907 resultados para Command and control system
Resumo:
In case of a major incident or disaster, the advance medical rescue command needs to manage several essential tasks simultaneously. These include the rapid deployment of ambulance, police, fire and evacuation services, and their coordinated activity, as well as triage and emergency medical care on site. The structure of such a medical rescue command is crucial for the successful outcome of medical evacuation at major incidents. However, little data has been published on the nature and structure of the command itself. This study presents a flexible approach to command structure, with two command heads: one emergency physician and one experienced paramedic. This approach is especially suitable for Switzerland, whose federal system allows for different structures in each canton. This article examines the development of these structures and their efficiency, adaptability and limitations with respect to major incident response in the French-speaking part of the country.
Resumo:
A new approach to dengue vector surveillance based on permanent egg-collection using a modified ovitrap and Bacillus thuringiensis israelensis(Bti) was evaluated in different urban landscapes in Recife, Northeast Brazil. From April 2004 to April 2005, 13 egg-collection cycles of four weeks were carried out. Geo-referenced ovitraps containing grass infusion, Bti and three paddles were placed at fixed sampling stations distributed over five selected sites. Continuous egg-collections yielded more than four million eggs laid into 464 sentinel-ovitraps over one year. The overall positive ovitrap index was 98.5% (over 5,616 trap observations). The egg density index ranged from 100 to 2,500 eggs per trap-cycle, indicating a wide spread and high density of Aedes aegypti (Diptera: Culicidae) breeding populations in all sites. Fluctuations in population density over time were observed, particularly a marked increase from January on, or later, according to site. Massive egg-collection carried out at one of the sites prevented such a population outbreak. At intra-site level, egg counts made it possible to identify spots where the vector population is consistently concentrated over the time, pinpointing areas that should be considered high priority for control activities. The results indicate that these could be promising strategies for detecting and preventing Ae. aegypti population outbreaks.
Resumo:
This work describes different possibilities of protection and control system improvement of primary distribution substation. The status of condition and main problems of power networks from reliability point of view in Russia are described. This work studies technologies used today in Russia for protection of distribution networks with their disadvantages. Majority of medium voltage networks (6-35 kV) has isolated network point. There is still no any protection available on the market which allows to estimate distance to fault in case of earth fault. The thesis analyses methods of earth fault distance calculation. On the basis of computer simulation the influence of various factors on calculation accuracy is studied. The practical implementation of the method presupposes usage of digital relay. Application of digital relay is accompanied by numerous opportunities which are described in this work. Also advantages of system implemented on the basis of IEC 61850 standard are examined. Finally, suitability of modern digital relays from GOST standard point of view is analyzed.
Researching Manufacturing Planning and Control system and Master Scheduling in a manufacturing firm.
Resumo:
The objective of this thesis is to research Manufacturing Planning and Control (MPC) system and Master Scheduling (MS) in a manufacturing firm. The study is conducted at Ensto Finland Corporation, which operates on a field of electrical systems and supplies. The paper consists of theoretical and empirical parts. The empirical part is based on weekly operating at Ensto and includes inter-firm material analysis, learning and meetings. Master Scheduling is an important module of an MPC system, since it is beneficial on transforming strategic production plans based on demand forecasting into operational schedules. Furthermore, capacity planning tools can remarkably contribute to production planning: by Rough-Cut Capacity Planning (RCCP) tool, a MS plan can be critically analyzed in terms of available key resources in real manufacturing environment. Currently, there are remarkable inefficiencies when it comes to Ensto’s practices: the system is not able to take into consideration seasonal demand and react on market changes on time; This can cause significant lost sales. However, these inefficiencies could be eliminated through the appropriate utilization of MS and RCCP tools. To utilize MS and RCCP tools in Ensto’s production environment, further testing in real production environment is required. Moreover, data accuracy, appropriate commitment to adapting and learning the new tools, and continuous developing of functions closely related to MS, such as sales forecasting, need to be ensured.
Resumo:
Supervising and controlling the many processes involved in petroleum production is both dangerous and complex. Herein, we propose a multiagent supervisory and control system for handle continuous processes like those in chemical and petroleum industries In its architeture, there are agents responsible for managing data production and analysis, and also the production equipments. Fuzzy controllers were used as control agents. The application of a fuzzy control system to managing an off-shore installation for petroleum production onto a submarine separation process is described. © 2008 IEEE.
Resumo:
Este proyecto trata de diseñar el sistema eléctrico y de control de potencia de una maqueta del túnel aerodinámico ACLA-16 de la Universidad Politécnica de Madrid (UPM). Dicha maqueta se utiliza para estudiar el efecto de la capa límite atmosférica, debido a su importancia en el impacto sobre estructuras civiles. Primero se desarrolla una parte teórica sobre qué son los túneles aerodinámicos, las aplicaciones que tienen y conceptos básicos acerca de la capa límite atmosférica. Luego se analiza el diseño geométrico de la maqueta del túnel y se detallan los elementos que debe tener el sistema eléctrico. Además, se realiza una simulación por ordenador con un programa de CFD (Fluent) para comparar los resultados experimentales reales con los resultados numéricos de la simulación para comprobar si se pueden extraer resultados aceptables por ordenador y así ahorrar costes y tiempo en el estudio de ensayos.
Resumo:
El proyecto está basado en el estudio de la planta de potencia de un túnel aerodinámico. Para ello se ha realizado una breve introducción definiendo qué es un túnel aerodinámico, cuál es su propósito, qué tipos hay, etc. Posteriormente se ha escogido un tipo concreto de túnel entre todas las posibilidades y se ha procedido a su estudio. Se ha definido una forma y unas dimensiones y tras calcular las pérdidas de carga, se ha seleccionado la planta de potencia necesaria para compensar dichas pérdidas, dimensionándose también las conexiones de esta desde la acometida de potencia eléctrica. Por último se han dimensionado las conexiones correspondientes a la iluminación y los servicios que competen al túnel aerodinámico.
Resumo:
La utilización de túneles aerodinámicos en ingeniería civil está cada vez más demandada debido al actual desarrollo urbanístico, esto es, la necesidad de edificios cada vez más altos en los que concentrar mayor cantidad de población, puentes y estructuras que faciliten el paso de medios de transporte alternativos, la importancia de los aspectos artísticos en la construcción (además de los funcionales), etc. Son muchos los factores que pueden hacer necesario el ensayo de alguna de esas estructuras en un túnel aerodinámico, y no existe un criterio universal a la hora de decidir si conviene o no hacerlo.