866 resultados para Program and Project Management for Enterprise Innovation
Resumo:
Purchasing and supply management (PSM) has become increasingly important for companies to survive in current highly competitive market. Increased outsourcing has extended the role of PSM, making external resource management and supplier relationships critical success factors in business. However, the recent research has mainly concentrated on large enterprises. Therefore the PSM issues related to medium-sized enterprises represent a significant research area. The thesis aims to explore the status and role of PSM in Finnish medium-sized firms, understand how strategic companies consider PSM to be, clarify what are the competence requirements for PSM professionals, and increase the understanding of PSM capabilities needed from the points view of individual competence and organisational capabilities. The study uses data that was collected in 2007 from purchasing executives at the director/CEO level representing a sample of 94 Finnish firms. 54 % of the respondent enterprises had a supply strategy. The total supply cost was on average 60 % of firms' turnover. Centralisation of PSM and outsourcing of logistics will increase in Finnish medium-sized enterprises. The findings point out that Finnish medium-sized enterprises had strategical features of PSM. However, Finnish firms have not concentrated on making strategies that relate to PSM. The elements that explain the existence of a supply strategy could be found in this study. It can be concluded from this study that there is an advantageous base for the development of strategic PSM, because nearly all the enterprises were of the opinion that PSM capabilities have an effect on business success. When reviewing the organisational capabilities, the five most important development elements were supplier relationships, both operational and strategic processes, time management, and personnel's competence. Training in internationalisation, strategic management, and communication could help to improve competences of PSM personnel.
Resumo:
Stora Enso has research centres in Finland, Sweden and Germany. The research centres use PIMS as a research project invoicing and monitoring system. Possible reorganization and new financing model for R&D functions have been considered and the project management system should be developed to support the new operation model. The objective of this thesis is to find a model for R&D project management, and to present the project management system of Stora Enso, and to discuss if the current system could be developed to respond to the new needs or should it be replaced with another system. The theoretical part of the study describes challenges in R&D project management, and presents different project characteristics, and methods for managing R&D project portfolio. It is also described how the project management system can support project monitoring and controlling, and how inter-project learning can be enhanced. The empirical part of the study presents the current project management system of Stora Enso and how the system should be developed to support Stora Enso’s R&D functions better. In conclusion, it is stated that there is no relevant reason to replace PIMS with another system, because PIMS can be developed to support R&D project management better with a hybrid system. It is also suggested that the new financing model should not be implemented before more comprehensive analysis of its effects is conducted.
Resumo:
This Master’s thesis studies the possibilities that social media tools can bring to help knowledge management in software development companies. It will introduce the most popular tools of social media and their usage possibilities in companies, not forgetting the possible downsides. One relevant aspect in this study is to investigate the possibilities of social media to help converting existing tacit knowledge into explicit. The purpose of the work is to create a proposal of social media utilization for a mid-sized software company, which has not utilized social media tools before. To be able to create the proposal, employees of the company are interviewed and a survey is executed to analyze the current situation. In addition a pilot project for trying out new social media tools is executed. The final result of this thesis introduces a tailored solution for the target company to start utilizing social media in its documentation and knowledge sharing processes. This new solution consists of multiple individual suggestions that are categorized and prioritized based on the significance and benefit that they bring to the company.
Resumo:
According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.
Resumo:
The thesis develops guidelines for the implementation of the health and safety management system according to the OHSAS 18001 standard, as well as the feasible threat analysis, project proposal schedule, future system quality improvements and organizational change evaluation. The theoretical part clarifies determination of occupational health and safety, its management system, the OHSAS 18001 standard and integrated management system compounded of triple ISO 14001, ISO 9001 and OHSAS 18001 standards. The literature includes such important aspects as human factor, organizational policies, possible benefits, threats, organizational safety culture, Deming’s quality improvement cycle, system implementation, maintenance and cost matters. The empirical part demonstrates real-life situation by using Andritz Pulp & Paper Oy as a case study. Prior the thesis proposal, Andritz Group is analysed including separate business areas, acquisition and integration strategies, current status of the health and safety management and parallel experiences of the largest business area Andritz Hydro. The proposal is aimed at improving the current health and safety system for the permanent and sub-contracted employees at Andritz Pulp & Paper both in Finland and in various projects globally.
Resumo:
Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.
Resumo:
This work presents synopsis of efficient strategies used in power managements for achieving the most economical power and energy consumption in multicore systems, FPGA and NoC Platforms. In this work, a practical approach was taken, in an effort to validate the significance of the proposed Adaptive Power Management Algorithm (APMA), proposed for system developed, for this thesis project. This system comprise arithmetic and logic unit, up and down counters, adder, state machine and multiplexer. The essence of carrying this project firstly, is to develop a system that will be used for this power management project. Secondly, to perform area and power synopsis of the system on these various scalable technology platforms, UMC 90nm nanotechnology 1.2v, UMC 90nm nanotechnology 1.32v and UMC 0.18 μmNanotechnology 1.80v, in order to examine the difference in area and power consumption of the system on the platforms. Thirdly, to explore various strategies that can be used to reducing system’s power consumption and to propose an adaptive power management algorithm that can be used to reduce the power consumption of the system. The strategies introduced in this work comprise Dynamic Voltage Frequency Scaling (DVFS) and task parallelism. After the system development, it was run on FPGA board, basically NoC Platforms and on these various technology platforms UMC 90nm nanotechnology1.2v, UMC 90nm nanotechnology 1.32v and UMC180 nm nanotechnology 1.80v, the system synthesis was successfully accomplished, the simulated result analysis shows that the system meets all functional requirements, the power consumption and the area utilization were recorded and analyzed in chapter 7 of this work. This work extensively reviewed various strategies for managing power consumption which were quantitative research works by many researchers and companies, it's a mixture of study analysis and experimented lab works, it condensed and presents the whole basic concepts of power management strategy from quality technical papers.
