877 resultados para process and actions


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

From the example of the process of general induction into the organization and using certain sociological resources, shows paradox are specialists in human management: is to carefor the motivation and the welfare of workers to achieve its high performance, their fidelity and his tenure at the company; However, current mutations of the social architecture in general and of work in particular –as structure of organized action– force thinking that organizational loyalty tends to be increasingly unlikely and that, conversely, the current personnel administration processes appear made inappropriate notions and appear to contribute directly to the adversities of human beings in organizational settings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper studies the success of mainstreaming disabled students and specifically hearing-impaired students and the transitional procedures used by local St. Louis schools for the hearing impaired.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

From a construction perspective, Public-Private Partnership projects (PPPs) are often credited as providing real incentives for the actors involved as well as a business environment that is conducive to innovation and improved practices. The validity of four common rhetorical arguments used to promote the PPP procurement route is explored: collaborative working, design freedom, long-term commitment and risk transfer. Particular interest is given to the extent to which espoused intentions correlate with experienced realities in allowing actors involved in the design and construction phases to be presented with, and able to exploit, opportunities for technological innovation. It is argued that there is reason to be cautious in fully accepting the purported benefits of the PPP framework and that the arguments often presented need to be revised. Alternative interpretations are provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The relationships between wheat protein quality and baking properties of 20 flour samples were studied for two breadmaking processes; a hearth bread test and the Chorleywood Bread Process (CBP). The strain hardening index obtained from dough inflation measurements, the proportion of unextractable polymeric protein, and mixing properties were among the variables found to be good indicators of protein quality and suitable for predicting potential baking quality of wheat flours. By partial least squares regression, flour and dough test variables were able to account for 71-93% of the variation in crumb texture, form ratio and volume of hearth loaves made using optimal mixing and fixed proving times. These protein quality variables were, however, not related to the volume of loaves produced by the CBP using mixing to constant work input and proving to constant height. On the other hand, variation in crumb texture of CBP loaves (54-55%) could be explained by protein quality. The results underline that the choice of baking procedure and loaf characteristics is vital in assessing the protein quality of flours. (C) 2003 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

100.00% 100.00%

Publicador: