956 resultados para Aircraft Units
Resumo:
The operation of technical processes requires increasingly advanced supervision and fault diagnostics to improve reliability and safety. This paper gives an introduction to the field of fault detection and diagnostics and has short methods classification. Growth of complexity and functional importance of inertial navigation systems leads to high losses at the equipment refusals. The paper is devoted to the INS diagnostics system development, allowing identifying the cause of malfunction. The practical realization of this system concerns a software package, performing a set of multidimensional information analysis. The project consists of three parts: subsystem for analyzing, subsystem for data collection and universal interface for open architecture realization. For a diagnostics improving in small analyzing samples new approaches based on pattern recognition algorithms voting and taking into account correlations between target and input parameters will be applied. The system now is at the development stage.
Resumo:
An Approach with Vertical Guidance (APV) is an instrument approach procedure which provides horizontal and vertical guidance to a pilot on approach to landing in reduced visibility conditions. APV approaches can greatly reduce the safety risk to general aviation by improving the pilot’s situational awareness. In particular the incidence of Controlled Flight Into Terrain (CFIT) which has occurred in a number of fatal air crashes in general aviation over the past decade in Australia, can be reduced. APV approaches can also improve general aviation operations. If implemented at Australian airports, APV approach procedures are expected to bring a cost saving of millions of dollars to the economy due to fewer missed approaches, diversions and an increased safety benefit. The provision of accurate horizontal and vertical guidance is achievable using the Global Positioning System (GPS). Because aviation is a safety of life application, an aviation-certified GPS receiver must have integrity monitoring or augmentation to ensure that its navigation solution can be trusted. However, the difficulty with the current GPS satellite constellation alone meeting APV integrity requirements, the susceptibility of GPS to jamming or interference and the potential shortcomings of proposed augmentation solutions for Australia such as the Ground-based Regional Augmentation System (GRAS) justifies the investigation of Aircraft Based Augmentation Systems (ABAS) as an alternative integrity solution for general aviation. ABAS augments GPS with other sensors at the aircraft to help it meet the integrity requirements. Typical ABAS designs assume high quality inertial sensors to provide an accurate reference trajectory for Kalman filters. Unfortunately high-quality inertial sensors are too expensive for general aviation. In contrast to these approaches the purpose of this research is to investigate fusing GPS with lower-cost Micro-Electro-Mechanical System (MEMS) Inertial Measurement Units (IMU) and a mathematical model of aircraft dynamics, referred to as an Aircraft Dynamic Model (ADM) in this thesis. Using a model of aircraft dynamics in navigation systems has been studied before in the available literature and shown to be useful particularly for aiding inertial coasting or attitude determination. In contrast to these applications, this thesis investigates its use in ABAS. This thesis presents an ABAS architecture concept which makes use of a MEMS IMU and ADM, named the General Aviation GPS Integrity System (GAGIS) for convenience. GAGIS includes a GPS, MEMS IMU, ADM, a bank of Extended Kalman Filters (EKF) and uses the Normalized Solution Separation (NSS) method for fault detection. The GPS, IMU and ADM information is fused together in a tightly-coupled configuration, with frequent GPS updates applied to correct the IMU and ADM. The use of both IMU and ADM allows for a number of different possible configurations. Three are investigated in this thesis; a GPS-IMU EKF, a GPS-ADM EKF and a GPS-IMU-ADM EKF. The integrity monitoring performance of the GPS-IMU EKF, GPS-ADM EKF and GPS-IMU-ADM EKF architectures are compared against each other and against a stand-alone GPS architecture in a series of computer simulation tests of an APV approach. Typical GPS, IMU, ADM and environmental