998 resultados para Sugar Creek Watershed (Crawford County, Ill.)
Resumo:
Growing Green Communities is strongly committed to improving the quality of Camp Creek and its watershed by reducing soil loss, which will benefit landowners by preserving their topsoil and improve the water quality of Camp Creek by reducing sediment loading of the creek. To accomplish the goal of reducing soil loss and improving water quality, Growing Green Communities has worked with the Iowa Department of Natural Resources to identify areas of concentrated flow paths (CFPs) within the Camp Creek Watershed using LiDAR topographic mapping technology. A goal of this project is to identify sites expected to have the greatest impact in reducing soil loss and to install Best Management Practices (BMPs) at these sites. Landowners and other project partners will work to develop the most effective BMPs for each site. After the BMPs are designed and constructed, a conservation easement will be recorded to protect the BMPs. GGC plans to record 40 acres as easements. The easements will be purchased by Growing Green Communities and donated to a qualified conservation organization for long term management and maintenance.
Resumo:
The Brazilian East coast was intensely affected by deforestation, which drastically cut back the original biome. The possible impacts of this process on water resources are still unknown. The purpose of this study was an evaluation of the impacts of deforestation on the main water balance components of the Galo creek watershed, in the State of Espírito Santo, on the East coast of Brazil. Considering the real conditions of the watershed, the SWAT model was calibrated with data from 1997 to 2000 and validated for the period between 2001 and 2003. The calibration and validation processes were evaluated by the Nash-Sutcliffe efficiency coefficient and by the statistical parameters (determination coefficient, slope coefficient and F test) of the regression model adjusted for estimated and measured flow data. After calibration and validation of the model, new simulations were carried out for three different land use scenarios: a scenario in compliance with the law (C1), assuming the preservation of PPAs (permanent preservation areas); an optimistic scenario (C2), which considers the watershed to be almost entirely covered by native vegetation; and a pessimistic scenario (C3), in which the watershed would be almost entirely covered by pasture. The scenarios C1, C2 and C3 represent a soil cover of native forest of 76, 97 and 0 %, respectively. The results were compared with the simulation, considering the real scenario (C0) with 54 % forest cover. The Nash-Sutcliffe coefficients were 0.65 and 0.70 for calibration and validation, respectively, indicating satisfactory results in the flow simulation. A mean reduction of 10 % of the native forest cover would cause a mean annual increase of approximately 11.5 mm in total runoff at the watershed outlet. Reforestation would ensure minimum flows in the dry period and regulate the maximum flow of the main watercourse of the watershed.
Resumo:
In 2004 Walnut Creek was placed on the 303d list of impaired water bodies for lack of aquatic life with biological causes. Sediment from farmland as well as the stream banks was listed as the most likely stressor. In response to this listing a preliminary watershed assessment was completed by the six counties which have land in the Walnut Creek watershed. Walnut Creek flows through portions of Shelby, Pottawattamie, Montgomery, Mills, Page, and Fremont Counties before reaching its confluence with the West Nishnabotna River. The preliminary study assessed resource concerns and evaluated anticipated landowner participation levels for the six Huc 12 sub-watersheds which divide the Walnut Creek basin. These preliminary assessments revealed a priority sub-watershed which lies between US Hwy 6 and Hwy 34. A development grant was then funded by the Division of Soil Conservation to conduct a detailed assessment of this area. The detailed assessment involved an assessment of the uplands as well as the stream itself. A better understanding of the resource concerns was gained through the assessment, allowing for a comprehensive watershed plan to be developed. A variety of best management practices will be necessary for our project to be a success, many of which will be funded by other sources besides the WIRB. This grant is the first request for funding submitted by the East Pottawattamie and Montgomery SWCDs’. This grant will serve as the first critical step in building what is destined to be a true watershed success story.
