878 resultados para electricity prices
Resumo:
The economiser is a critical component for efficient operation of coal-fired power stations. It consists of a large system of water-filled tubes which extract heat from the exhaust gases. When it fails, usually due to erosion causing a leak, the entire power station must be shut down to effect repairs. Not only are such repairs highly expensive, but the overall repair costs are significantly affected by fluctuations in electricity market prices, due to revenue lost during the outage. As a result, decisions about when to repair an economiser can alter the repair costs by millions of dollars. Therefore, economiser repair decisions are critical and must be optimised. However, making optimal repair decisions is difficult because economiser leaks are a type of interactive failure. If left unfixed, a leak in a tube can cause additional leaks in adjacent tubes which will need more time to repair. In addition, when choosing repair times, one also needs to consider a number of other uncertain inputs such as future electricity market prices and demands. Although many different decision models and methodologies have been developed, an effective decision-making method specifically for economiser repairs has yet to be defined. In this paper, we describe a Decision Tree based method to meet this need. An industrial case study is presented to demonstrate the application of our method.
Resumo:
Australia’s efforts to transition to a low-emissions economy have stagnated following the successive defeats of the Carbon Pollution Reduction Scheme. This failure should not, however, be regarded as the end of Australia’s efforts to make this transition. In fact, the opportunity now exists for Australia to refine its existing arrangements to enable this transition to occur more effectively. The starting point for this analysis is the legal arrangements applying to the electricity generation sector, which is the largest sectoral emitter of anthropogenic greenhouse gas emissions in Australia. Without an effective strategy to mitigate this sector’s contribution to anthropogenic climate change, it is unlikely that Australia will be able to transition towards a low-emissions economy. It is on this basis that this article assesses the dominant national legal arrangement – the Renewable Energy Target – underpinning the electricity generation sector's efforts to become a low-emissions sector.
Resumo:
Smart metering presents opportunities for business model creation. However the viability of many potential business models in a smart metering scenario may be dictated by privacy regulation and data sharing arrangements. An understanding by businesses of customers’ preferences for the visualisation of their electricity consumption and the degree to which they are willing to share it, is valuable. We present results from two interviews exploring data visualisation and willingness to share personal electricity consumption information. Participants displayed a high willingness to share and a preference for access to additional information when visualising their electricity consumption.
Resumo:
Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.
Electricity market equilibrium of thermal and wind generating plants in emission trading environment
Resumo:
Advanced substation applications, such as synchrophasors and IEC 61850-9-2 sampled value process buses, depend upon highly accurate synchronizing signals for correct operation. The IEEE 1588 Precision Timing Protocol (PTP) is the recommended means of providing precise timing for future substations. This paper presents a quantitative assessment of PTP reliability using Fault Tree Analysis. Two network topologies are proposed that use grandmaster clocks with dual network connections and take advantage of the Best Master Clock Algorithm (BMCA) from IEEE 1588. The cross-connected grandmaster topology doubles reliability, and the addition of a shared third grandmaster gives a nine-fold improvement over duplicated grandmasters. The performance of BMCA mediated handover of the grandmaster role during contingencies in the timing system was evaluated experimentally. The 1 µs performance requirement of sampled values and synchrophasors are met, even during network or GPS antenna outages. Slave clocks are shown to synchronize to the backup grandmaster in response to degraded performance or loss of the main grandmaster. Slave disturbances are less than 350 ns provided the grandmaster reference clocks are not offset from one another. A clear understanding of PTP reliability and the factors that affect availability will encourage the adoption of PTP for substation time synchronization.
Resumo:
On 1 July 2012, the carbon pricing mechanism commenced in Australia with the aim of reducing emissions and encouraging investment in clean energy. A substantial proportion of Australia’s emissions are attributable to the coal-fired electricity generation sector. This article examines whether the carbon pricing mechanism will effectively facilitate emissions reduction from the coal-fired electricity sector. Aspects analysed include the legislative constraints placed on the carbon price, the carbon pollution cap and provisions specific to the coal-fired electricity sector, such as transitional assistance. It is concluded that, in practice, the carbon pricing mechanism may not be sufficient in itself to achieve significant reduction in emissions from coal-fired electricity generation or significant investment in clean energy, and that a suite of additional regulatory measures, such as the federal Renewable Energy Target, should operate in conjunction with the mechanism.
