949 resultados para project portfolio selection


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Assessment plays an integral role in teaching and learning in Higher Education and teachers have a strong interest in debates and commentaries on assessment as and for learning. In a one-year graduate entry teacher preparation program, the temptation is to emphasize assessment in an attempt to ensure students “cover” everything as part of a robust preparation for the profession. The risk is that, for students, assessment drives curriculum, and time spent in the completion of assignments is no guarantee of either effective learning or authentic preparation for teaching. Interviews as assessment provide an opportunity for a learning experience as well as an authentic task, since students will shortly be interviewing for employment in a “real world” situation. This paper reports on a project experimenting with interview panels as authentic assessment with pre-service early childhood teachers. At the end of their first semester of study, students enrolled in the Graduate Diploma of Education program at the Queensland University of Technology in Australia were required to participate in a panel interview where they were graded by a panel made up of three faculty staff and one undergraduate student enrolled in the four-year Bachelor of Education program. Students and panel members completed a questionnaire on their experience after the interview. Results indicated that both students and staff valued the experience and felt it was authentic. Results are discussed in terms of how the assessment interview and portfolio presentation supports graduating students in their preparation for employment interviews, and how this authentic assessment task has benefits for both students and teaching staff.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The impact of government policy can become a strong enabler for the use of e-portfolios to support learning and employability. E-portfolio policy and practice seeks to draw together the different elements of integrated education and learning, graduate attributes, employability skills, professional competencies and lifelong learning, ultimately to support an engaged and productive workforce. Drawing on and updating the research findings from a nationwide research study conducted as part of the Australian ePortfolio Project, the present chapter discusses two important areas of the e-portfolio environment, government policy and academic policy. The focus is on those jurisdictions where government and academic policy issues have had a significant impact on e-portfolio practice, such as the European Union, the Netherlands, Scandinavian countries and the United Kingdom, as well as in Australia and New Zealand. These jurisdictions are of interest as government policy discussions are currently focusing on the need for closer integration between the different education and employment sectors. Finally, issues to be considered as well as strategies for driving policy decision making are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The emergence of ePortfolios is relatively recent in the university sector as a way to engage students in their learning and assessment, and to produce records of their accomplishments. An ePortfolio is an online tool that students can utilise to record, catalogue, retrieve and present reflections and artefacts that support and demonstrate the development of graduate students’ capabilities and professional standards across university courses. The ePortfolio is therefore considered as both process and product. Although ePortfolios show promise as a useful tool and their uptake has grown, they are not yet a mainstream higher education technology. To date, the emphasis has been on investigating their potential to support the multiple purposes of learning, assessment and employability, but less is known about whether and how students engage with ePortfolios in the university setting. This thesis investigates student engagement with an ePortfolio in one university. As the educational designer for the ePortfolio project at the University, I was uniquely positioned as a researching professional to undertake an inquiry into whether students were engaging with the ePortfolio. The participants in this study were a cohort (defined by enrolment in a unit of study) of second and third year education students (n=105) enrolled in a four year Bachelor of Education degree. The students were introduced to the ePortfolio in an introductory lecture and a hands-on workshop in a computer laboratory. They were subsequently required to complete a compulsory assessment task – a critical reflection - using the ePortfolio. Following that, engagement with the ePortfolio was voluntary. A single case study approach arising from an interpretivist paradigm directed the methodological approach and research design for this study. The study investigated the participants’ own accounts of their experiences with the ePortfolio, including how and when they engaged with the ePortfolio and the factors that impacted on their engagement. Data collection methods consisted of an attitude survey, student interviews, document collection, a researcher reflective journal and researcher observations. The findings of the study show that, while the students were encouraged to use the ePortfolio as a learning and employability tool, most students ultimately chose to disengage after completing the assessment task. Only six of the forty-five students (13%) who completed the research survey had used the ePortfolio in a sustained manner. The data obtained from the students during this research has provided insight into reasons why they disengaged from the ePortfolio. The findings add to the understandings and descriptions of student engagement with technology, and more broadly, advance the understanding of ePortfolios. These findings also contribute to the interdisciplinary field of technology implementation. There are three key outcomes from this study, a model of student engagement with technology, a set of criteria for the design of an ePortfolio, and a set of recommendations for effective practice for those implementing ePortfolios. The first, the Model of Student Engagement with Technology (MSET) (Version 2) explored student engagement with technology by highlighting key engagement decision points for students The model was initially conceptualised by building on work of previous research (Version 1), however, following data analysis a new model emerged, MSET (Version 2). The engagement decision points were identified as: • Prior Knowledge and Experience, leading to imagined usefulness and imagined ease of use; • Initial Supported Engagement, leading to supported experience of usefulness and supported ease of use; • Initial Independent Engagement, leading to actual experience of independent usefulness and actual ease of use; and • Ongoing Independent Engagement, leading to ongoing experience of usefulness and ongoing ease of use. The Model of Student Engagement with Technology (MSET) goes beyond numerical figures of usage to demonstrate student engagement with an ePortfolio. The explanatory power of the model is based on the identification of the types of decisions that students make and when they make them during the engagement process. This model presents a greater depth of understanding student engagement than was previously available and has implications for the direction and timing of future implementation, and academic and student development activities. The second key outcome from this study is a set of criteria for the re-conceptualisation of the University ePortfolio. The knowledge gained from this research has resulted in a new set of design criteria that focus on the student actions of writing reflections and adding artefacts. The process of using the ePortfolio is reconceptualised in terms of privileging student learning over administrative compliance. The focus of the ePortfolio is that the writing of critical reflections is the key function, not the selection of capabilities. The third key outcome from this research consists of five recommendations for university practice that have arisen from this study. They are that, sustainable implementation is more often achieved through small steps building on one another; that a clear definition of the purpose of an ePortfolio is crucial for students and staff; that ePortfolio pedagogy should be the driving force not the technology; that the merit of the ePortfolio is fostered in students and staff; and finally, that supporting delayed task performance is crucial. Students do not adopt an ePortfolio just because it is provided. While students must accept responsibility for their own engagement with the ePortfolio, the institution has to accept responsibility for providing the environment, and technical and pedagogical support to foster engagement. Ultimately, an ePortfolio should be considered as a joint venture between student and institution where strong returns on investment can be realised by both. It is acknowledged that the current implementation strategies for the ePortfolio are just the beginning of a much longer process. The real rewards for students, academics and the university lie in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Significant differences between project partnering and project alliancing occur in the selection process, management structure of the organisations undertaking the project and nature of risk and reward incentives. This paper helps clarify the nature of project alliancing and how alliance member organisations were selected for this case study. A core issue that differentiates between the two approaches is that in partnering, partners may reap rewards at the expense of other partners. In alliancing each alliance member places their profit margin and reward structure ÁÁat riskÂÂ. Thus in alliancing, the entire alliance entity either benefits together or not all. This fundamentally changes the motivation and dynamics of the relationship between alliance members.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fourteen sase studies extracted from the final project report - December 2009 Australian Flexible Learning Framework: E-portfolios Community of Practice (Aus) Personal learning plans and ePortfolio (Aus) RMIT University: Introducing ePortfolios (Aus) ePortfolio Practice: ALTC Exchange (Aus) Australian PebblePad User Group (APpUG) (Aus) ePortfolios in the library and information services sector (Aus) PDP and ePortfolios UK (UK) SURF NL Portfolio (Netherlands) University of Canterbury ePortfolio (NZ) AAEEBL: Association for Authentic, Experiential and Evidence-Based Learning (USA) Midlands Eportfolio Group, West Midlands(UK) EPAC: Electronic Portfolio Action and Communication (USA) Scottish Higher Education PDP Forum (UK) Centre for Recording Achievement (CRA)(UK)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose While a number of universities in Australia have embraced concepts such as project/problem‐based learning and design of innovative learning environments for engineering education, there has been a lack of national guidance on including sustainability as a “critical literacy” into all engineering streams. This paper was presented at the 2004 International Conference on Engineering Education in Sustainable Development (EESD) in Barcelona, Spain, outlining a current initiative that is seeking to address the “critical literacy” dilemma. Design/methodology/approach The paper presents the positive steps taken by Australia's peak engineering body, the Institution of Engineers Australia (EA), in considering accreditation requirements for university engineering courses and its responsibility to ensure the inclusion of sustainability education material. It then describes a current initiative called the “Engineering Sustainable Solutions Program – Critical Literacies for Engineers Portfolio” (ESSP‐CL), which is being developed by The Natural Edge Project (TNEP) in partnership with EA and Unesco. Findings Content for the module was gathered from around the world, drawing on research from the publication The Natural Advantage of Nations: Business Opportunities, Innovation, and Governance in the Twenty‐first Century. Parts of the first draft of the ESSP‐CL have been trialled at Griffith University, Queensland, Australia with first year environmental engineering students, in May 2004. Further trials are now proceeding with a number of other universities and organisations nationally and internationally. Practical implications It is intended that ESSP‐CL will be a valuable resource to universities, professional development activities or other education facilities nationally and internationally. Originality/value This paper fulfils an identified information/resources need.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The widespread development of Decision Support System (DSS) in construction indicate that the evaluation of software become more important than before. However, it is identified that most research in construction discipline did not attempt to assess its usability. Therefore, little is known about the approach on how to properly evaluate a DSS for specific problem. In this paper, we present a practical framework that can be guidance for DSS evaluation. It focuses on how to evaluate software that is dedicatedly designed for consultant selection problem. The framework features two main components i.e. Sub-system Validation and Face Validation. Two case studies of consultant selection at Malaysian Department of Irrigation and Drainage were integrated in this framework. Some inter-disciplinary area such as Software Engineering, Human Computer Interaction (HCI) and Construction Project Management underpinned the discussion of the paper. It is anticipated that this work can foster better DSS development and quality decision making that accurately meet the client’s expectation and needs

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a strategy for delayed research method selection in a qualitative interpretivist research. An exemplary case details how explorative interviews were designed and conducted in accordance with a paradigm prior to deciding whether to adopt grounded theory or phenomenology for data analysis. The focus here is to determine the most appropriate research strategy in this case the methodological framing to conduct research and represent findings, both of which are detailed. Research addressing current management issues requires both a flexible framework and the capability to consider the research problem from various angles, to derive tangible results for academia with immediate application to business demands. Researchers, and in particular novices, often struggle to decide on an appropriate research method suitable to address their research problem. This often applies to interpretative qualitative research where it is not always immediately clear which is the most appropriate method to use, as the research objectives shift and crystallize over time. This paper uses an exemplary case to reveal how the strategy for delayed research method selection contributes to deciding whether to adopt grounded theory or phenomenology in the initial phase of a PhD research project. In this case, semi-structured interviews were used for data generation framed in an interpretivist approach, situated in a business context. Research questions for this study were thoroughly defined and carefully framed in accordance with the research paradigm‟s principles, while at the same time ensuring that the requirements of both potential research methods were met. The grounded theory and phenomenology methods were compared and contrasted to determine their suitability and whether they meet the research objectives based on a pilot study. The strategy proposed in this paper is an alternative to the more „traditional‟ approach, which initially selects the methodological formulation, followed by data generation. In conclusion, the suggested strategy for delayed research method selection intends to help researchers identify and apply the most appropriate method to their research. This strategy is based on explorations of data generation and analysis in order to derive faithful results from the data generated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client’s requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determining the appropriateness of each operational variation. To obtain such criteria, a three-round Delphi survey has been conducted with 20 construction experts in the People’s Republic of China (PRC). Seven top selection criteria were identified. These are: (1) availability of competent design-builders; (2) client’s capabilities; (3) project complexity; (4) client’s control of project; (5) early commencement & short duration; (6) reduced responsibility or involvement; and (7) clearly defined end user’s requirements. These selection criteria were found to have a statistically significant agreement. These findings may furnish various stakeholders, DB clients in particular, with better insight to understand and compare the different operational variations of the DB system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent years have seen a rapid increase in SMEs working collaboratively in inter-organizational projects. But what drives the emergence of such projects, and what types of industries breed them the most? To address these questions, this paper extends the long running literature on the firm and industry antecedents of new venturing and alliance formation to the domain of project-based organization by SMEs. Based on survey data collected among 1,725 small and medium sized organizations and longitudinal industry data, we find an overall pattern that indicates that IOPV participation is primarily determined by a focal SME’s scope of innovative activities, and the munificence, dynamism and complexity of its environment. Unexpectedly, these variables have different effects on whether SMEs are likely to engage in IOPVs, compared to with how many there are in their portfolio at a time. Implications for theory development are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.