Resumo:
Hankintojen johtamisen kirjallisuus korostaa tehokkaan hankinnan olevan käypä keino tehostaa organisaation tulosta kokonaisvaltaisesti. Myös kasvava tietoisuus erityisesti epäsuorista hankintamenetelmistä ja työkaluista toimivat kannustimina tälle tutkimukselle. Tämän Pro Gradu -tutkimuksen päätarkoituksena on rakentaa kokonaisvaltainen ymmärrys epäsuorasta hankinnasta sekä löytää keinoja sen tehostamiseksi. Tutkimuksen tavoitteena on selvittää, miten globaali, monikansal- linen organisaatio voi parantaa kannattavuuttaan epäsuorissa hankinnoissa, sekä mitkä tekijät hankintastrategiassa vaikuttavat siihen. Tutkimus toteutettiin yksittäisenä tapaustutkimuksena suuren globaalin, monikan- sallisen yrityksen työntekijän näkökulmasta, Pääosa datasta pohjautuu vuonna 2015 toteutettuun Opportunity -analyysi projektiin, joka toteutettiin yhteistyössä ulkoisen konsulttifirman kanssa. Osa datasta pohjautuu puolistrukturoituihin haas- tatteluihin organisaation hankintajohtajan kanssa. Datan keruussa hyödynnettiin lisäksi henkilökohtaista havainnointia ja sekundääristä aineistoa organisaatiosta. Tämä Pro Gradu tutkimus on toteutettu kvalitatiivisella otteella, sisältäen joitakin kvantitatiivisia metodin piirteitä.
Resumo:
This paper studies vertical R&D spillovers between upstream and downstream firms. The model incorporates two vertically related industries, with horizontal spillovers within each industry and vertical spillovers between the two industries. Four types of R&D cooperation are studied : no cooperation, horizontal cooperation, vertical cooperation, and simultaneous horizontal and vertical cooperation. Vertical spillovers always increase R&D and welfare, while horizontal spillovers may increase or decrease them. The comparison of cooperative settings in terms of R&D shows that no setting uniformly dominates the others. Which type of cooperation yields more R&D depends on horizontal and vertical spillovers, and market structure. The ranking of cooperative structures hinges on the signs and magnitudes of three competitive externalities (vertical, horizontal, and diagonal) which capture the effect of the R&D of a firm on the profits of other firms. One of the basic results of the strategic investment literature is that cooperation between competitors increases (decreases) R&D when horizontal spillovers are high (low); the model shows that this result does not necessarily hold when vertical spillovers and vertical cooperation are taken into account. The paper proposes a theory of innovation and market structure, showing that the relation between innovation and competition depends on horizontal spillovers, vertical spillovers, and cooperative settings. The private incentives for R&D cooperation are addressed. It is found that buyers and sellers have divergent interests regarding the choice of cooperative settings and that spillovers increase the likelihood of the emergence of cooperation in a decentralized equilibrium.
Resumo:
The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.
Resumo:
Exercises and solutions in LaTex
Resumo:
Exercises and solutions in PDF
Resumo:
The aims of this theme are: •to identify and develop personal attributes that enable postgraduate students to manage a research project to the correct standard and to complete it on time; •to enable postgraduate students to plan and organise their research project in order to successfully reach their full potential in their chosen postgraduate degree; •to enable postgraduate students to apply appropriate time management skills to the planning of their research project; •to identify study skills and resource management strategies that can benefit postgraduate students to effectively organise and research their chosen field; •to develop team work skills within the postgraduate cohort studying the Project Management core theme.
Resumo:
Since mid-1990s, companies have adopted agile methods and incorporated them in their development methodologies. For this reason, future project managers and developers need to have a full understanding of these methods. At present, the university’s approach to agile methods is theoretical and is not reflected during the development of a product and their practical use. The purpose of this project is the creation of a software system in the form of a game, named Agile Game, which simulates their use. The system is designed for use as supplementary material in lectures, to help students understand agile methods, to present their use within a project, and to demonstrate how they differ from traditional project management methodologies. The final system, which is web based, was implemented using PHP, MySQL and JavaScript. It was fully tested against the requirements and evaluated by peer students. The evaluation showed that the majority of users were satisfied with the system but they thought that it should contain more detailed information at every step of the game. For this reason, some parts of the design and the content were reviewed to meet user requirements.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.