1000 resultados para construction timeline
Resumo:
Worldwide, education systems have undergone unprecedented change due to a variety of economic, social, and political forces (Limerick, Cunnington & Crowther, 2002). The People’s Republic of China (PRC) is no exception. Continuous educational reform at primary and secondary levels in Mainland China has created new challenges and accountabilities for school principals. The important role of principals in primary and secondary schools has been acknowledged in both policy documents and the broader literature (Central Committee of the Chinese Communist Party, 1985; F. Chen, 2005; Chu, 2003; W. Huang, 2005; T. Wang, 2003). Yet, most of the literature on primary and secondary school principals in Mainland China is prescriptive in nature, identifying from the perspectives of researchers and academics what principals should do and how they should enact leadership. Lacking in this research is an awareness of the daily practices and lived experiences of principals. Furthermore, within the small body of writing on primary and secondary school principals in Mainland China, gender is seldom given any attention. To date, only a small number of empirical studies have focused on female principals as a specific category of research (Zen, 2004; Zhong, 2004). This study aimed to explore the professional lives of two female exemplary school principals in urban primary schools in Mainland China. A qualitative exploratory case study was used. Semi-structured interviews with each individual female principal, with six teachers in each of the school sites and with the superintendent of each principal were conducted. Field observations and document analysis were also undertaken to obtain multiple insights about their leadership practices. The conceptual framework was based largely on the theory of Gronn (1999) and incorporated five core leadership practices (vision building, ethical considerations, teaching and learning, power utilisation, and dealing with risks and challenges) taken from the wider literature. The key findings of this study were twofold. Firstly, while the five leadership practices were evident in the leadership of the two principals, this study identified some subtle differences in the way they approached each of them. Secondly, contextual factors such as Chinese traditional culture, the contemporary societal context, and the school organisational context, in addition to the biographical experiences of each principal were significant factors in shaping the way in which they exercised their leadership practices in the schools.
Resumo:
The Cooperative Research Centre (CRC) for Construction Innovation is Australia’s national centre for research and innovation focused on the needs of the property, design, construction and facility management sectors. The period covered by this report is from 1 July 2001 to 30 October 2009. The report comprises of two parts. Part A details the future and possible future impact of the CRC including: The Future of the CRC, Research and Commercialisation, Economic Benefit to Australia, Public Good Benefits to Australia. Part B details the achievements during the funding period including: Economic Benefit and Commercialisation, Uptake of Research Results, Impact of Education Programs, CRC Operations.
Resumo:
Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.
Resumo:
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
Resumo:
A strong designated verifier signature scheme makes it possible for a signer to convince a designated verifier that she has signed a message in such a way that the designated verifier cannot transfer the signature to a third party, and no third party can even verify the validity of a designated verifier signature. We show that anyone who intercepts one signature can verify subsequent signatures in Zhang-Mao ID-based designated verifier signature scheme and Lal-Verma ID-based designated verifier proxy signature scheme. We propose a new and efficient ID-based designated verifier signature scheme that is strong and unforgeable. As a direct corollary, we also get a new efficient ID-based designated verifier proxy signature scheme.
Resumo:
To date, most theories of business models have theorized value capture assuming that appropriability regimes were exogenous and that the firm would face a unique, ideal-typical appropriability regime. This has led theory contributions to focus on governance structures to minimize transaction costs, to downplay the interdepencies between value capture and value creation, and to ignore revenue generation strategies. We propose a reconceptualization of business models value capture mechanisms that rely on assumptions of endogeneity and multiplicity of appropriability regimes. This new approach to business model construction highlights the interdependencies and trade-offs between value creation and value capture offered by different types and combinations of appropriability regimes. The theory is illustrated by the analysis of three cases of open source software business models
Resumo:
In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.
Resumo:
Patients with severe back deformities can greatly benefit from customized medical seating. Customized medical seating is made by taking measurements of each individual patient and making the seat as per these measurements. The current measuring systems employed by the industry are limited to use in clinics which are generally located only in major population centres. Patients living in remote areas are severely affected by this as the clinics could be far away and inaccessible for these patients. To provide service of customized medical seating requires a new measurement system which is portable so that the system could be transported to the patients in remote areas. The requirements for a new measurement system are analysed to suite the needs of Equipment Technology Services of the Cerebral Palsy League of Queensland. Design for a new measurement system was conceptualised by reviewing systems and technologies in various scientific disciplines. Design for a new system was finalised by optimizing each individual component. The final approach was validated by measuring difficult models and repeating the process to check for process variances. This system has now been adopted for clinical evaluation by ETS Suggestions have been made for further improvements in this new measurement approach.
Resumo:
In recent years, increasing numbers of Chinese migrants have come to Australia to study or to live. In doing so, they have entered a new cultural space. They are faced with many challenges, not only to do with study experience, workplace experience and life-style practices, but also to do with language, communication, culture and identity. Such new challenges can feel dangerous, unstable and uncomfortable as they require moves out of the safety zone of primary cultural experience. This qualitative research study investigates the perceptions and narratives of three Taiwanese-Australian migrants in terms of their experience of this process of acculturation and social identity construction as migrant tertiary students in the new Australian context and of their subsequent experience professionally. Their accounts of where they see themselves to have 'landed' in terms of their acculturation process and identity construction might provide relevant insights to the experience of hybridity which is intercultural Australia.
Resumo:
This paper reports on an intervention study planned to help Year 6 students construct the multiplicative structure underlying decimal-number numeration. Three types of intervention were designed from a numeration model developed from a large study of 173 Year 6 students’ decimal-number knowledge. The study found that students could acquire multiplicative structure as an abstract schema if instruction took account of prior knowledge as informed by the model.
Resumo:
Since the early 1980s, researchers and practitioners in the organisational and management fields have presumed a link between organisational, or corporate, culture and organisational performance. Whilst many believe this exists, other authors have been critical of the validity of such studies. Part of this doubt stems from a reliance on measures of organisational performance that are based purely on financial measures of business growth. Using the construction industry as the subject of his research, Vaughan Coffey traces the development of the literature on organisational culture and business effectiveness and investigates the culture–performance link using a new and highly objective measure of company performance and an evaluation of organisational culture, which is largely behaviourally-based. Providing a theoretical contribution to the field, this work shows that various cultural traits appear to be closely linked to objectively measured organisational effectiveness. This book will be valuable to professionals and researchers in the fields of management and public policy. It indicates directions for construction companies to develop and change, and in doing so strengthen their chances of remaining strong when opportunities for work might deplete and only the most successful companies will be able to survive.---- Selected Contents: 1. An Introduction to Organizations, Culture, Performance and Construction 2. Organizations, Culture and Climate 3. Organizational Culture Studies 4. Measuring Organizational Performance and Effectiveness 5. Organizational Culture and Effectiveness – The Link Between Them 6. Research on the Relationship between Organizational Culture and Performance in Hong Kong Construction Companies 7. The Hong Kong Experiment – Presentation of Demographic Data, Overall Results and some Descriptive and Qualitative Analysis 8. Detailed Statistical Analysis of the Docs and Pass Data in Relation to the Major Research Questions 9. Four Hong Kong Construction Mini-Case Studies 10. Conclusions and Future Research Directions
Resumo:
This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.