errors are simulated. The simulation results show the GPS integrity monitoring performance achievable by augmenting GPS with an ADM and low-cost IMU for a general aviation aircraft on an APV approach. A contribution to research is made in determining whether a low-cost IMU or ADM can provide improved integrity monitoring performance over stand-alone GPS. It is found that a reduction of approximately 50% in protection levels is possible using the GPS-IMU EKF or GPS-ADM EKF as well as faster detection of a slowly growing ramp fault on a GPS pseudorange measurement. A second contribution is made in determining how augmenting GPS with an ADM compares to using a low-cost IMU. By comparing the results for the GPS-ADM EKF against the GPS-IMU EKF it is found that protection levels for the GPS-ADM EKF were only approximately 2% higher. This indicates that the GPS-ADM EKF may potentially replace the GPS-IMU EKF for integrity monitoring should the IMU ever fail. In this way the ADM may contribute to the navigation system robustness and redundancy. To investigate this further, a third contribution is made in determining whether or not the ADM can function as an IMU replacement to improve navigation system redundancy by investigating the case of three IMU accelerometers failing. It is found that the failed IMU measurements may be supplemented by the ADM and adequate integrity monitoring performance achieved. Besides treating the IMU and ADM separately as in the GPS-IMU EKF and GPS-ADM EKF, a fourth contribution is made in investigating the possibility of fusing the IMU and ADM information together to achieve greater performance than either alone. This is investigated using the GPS-IMU-ADM EKF. It is found that the GPS-IMU-ADM EKF can achieve protection levels approximately 3% lower in the horizontal and 6% lower in the vertical than a GPS-IMU EKF. However this small improvement may not justify the complexity of fusing the IMU with an ADM in practical systems. Affordable ABAS in general aviation may enhance existing GPS-only fault detection solutions or help overcome any outages in augmentation systems such as the Ground-based Regional Augmentation System (GRAS). Countries such as Australia which currently do not have an augmentation solution for general aviation could especially benefit from the economic savings and safety benefits of satellite navigation-based APV approaches.
Resumo:
The objective of this paper is to present a benefit-cost ranking of 127 civil transport aircraft; this ranking was determined considering a new data envelopment analysis (DEA) approach, called triple index, which combines three assessment methods: 1) standard frontier, 2) inverted index; 3) cross-multiplicative index. The analysis used the following inputs: a) market price; b) direct operating costs; and as outputs: a) payload, b) cruise speed; c) maximum rate of climb with a single engine. To ensure the homogeneity of the units, the aircrafts were divided according to the propulsion system (jet and turboprop) and size (regional, narrow-body and wide-body); they were also evaluated according to different ranges in order to identify the aircraft with the best cost-benefit relationship for each option.
Resumo:
The behavior of the hydroxyl units of synthetic goethite and its dehydroxylated product hematite was characterized using a combination of Fourier transform infrared (FTIR) spectroscopy and X-ray diffraction (XRD) during the thermal transformation over a temperature range of 180-270 degrees C. Hematite was detected at temperatures above 200 degrees C by XRD while goethite was not observed above 230 degrees C. Five intense OH vibrations at 3212-3194, 1687-1674, 1643-1640, 888-884 and 800-798 cm(-1), and a H2O vibration at 3450-3445 cm(-1) were observed for goethite. The intensity of hydroxyl stretching and bending vibrations decreased with the extent of dehydroxylation of goethite. Infrared absorption bands clearly show the phase transformation between goethite and hematite: in particular. the migration of excess hydroxyl units from goethite to hematite. Two bands at 536-533 and 454-452 cm(-1) are the low wavenumber vibrations of Fe-O in the hematite structure. Band component analysis data of FTIR spectra support the fact that the hydroxyl units mainly affect the a plane in goethite and the equivalent c plane in hematite.
Resumo:
A novel technique was used to measure emission factors for commonly used commercial aircraft including a range of Boeing and Airbus airframes under real world conditions. Engine exhaust emission factors for particles in terms of particle number and mass (PM2.5), along with those for CO2, and NOx were measured for over 280 individual aircraft during the various modes of landing/takeoff (LTO) cycle. Results from this study show that particle number, and NOx emission factors are dependant on aircraft engine thrust level. Minimum and maximum emissions factors for particle number, PM2.5, and NOx emissions were found to be in the range of 4.16×1015-5.42×1016 kg-1, 0.03-0.72 g.kg-1, and 3.25-37.94 g.kg-1 respectively for all measured airframes and LTO cycle modes. Number size distributions of emitted particles for the naturally diluted aircraft plumes in each mode of LTO cycle showed that particles were predominantly in the range of 4 to 100 nm in diameter in all cases. In general, size distributions exhibit similar modality during all phases of the LTO cycle. A very distinct nucleation mode was observed in all particle size distributions, except for taxiing and landing of A320 aircraft. Accumulation modes were also observed in all particle size distributions. Analysis of aircraft engine emissions during LTO cycle showed that aircraft thrust level is considerably higher during taxiing than idling suggesting that International Civil Aviation Organization (ICAO) standards need to be modified as the thrust levels for taxi and idle are considered to be the same (7% of total thrust) [1].
Resumo:
Communities of practice (CoPs) may be defined as groups of people who are mutually bound by what they do together (Wenger, 1998, p. 2), that is, they “form to share what they know, to learn from one another regarding some aspects of their work and to provide a social context for that work” (Nickols, 2000, para. 1). They are “emergent” in that the shape and membership emerges in the process of activity (Lees, 2005, p. 7). People in CoPs share their knowledge and experiences freely with the purpose of finding inventive ways to approach new problems (Wenger & Snyder, 2000, p. 2). They can be seen as “shared histories of learning” (Wenger, 1998, p. 86). For some time, QUT staff have been involved in a number of initiatives aimed at sharing ideas and resources for teaching first year students such as the Coordinators of Large First Year Units Working Party. To harness these initiatives and maximise their influence, the leaders of the Transitions In Project (TIP)1 decided to form a CoP around the design, assessment and management of large first year units.
Resumo:
The composition of many professional services firms in the Urban Development area has moved away from a discipline specific ‘silo’ structure to a more multidisciplinary environment. The benefits of multidisciplinarity have been seen in industry by providing synergies across many of the related disciplines. Similarly, the Queensland University of Technology, Bachelor of Urban Development degree has sought to broaden the knowledge base of students and achieve a greater level of synergy between related urban development disciplines through the introduction of generic and multidisciplinary units. This study aims to evaluate the effectiveness of delivering core property units in a multidisciplinary context. A comparative analysis has been undertaken between core property units and more generic units offered in a multidisciplinary context from introductory, intermediate and advanced years within the property program. This analysis was based on data collected from course performance surveys, student performance results, a student focus group and was informed by a reflective process from the student perspective and lecturer/ tutor feedback. The study showed that there are many benefits associated with multidisciplinary unit offerings across the QUT Urban Development program particularly in the more generic units. However, these units require a greater degree of management. It is more difficult to organise, teach and coordinate multidisciplinary student cohorts due to a difference in prior knowledge and experience between each of the discipline groups. In addition, the interaction between lecturers/ tutors and the students frequently becomes more limited. A perception exists within the student body that this more limited face to face contact with academic staff is not valuable which may be exacerbated by the quality of complimentary online teaching materials. For many academics, non-attendance at lectures was coupled with an increase in email communication. From the limited data collected during the study there appears to be no clear correlation between large multidisciplinary student classes and student academic performance or satisfaction.
Resumo:
The ICU is an integral part of any hospital and is under great load from patient arrivals as well as resource limitations. Scheduling of patients in the ICU is complicated by the two general types; elective surgery and emergency arrivals. This complicated situation is handled by creating a tentative initial schedule and then reacting to uncertain arrivals as they occur. For most hospitals there is little or no flexibility in the number of beds that are available for use now or in the future. We propose an integer programming model to handle a parallel machine reacting system for scheduled and unscheduled arrivals.