888 resultados para Transport Construction Project


Relevância:

80.00% 80.00%

Publicador:

Resumo:

World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

International Conference: A Child's World - Next Steps, 25 June 2012 - 27th June 2014.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Transportation geotechnics associated with constructing and maintaining properly functioning transportation infrastructure is a very resource intensive activity. Large amounts of materials and natural resources are required, consuming proportionately large amounts of energy and fuel. Thus, the implementation of the principles of sustainability is important to reduce energy consumption, carbon footprint, greenhouse gas emissions, and to increase material reuse/recycling, for example. This paper focusses on some issues and activities relevant to sustainable earthwork construction aimed at minimising the use of energy and the production of CO2 while improving the in-situ ground to enable its use as a foundation without the consumption of large amounts of primary aggregate as additional foundation layers. The use of recycled materials is discussed, including steel slag and tyre bales, alongside a conceptual framework for evaluating the utility of applications for recycled materials in transportation infrastructure.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Final report of the eKnowledge's project, an online forum tool that offers consultants and students the chance to create spaces for asynchronous communication and collaboration.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis was carried out as a case study of a company YIT in order to clarify the sev-erest risks for the company and to build a method for project portfolio evaluation. The target organization creates new living environment by constructing residential buildings, business premises, infrastructure and entire areas worth for EUR 1.9 billion in the year 2013. Company has noted project portfolio management needs more information about the structure of project portfolio and possible influences of market shock situation. With interviews have been evaluated risks with biggest influence and most appropriate metrics to examine. The major risks for the company were evaluated by interviewing the executive staff. At the same time, the most appropriate risk metrics were considered. At the moment sales risk was estimated to have biggest impact on company‟s business. Therefore project port-folio evaluation model was created and three different scenarios for company‟s future were created in order to identify the scale of possible market shock situation. The created model is tested with public and descriptive figures of YIT in a one-year-long market shock and the impact on different metrics was evaluated. Study was conducted using con-structive research methodology. Results indicate that company has notable sales risk in certain sections of business portfolio.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this Master’s Thesis is to develop project logistics functions in large scale en-gineering, procurement and construction projects. The background of the research topic is compounded from two separate subjects; OPAL Program and case study of an actual EPC project. The purpose is to examine Project Logistics process in accordance with OPAL Program as well as logistics process in focus EPC project. Both entities are researched by using the case study research methodology. Logistics process of the focus EPC project is described as well as presented and in addi-tion, logistics related findings and observations are introduced. Significant findings and observations are found from logistics costs as well as shipment volume estimations in the early phase of the focus ECP project. A notable finding is also that because goods were transported as readily assembled as possible it caused expensive oversized cargo deliveries. From findings and observation of the focus EPC project it can be derived that logistics has to be involved in the early sales phase in order to receive more accurate logistics cost esti-mations for project deliveries. It is also noticed that in order to obtain savings in logistics costs, oversized deliveries must be avoided.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La version intégrale de ce mémoire est disponible uniquement pour consultation individuelle à la Bibliothèque de musique de l’Université de Montréal (www.bib.umontreal.ca/MU).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.