Resumo:
This project brings together rural and urban partners to address the impairment of Miners Creek, a cold water trout stream in Northeast Iowa. It eliminates point source pollution contributions from the City of Guttenberg, decreases non-point source pollution and increases in-stream and near stream habitat in the Miners Creek Watershed. It specifically eliminates sewage and storm water runoff from the City of Guttenberg into Miners Creek; it develops, enhances and preserves wetlands; reduces direct livestock access to the. stream through rotational grazing systems; completes stream bank stabilizatio11 and in-stream habitat creation; targets upland land treatment; and promotes targeted application of continuous CRP and forestry practices. This project recognizes that non-point source pollution improvements could be hampered by point source pollutants ihat inhibit biologic reproduction and survival. It takes appropliate measures to improve all aspects of the stream ecosystem.
Resumo:
The primary goal of the Hewitt Creek watershed council is to have Hewitt-Hickory Creek removed from the Iowa impaired waters (303d) list. Hewitt Creek watershed, a livestock dense 23,005 acre sub-watershed of the Maquoketa River Basin, is 91.2% agricultural and 7.5% woodland. Since 2005, sixty-seven percent of 84 watershed farm operations participated in an organized watershed improvement effort using a performance based watershed management approach, reducing annual sediment delivery to the stream by 4,000 tons. Watershed residents realize that water quality improvement efforts require a long-term commitment in order to meet their watershed improvement goals and seek funding for an additional five years to continue their successful watershed improvement project. Cooperators will be provided incentives for improved environmental performance, along with incentives and technical support to address feedlot runoff issues and sub-surface nitrate-nitrogen loss. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce nutrient and sediment delivery. Twenty-five livestock operations will improve feedlot runoff control systems and five sub-surface bioreactors will be installed to reduce nitrate delivery from priority tile-drained fields. The Hewitt Creek council will seek additional cost-share funding for high-cost feedlot runoff control structures, sediment control basins and stream bank stabilization projects.
Resumo:
The Duck Creek watershed has been the target study area of multiple reports by multiple agencies including a 2009 DNR Watershed Master Planning Grant, and the 2011 Duck and Blackhawk Creek Stream Assessment. The information obtained from these reports has lead the City of Davenport to take a micro-watershed approach to identifying the significant contributors to flooding and water quality issues that affect Duck Creek, its tributaries and the surrounding landscape, and devise solutions to mitigate these concerns. The construction of the proposed Littig Area Detention Basin comes as a recommendation from the Comprehensive Stormwater Management Plan for Pheasant, Goose, and Silver Creeks as prepared by James M. Montgomery, Consulting Engineers, Inc. in September 1991. At the time this report was prepared this basin was one of eight regional detention basins proposed in the upstream watersheds to alleviate flooding on tributaries to Duck Creek. The basin is designed and situated to detain runoff from approximately two hundred and twenty-seven (227) acres of previously developed moderate density residential area with intermixed light business and schools. This basin will reduce flow rates entering the receiving waters from the two, five and ten year storm events by an average of eighty-five percent (85%) and reduce flow rates from the twenty-five, fifty, and one hundred year events by a11 average of fifty percent (50%). With this flow rate reduction it is anticipated that streambank erosion in the immediate downstream receiving waters can be reduced or even stopped. The reduction in sediment leaving this upstream area will greatly enhance the water quality further downstream in Goose and Duck Creeks.
Resumo:
Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.
Resumo:
Holiday Lake is included in the Walnut Creek watershed, which is listed on the 303(d) list of impaired water bodies. Research indicates that the causes of impairment are sedimentation and habitat alterations. To improve water quality, the goals of this project are to reduce the sediment delivery into Holiday Lake by 50% and assist in educating watershed residents about cost-effective ways to control sediment and nutrient contaminates. The best management practices will be installed to filter the water, reducing sediment and chemical loading into the lake. When all practices are installed, nearly 100% of the lake’s drainage area will be controlled.
Resumo:
Cover title: Teachers of Champaign County.
Resumo:
Description based on: May 1872; title from caption.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"EPA-905/9-91-006B"--Vol. 2.
Resumo:
"Updated October 2003."
Resumo:
Includes bibliographical references (p. [103]-109).