838 resultados para Value System
Resumo:
Transmission smart grids will use a digital platform for the automation of high voltage substations. The IEC 61850 series of standards, released in parts over the last ten years, provide a specification for substation communications networks and systems. These standards, along with IEEE Std 1588-2008 Precision Time Protocol version 2 (PTPv2) for precision timing, are recommended by the both IEC Smart Grid Strategy Group and the NIST Framework and Roadmap for Smart Grid Interoperability Standards for substation automation. IEC 61850, PTPv2 and Ethernet are three complementary protocol families that together define the future of sampled value digital process connections for smart substation automation. A time synchronisation system is required for a sampled value process bus, however the details are not defined in IEC 61850-9-2. PTPv2 provides the greatest accuracy of network based time transfer systems, with timing errors of less than 100 ns achievable. The suitability of PTPv2 to synchronise sampling in a digital process bus is evaluated, with preliminary results indicating that steady state performance of low cost clocks is an acceptable ±300 ns, but that corrections issued by grandmaster clocks can introduce significant transients. Extremely stable grandmaster oscillators are required to ensure any corrections are sufficiently small that time synchronising performance is not degraded.
Resumo:
The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.
Resumo:
A general mistrust within the contactor and subcontractor companies has identified one of the significant barriers to derive benefits from true downstream supply chain integration. Using the general theory of trust in inter-organizational relations and conducting interviews, this research discusses factors that influence development of trust and cooperation in contractor– subcontractor relationships in construction projects. System dynamics is the simulation method is selected in this theory-building effort, based on qualitative data collected from two projects of a construction company in Thailand. Performance, permeability and system based trust are found to make significant contributions toward parties’ trust level. Three strategic policies such as best value contracting, management of subcontractors as internal team and semi project partnering approach are recommended to stimulate the trust factors as well as cooperative long term relationship.
Resumo:
This paper seeks to explore how organisations can effectively use performance management systems (PMS) to monitor collective identities. The monitoring of relationships between identity and an influential PMS—the balanced scorecard (BSC)—are explored. Drawing from identity and management accounting literature, this paper argues that identity products, patternings and processes are commonly positioned, monitored and interpreted through the multiple perspectives and levels of the BSC. Specifically, human, technical and organisational capital under the Learning and Growth perspective of the BSC can incorporate various identity measures that sustain the relative, distinctive and fluid nature of identities. The value of this research is to strengthen the theoretical grounds which position identity as an important dimension of organisational capital in PMS.
Resumo:
Organisations devote substantial resources to acquire information technology (IT), and explaining the important issue of how IT can affect performance has posed a significant challenge to information system (IS) researchers. Owing to the importance of expanding our understanding on how and where IT and IT-related resources impact organisational performance, this study investigates the differential effects of IT resources and IT-related capabilities, in the presence of platform-related complementarities, on business process performance. We test these relationships empirically via a field survey of 216 firms. The findings suggest that IT resources and IT-related capabilities explain variance in performance. Of interest is the finding that IT resources and IT-related capabilities ability to explain variance in business process is further enhanced by the presence of the platform-related complementarities. Our findings are largely consistent with the resource-based and complementarity arguments of sources of IT-related business value.
Resumo:
There is limited understanding about business strategies related to parliamentary government's departments. This study focuses on the strategies of departments of two state governments in Australia. The strategies are derived from department strategic plans available in public domain and collected from respective websites. The results of this research indicate that strategies fall into seven categories: internal, development, political, partnership, environment, reorientation and status quo. The strategies of the departments are mainly internal or development where development strategy is mainly the focus of departments such as transport, and infrastructure. Political strategy is prevalent for departments related to communities, and education and training. Further three layers of strategies are identified as kernel, cluster and individual, which are mapped to the developed taxonomy.
Resumo:
Introduction and objectives Early recognition of deteriorating patients results in better patient outcomes. Modified early warning scores (MEWS) attempt to identify deteriorating patients early so timely interventions can occur thus reducing serious adverse events. We compared frequencies of vital sign recording 24 h post-ICU discharge and 24 h preceding unplanned ICU admission before and after a new observation chart using MEWS and an associated educational programme was implemented into an Australian Tertiary referral hospital in Brisbane. Design Prospective before-and-after intervention study, using a convenience sample of ICU patients who have been discharged to the hospital wards, and in patients with an unplanned ICU admission, during November 2009 (before implementation; n = 69) and February 2010 (after implementation; n = 70). Main outcome measures Any change in a full set or individual vital sign frequency before-and-after the new MEWS observation chart and associated education programme was implemented. A full set of vital signs included Blood pressure (BP), heart rate (HR), temperature (T°), oxygen saturation (SaO2) respiratory rate (RR) and urine output (UO). Results After the MEWS observation chart implementation, we identified a statistically significant increase (210%) in overall frequency of full vital sign set documentation during the first 24 h post-ICU discharge (95% CI 148, 288%, p value <0.001). Frequency of all individual vital sign recordings increased after the MEWS observation chart was implemented. In particular, T° recordings increased by 26% (95% CI 8, 46%, p value = 0.003). An increased frequency of full vital sign set recordings for unplanned ICU admissions were found (44%, 95% CI 2, 102%, p value = 0.035). The only statistically significant improvement in individual vital sign recordings was urine output, demonstrating a 27% increase (95% CI 3, 57%, p value = 0.029). Conclusions The implementation of a new MEWS observation chart plus a supporting educational programme was associated with statistically significant increases in frequency of combined and individual vital sign set recordings during the first 24 h post-ICU discharge. There were no significant changes to frequency of individual vital sign recordings in unplanned admissions to ICU after the MEWS observation chart was implemented, except for urine output. Overall increases in the frequency of full vital sign sets were seen.
Design and construction of fixed bed pyrolysis system and plum seed pyrolysis for bio-oil production
Resumo:
This work investigated the production of bio oil from plum seed (Zyziphus jujuba) by fixed bed pyrolysis technology. A fixed bed pyrolysis system has been designed and fabricated for production of bio oil. The major components of the system are: fixed bed reactor, liquid condenser and liquid collector. Nitrogen gas was used to maintain the inert atmosphere in the reactor where the pyrolysis reaction takes place. The feedstock considered in this study is plum seed as it is available waste material in Bangladesh. The reactor is heated by means of a cylindrical biomass external heater. Rice husk was used as the energy source. The products are oil, char and gas. The parameters varied are reactor bed temperature, running time and feed particle size. The parameters are found to influence the product yields significantly. The maximum liquid yield of 39 wt% at 5200C for a feed particle size of 2.36-4.75 mm and a gas flow rate of 8 liter/min with a running time of 120 minute. The pyrolysis oil obtained at these optimum process conditions are analyzed for some of their properties as an alternative fuel. The density of the liquid was closer with diesel. The viscosity of the plum seed liquid was lower than that of the conventional fuels. The calorific value of the pyrolysis oil is one half of the diesel fuel.
Resumo:
In recent years, ecological thinking has been applied to a range of social, cultural and aesthetic systems, including performing arts as a living system of policy makers, producers, organisations, artists and audiences. Ecological thinking is systems-based thinking which allows us to see the performing arts as a complex and protean ecosystem; to explain how elements in this system act and interact; and to evaluate its effects on Australia’s social fabric over time. According to Gallasch, ecological thinking is “what we desperately need for the arts.” It enables us to “defeat the fragmentary and utilitarian view of the arts that dominates, to make connections, to establish overviews of the arts that can be shared and debated” (Gallasch NP). John Baylis took up these issues in "Mapping Queensland Theatre" (2009), an Arts Queensland-funded survey designed to map practices in Brisbane and in Queensland more broadly, and to provide a platform to support future policy-making. In this paper, we propose a new approach to mapping Brisbane’s and Queensland’s theatre that extends Baylis’ ‘value chain’ into a ‘value ecology’ that provides a more textured picture of players, patterns, relationships and activity levels in local performing arts.
Resumo:
Waste is intrinsic to the fashion system. Fashion is predicated on built-in obsolescence, and as such outmoded garments are rapidly discarded to charity shops or landfill. However, the story of fashion is also one of abundance and extravagance in design ideas. Every season there are new design details – prints, embroidery, embellishments, shapes and textures. This excess of ideas is in itself another form of waste, albeit one that is culturally nourishing. The grave of a fashion garment may also be the grave of a season’s research and creativity. This paper compares the tangible waste of the industry with its intangible waste, namely fashion’s creativity and cultural excess. Fashion’s excess and abundance of trends and ideas makes any move to curb the environmental impact difficult. For all practitioners of fashion – whether designers or consumers – the waste and excess inherent in the fashion system is a difficult ethical terrain to negotiate. However, inverting the wasteful phases of the production cycle can help reframe waste from pollution to a source of nourishment for future practice. While creative excesses of designers may be ‘wasted’ after a season, fashion styles and tropes are recycled and reinvented, with the once passé styles and design ideas from previous years revalorized and returned into the fashion system. Similarly, material garments acquire new value through entering or re-entering the second hand or vintage markets. Design processes can utilise pre or post-consumer textile waste, or eliminate waste through design. In these processes, waste becomes the primary source of nourishment for future fashion cycles.
Resumo:
Process bus networks are the next stage in the evolution of substation design, bringing digital technology to the high voltage switchyard. Benefits of process buses include facilitating the use of Non-Conventional Instrument Transformers, improved disturbance recording and phasor measurement and the removal of costly, and potentially hazardous, copper cabling from substation switchyards and control rooms. This paper examines the role a process bus plays in an IEC 61850 based Substation Automation System. Measurements taken from a process bus substation are used to develop an understanding of the network characteristics of "whole of substation" process buses. The concept of "coherent transmission" is presented and the impact of this on Ethernet switches is examined. Experiments based on substation observations are used to investigate in detail the behavior of Ethernet switches with sampled value traffic. Test methods that can be used to assess the adequacy of a network are proposed, and examples of the application and interpretation of these tests are provided. Once sampled value frames are queued by an Ethernet switch the additional delay incurred by subsequent switches is minimal, and this allows their use in switchyards to further reduce communications cabling, without significantly impacting operation. The performance and reliability of a process bus network operating with close to the theoretical maximum number of digital sampling units (merging units or electronic instrument transformers) was investigated with networking equipment from several vendors, and has been demonstrated to be acceptable.
Resumo:
There is a growing interest in the use of megavoltage cone-beam computed tomography (MV CBCT) data for radiotherapy treatment planning. To calculate accurate dose distributions, knowledge of the electron density (ED) of the tissues being irradiated is required. In the case of MV CBCT, it is necessary to determine a calibration-relating CT number to ED, utilizing the photon beam produced for MV CBCT. A number of different parameters can affect this calibration. This study was undertaken on the Siemens MV CBCT system, MVision, to evaluate the effect of the following parameters on the reconstructed CT pixel value to ED calibration: the number of monitor units (MUs) used (5, 8, 15 and 60 MUs), the image reconstruction filter (head and neck, and pelvis), reconstruction matrix size (256 by 256 and 512 by 512), and the addition of extra solid water surrounding the ED phantom. A Gammex electron density CT phantom containing EDs from 0.292 to 1.707 was imaged under each of these conditions. The linear relationship between MV CBCT pixel value and ED was demonstrated for all MU settings and over the range of EDs. Changes in MU number did not dramatically alter the MV CBCT ED calibration. The use of different reconstruction filters was found to affect the MV CBCT ED calibration, as was the addition of solid water surrounding the phantom. Dose distributions from treatment plans calculated with simulated image data from a 15 MU head and neck reconstruction filter MV CBCT image and a MV CBCT ED calibration curve from the image data parameters and a 15 MU pelvis reconstruction filter showed small and clinically insignificant differences. Thus, the use of a single MV CBCT ED calibration curve is unlikely to result in any clinical differences. However, to ensure minimal uncertainties in dose reporting, MV CBCT ED calibration measurements could be carried out using parameter-specific calibration measurements.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
In deregulated versions of free-market electricity, producers will be free to send power along other utilities. The price of power strongly depends and fluctuates according to mutual benefit index of both supplier and consumer. In such a situation, strong interaction among utilities may cause instabilities in the system. As the frequency of market-based dispatch increases market forces tend to destabilize the stable system dynamics depending on the value of Ks/τλ(market dependent parameter) ratio. This tends to destabilize the coupled dynamics. The implementation of TCSC can effectively damp the inter area modes of oscillations of the coupled market system.