Resumo:
Teachers of construction economics and estimating have for a long time recognised that there is more to construction pricing than detailed calculation of costs (to the contractor). We always get to the point where we have to say "of course, experience or familiarity of the market is very important and this needs judgement, intuition, etc". Quite how important is the matter in construction pricing is not known and we tend to trivialise its effect. If judgement of the market has a minimal effect, little harm would be done, but if it is really important then some quite serious consequences arise which go well beyond the teaching environment. Major areas of concern for the quantity surveyor are in cost modelling and cost planning - neither of which pay any significant attention to the market effect. There are currently two schools of thought about the market effect issue. The first school is prepared to ignore possible effects until more is known. This may be called the pragmatic school. The second school exists solely to criticise the first school. We will call this the antagonistic school. Neither the pragmatic nor the antagonistic schools seem to be particularly keen to resolve the issue one way or the other. The founder and leader of the antagonistic school is Brian Fine whose paper in 1974 is still the basic text on the subject, and in which he coined the term 'socially acceptable' price to describe what we now recognise as the market effect. Mr Fine's argument was then, and is since, that the uncertainty surrounding the contractors' costing and cost estimating process is such that the uncertainty surrounding the contractors' cost that it logically leads to a market-orientated pricing approach. Very little factual evidence, however, seems to be available to support these arguments in any conclusive manner. A further, and more important point for the pragmatic school, is that, even if the market effect is as important as Mr Fine believes, there are no indications of how it can be measured, evaluated or predicted. Since 1974 evidence has been accumulating which tends to reinforce the antagonists' view. A review of the literature covering both contractors' and designers' estimates found many references to the use of value judgements in construction pricing (Ashworth & Skitmore, 1985), which supports the antagonistic view in implying the existence of uncertainty overload. The most convincing evidence emerged quite by accident in some research we recently completed with practicing quantity surveyors in estimating accuracy (Skitmore, 1985). In addition to demonstrating that individual quantity surveyors and certain types of buildings had significant effect on estimating accuracy, one surprise result was that only a very small amount of information was used by the most expert surveyors for relatively very accurate estimates. Only the type and size of building, it seemed, was really relevant in determining accuracy. More detailed information about the buildings' specification, and even a sight to the drawings, did not significantly improve their accuracy level. This seemed to offer clear evidence that the constructional aspects of the project were largely irrelevant and that the expert surveyors were somehow tuning in to the market price of the building. The obvious next step is to feed our expert surveyors with more relevant 'market' information in order to assess its effect. The problem with this is that our experts do not seem able to verbalise their requirements in this respect - a common occurrence in research of this nature. The lack of research into the nature of market effects on prices also means the literature provides little of benefit. Hence the need for this study. It was felt that a clearer picture of the nature of construction markets would be obtained in an environment where free enterprise was a truly ideological force. For this reason, the United States of America was chosen for the next stage of our investigations. Several people were interviewed in an informal and unstructured manner to elicit their views on the action of market forces on construction prices. Although a small number of people were involved, they were thought to be reasonably representative of knowledge in construction pricing. They were also very well able to articulate their views. Our initial reaction to the interviews was that our USA subjects held very close views to those held in the UK. However, detailed analysis revealed the existence of remarkably clear and consistent insights that would not have been obtained in the UK. Further evidence was also obtained from literature relating to the subject and some of the interviewees very kindly expanded on their views in later postal correspondence. We have now analysed all the evidence received and, although a great deal is of an anecdotal nature, we feel that our findings enable at least the basic nature of the subject to be understood and that the factors and their interrelationships can now be examined more formally in relation to construction price levels. I must express my gratitude to the Royal Institution of Chartered Surveyors' Educational Trust and the University of Salford's Department of Civil Engineering for collectively funding this study. My sincere thanks also go to our American participants who freely gave their time and valuable knowledge to us in our enquiries. Finally, I must record my thanks to Tim and Anne for their remarkable ability to produce an intelligible typescript from my unintelligible writing.
Resumo:
Sweden’s protest against the Vietnam War was given tangible form in 1969 through the decision to give economic aid to the Government of North Vietnam. The main outcome was an integrated pulp and paper mill in the Vinh Phu Province north-west of Hanoi. Known as Bai Bang after its location, the mill became the most costly, one of the longest lasting and the most controversial project in the history of Swedish development cooperation. In 1996 Bai Bang produced at its full capacity. Today the mill is exclusively managed and staffed by the Vietnamese and there are plans for future expansion. At the same time a substantial amount of money has been spent to reach these achievements. Looking back at the cumbersome history of the project the results are against many’s expectations. To learn more about the conditions for sustainable development Sida commissioned two studies of the Bai Bang project. Together they touch upon several important issues in development cooperation over a period of almost 30 years: the change of aid paradigms over time, the role of foreign policy in development cooperation, cultural obstacles, recipient responsibility versus donor led development etc. The two studies were commissioned by Sida’s Department for Evaluation and Internal Audit which is an independent department reporting directly to Sida’s Board of Directors. One study assesses the financial and economic viability of the pulp and paper mill and the broader development impact of the project in Vietnam. It has been carried out by the Centre for International Economics, an Australian private economic research agency. The other study analyses the decision-making processes that created and shaped the project over a period of two decades, and reflects on lessons from the project for development cooperation in general. This study has been carried out by the Chr. Michelsen Institute, a Norweigan independent research institution.
Resumo:
This paper introduces a parallel implementation of an agent-based model applied to electricity distribution grids. A fine-grained shared memory parallel implementation is presented, detailing the way the agents are grouped and executed on a multi-threaded machine, as well as the way the model is built (in a composable manner) which is an aid to the parallelisation. Current results show a medium level speedup of 2.6, but improvements are expected by incor-porating newer distributed or parallel ABM schedulers into this implementa-tion. While domain-specific, this parallel algorithm can be applied to similarly structured ABMs (directed acyclic graphs).
Resumo:
The Vehicle-to-Grid (V2G) concept is based on the newly developed and marketed technologies of hybrid petrol-electric vehicles, most notably represented by the Toyota Prius, in combination with significant structural changes to the world's energy economy, and the growing strain on electricity networks. The work described in this presentation focuses on the market and economic impacts of grid connected vehicles. We investigate price reduction effects and transmission system expansion cost reduction. We modelled a large numbers of plug-in-hybrid vehicle batteries by aggregating them into a virtual pumped-storage power station at the Australian national electricity market's (NEM) region level. The virtual power station concept models a centralised control for dispatching (operating) the aggregated electricity supply/demand capabilities of a large number of vehicles and their batteries. The actual level of output could be controlled by human or automated agents to either charge or discharge from/into the power grid. As previously mentioned the impacts of widespread deployments of this technology are likely to be economic, environmental and physical.
Resumo:
Electricity is the cornerstone of modern life. It is essential to economic stability and growth, jobs and improved living standards. Electricity is also the fundamental ingredient for a dignified life; it is the source of such basic human requirements as cooked food, a comfortable living temperature and essential health care. For these reasons, it is unimaginable that today's economies could function without electricity and the modern energy services that it delivers. Somewhat ironically, however, the current approach to electricity generation also contributes to two of the gravest and most persistent problems threatening the livelihood of humans. These problems are anthropogenic climate change and sustained human poverty. To address these challenges, the global electricity sector must reduce its reliance on fossil fuel sources. In this context, the object of this research is twofold. Initially it is to consider the design of the Renewable Energy (Electricity) Act 2000 (Cth) (Renewable Electricity Act), which represents Australia's primary regulatory approach to increase the production of renewable sourced electricity. This analysis is conducted by reference to the regulatory models that exist in Germany and Great Britain. Within this context, this thesis then evaluates whether the Renewable Electricity Act is designed effectively to contribute to a more sustainable and dignified electricity generation sector in Australia. On the basis of the appraisal of the Renewable Electricity Act, this thesis contends that while certain aspects of the regulatory regime have merit, ultimately its design does not represent an effective and coherent regulatory approach to increase the production of renewable sourced electricity. In this regard, this thesis proposes a number of recommendations to reform the existing regime. These recommendations are not intended to provide instantaneous or simple solutions to the current regulatory regime. Instead, the purpose of these recommendations is to establish the legal foundations for an effective regulatory regime that is designed to increase the production of renewable sourced electricity in Australia in order to contribute to a more sustainable and dignified approach to electricity production.
Resumo:
As a renewable energy source, wind power is playing an increasingly important role in China’s electricity supply. Meanwhile, China is also the world’s largest market for Clean Development Mechanism (CDM) wind power projects. Based on the data of 27 wind power projects of Inner Mongolia registered with the Executive Board of the United Nations (EB) in 2010, this paper constructs a financial model of Net Present Value (NPV) to analyze the cost of wind power electricity. A sensitivity analysis is then conducted to examine the impact of different variables with and without Certified Emission Reduction (CER) income brought about by the CDM. It is concluded that the CDM, along with static investment and annual wind electricity production, is one of the most significant factors in promoting the development of wind power in China. Additionally, wind power is envisaged as a practical proposition for competing with thermal power if the appropriate actions identified in the paper are made.