities. Agencies need trained project managers who are empowered to execute the project management plan, as well as properly trained functional staff. Project management can be centralized or decentralized with equal effect. After an agency’s project management plan and structure are developed, software tools and other resources should be implemented to support the plan and structure. All projects will benefit from enhanced project management, but the project management plan should specify appropriate approaches for several project levels as defined by factors in addition to dollar value. Project management should be included in an agency’s project development manual.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective of the thesis is to develop project management procedure for chilled beam projects. In organization is recognized that project management techniques could help in large and complex projects. Information sharing have been challenging in projects, so improvement of information sharing is one key topic of the thesis. Academic researches and literature are used to find suitable project management theories and methods. Main theories are related to phases of the project and project management tools. Practical knowledge of project management is collected from two project business oriented companies. Project management tools are chosen and modified to fulfill needs of the beam projects. Result of the thesis is proposed project management procedure, which includes phases of the chilled beam projects and project milestones. Project management procedure helps to recognize the most critical phases of the project and tools help to manage information of the project. Procedure increases knowledge of the project management techniques and tools. It also forms coherent project management working method among the chilled beam project group.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Software development is a discipline that is almost as old as the history of computers. With the advent of the Internet and all of its related technologies, software development has been on high demand. But, and especially in SME (small and medium enterprise), this was not accompanied with a comparable effort to develop a set of sustainable and standardized activities of project management, which lead to increasing inefficiencies and costs. Given the actual economic situation, it makes sense to engage in an effort to reduce said inefficiencies and rising costs. For that end, this work will analyze the current state of software development’s project management processes on a Portuguese SME, along with its problems and inefficiencies in an effort to create a standardized model to manage software development, with special attention given to critical success factors in an agile software development environment, while using the best practices in process modeling. This work also aims to create guidelines to correctly integrate these changes in the existing IS structure of a company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile Project Management emerges as a manifestation against traditional approaches, mainly due to their inability of accepting requirements’ changes. Therefore, these practices and concepts can be considered in order to reduce the risks concerning the increase of competition and innovation – which does not apply to the IT sector solely. The current study reviews the literature on Agile Project Management and its adoption across different sectors in order to assess which practices and concepts can be applied on a non-IT context. Nine different methods are reviewed, where two of these show a higher relevance – Scrum and Extreme Programming. The identified practices and concepts can be separated into four different groups: Cultural and Organizational Structures, Process, Practices, and Artefacts. A framework based on the work by Boehm & Turner in 2004 is developed in order to support the decision of adopting agile methods. A survey intended for project managers was carried in order to assess the implementation of the identified practices and concepts and to evaluate which variables have the highest importance on the developed decision support framework. It is concluded that New Product Development is the project type with the highest potential to implement an agile approach and that the Project Final Product’s Innovativeness, Competitiveness, and the Project Member’s Experience and Autonomy are the most important aspects to consider an implementation of an Agile approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tuotekehityksestä ja sen johtamisesta on tullut erittäin tärkeä osa tietoliikenneteollisuutta. Jatkuva teknologinen kehitys ja lyhentyneet tuotteiden elinkaaret ovat saaneet yritykset panostamaan tuotekehitysprosesseihin ja johtamiseen. Erityisesti nopeatempoiset ja lyhytkestoiset projektit onkin koettu ongelmallisiksi. Diplomityön tavoitteena oli tutkia teoriassa uusien tuotteiden tuotekehitystä, tuotekehitysprosesseja sekä projektijohtamista. Käytännön osuudessa oli tavoitteena kehittää kokeellinen tuotekehitysmalli nopeatempoisten ja lyhytkestoisten tuotekehitysprojektien tarpeisiin muuttuvissa ja epävarmoissa olosuhteissa. Tavoitteena oli myös käyttää ja analysoida kehitettyä kokeellista tuotekehitysmallia lyhytkestoisen tuotekehitysprojektin yhteydessä. Työn tuloksena saatiin ohjelmistotuote vaadituilla ominaisuuksilla vaaditussa ajassa ja todettiin projektissa käytetyn kokeellisen tuotekehitysmallin osoittautuneen toimivaksi. Jatkotutkimuksia tarvitaan selvittämään mallin sopivuutta ja sen kehityskohteita erilaisten tuotekehitysprojektien kohdalla.