903 resultados para Operational Performance
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Pós-graduação em Engenharia de Produção - FEB
Resumo:
There are many arguments in the literature on environmental management stating that companies that have a significant environmental performance tend to be more competitive, because environmental management tends to generate positive effects on their operational performance. Despite the fact that such arguments are widely accepted, there is little empirical evidence yet of such a relationship in manufacturing contexts that are rarely studied thus far, such as those of developing countries. The paper aims to discuss these issues. Design/methodology/approach – With the objective of testing the positive relationship between environmental performance and operational performance, this research presents the data of a survey conducted with 75 ISO 9001-certified Brazilian companies. Such data were analyzed by means of structural equation modeling. Findings – The paper discovered that, indeed, environmental management relates in a positive, significant manner and large effect to the operational performance of companies.
Resumo:
This study aimed to technically and economically evaluate the Forwarder performance in the first cutting wood extraction from a Eucalyptus grandis plantation. Technical analysis included a movement and timing study by continuous method, and the productivity was determined using the extracted wood volume in cubic meters. Economical analysis included operational costs parameters and wood extraction cost. Results referred to the effective operational performance. Loading and unloading activities responded for more than ¾ of the total time of effective Forwarder operational cycle. Operational costs were influenced by maintenance and repair costs. The estimated cost of extraction was US$ 0.97 per cubic meter.
Resumo:
The current paper had as its objective to analyze the precision planter's operational performance according to five different displacement velocities and two types of jumpers for planting no-tillage corn. The utilized experimental delineation consisted of blocks at random with parcels subdivided in factorial scheme 2x5, two types of jumpers (4 and 5 staples) and five different displacement velocities (3.0; 4.5; 5.0; 7.0 e 9.0 km h-1) with four repetitions and by applying the average comparation test, as for the jumpers effects as for the displacement velocities effects, to the significance level of 5%. It was evaluated the data concerned to the longitudinal distribution of plants, average number of days for the emergence of seedlings, initial and final stand of plants, survival indices, mechanical harm on seeds, germination tests and grain production. It was also observed the planter displacement velocity effect of on variables as: longitudinal distribution of plants, average number of days for the emergence of seedlings, initial and final stand of plants, mechanical harm and yield. The survival indice of plants were high for all the studied velocities and jumpers. Among the studied velocities, the one of 5.0 km h-1 presented the highest yield to both types of jumpers.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia de Produção - FEG
Resumo:
This paper presents an analysis of the impact of the lightning overvoltages on the operational performance of the energized shield wire line technology (SWL) implemented in two locations of the State of Rondonia, Brazil. The analysis covers the periods of 1996 to 2000 (SWL Jaru) and 1997 to 2002 (SWL Itapua do Oeste), and shows that lightning is responsible for most of the system outages. The paper describes the satisfactory results achieved with the system, showing that the isolation and energization of the shield wires does not deteriorate the lightning performance of the 230 kV transmission lines. Comparisons between the performances of the SWL technology, conventional 34.5 kV lines, and thermal power plants in operation in the same region are also presented. The results demonstrate the technical and economical viability of the SWL technology and show that its application can lead to a postponement of investments.
Resumo:
Este trabalho teve o objetivo de verificar quais são as melhores práticas de produção para o setor moveleiro no Brasil, mediante a análise das relações entre as práticas de produção implantadas e prioridades competitivas e, também, entre indicadores de desempenho. A revisão teórica centrou em definir o pressuposto para o estudo das melhores práticas e realizar uma sistematização da literatura. Posteriormente, foi desenvolvida a pesquisa prática mediante uma survey em 99 empresas. Para a análise dos dados, foi empregada a técnica de modelagem de equações estruturais com o método de estimação dos mínimos quadrados ponderados. Os resultados revelaram que as práticas nas áreas de desenvolvimento de novos produtos, recursos humanos e planejamento e controle de produção estavam alinhadas à estratégia de produção e contribuíram para a melhoria de indicadores de desempenho operacional, sendo assim consideradas melhores práticas para o contexto estudado. Foram feitas discussões e sugestões para pesquisas futuras.
Resumo:
Designed by the Westinghouse Corporation in collaboration with Jacques Cousteau, DEEPSTAR-4000 is a deep diving research vehicle based on Captain Cousteau's DIVING SAUCER. An evaluation of DEEPSTAR's operational performance at sea is presented in this report through a description of typical dive procedures and the actual NAVOCEANO dive results.
Resumo:
The PVCROPS project (PhotoVolta ic Cost r€duction, Reliability, Operational performance, Prediction and Simulation), cofinanced by European Commission in the frame of Seventh Framework Programme, has compiled in the “Good and bad practices: Manual to improve the quality and reduce the cost of PV systems” a collection of good and bad practices in actual PV plants . All the situations it collects represent the state-of-the-art of existing PV installations all around Europe. They show how the different parts of an installation can be implem ented properly or not. The aim of this manual is to represent a reference text which can help any PV actor (installers, electricians, maintenance operators, owners, etc.) not only to check and improve an already existing installation but will also, and mainly, avoid the previously known bad practices for the construction of a new PV installation. Thus, solving a priori the known errors, new PV installations will be more reliable, efficient and cost-effective and can recover the initial investment in a shorter time. The manual is going to be free available in the PVCROPS website in several languages.
Resumo:
México es de los pocos países en el mundo que ha realizado dos grandes programas para la construcción de autopistas en colaboración con el sector privado. El primero, fue realizado entre 1989 y 1994, con resultados adversos por el mal diseño del esquema de concesiones; y, el segundo con mejores resultados, en operación desde 2003 mediante nuevos modelos de asociación público-privada (APP). El objetivo de la presente investigación es estudiar los modelos de asociación público-privada empleados en México para la provisión de infraestructura carretera, realizando el análisis y la evaluación de la distribución de riesgos entre el sector público y privado en cada uno de los modelos con el propósito de establecer una propuesta de reasignación de riesgos para disminuir el costo global y la incertidumbre de los proyectos. En la primera parte se describe el estado actual del conocimiento de las asociaciones público-privadas para desarrollar proyectos de infraestructura, incluyendo los antecedentes, la definición y las tipologías de los esquemas APP, así como la práctica internacional de programas como el modelo británico Private Finance Initiative (PFI), resultados de proyectos en la Unión Europea y programas APP en otros países. También, se destaca la participación del sector privado en el financiamiento de la infraestructura del transporte de México en la década de 1990. En los capítulos centrales se aborda el estudio de los modelos APP que se han utilizado en el país en la construcción de la red de carreteras de alta capacidad. Se presentan las características y los resultados del programa de autopistas 1989-94, así como el rescate financiero y las medidas de reestructuración de los proyectos concesionados, aspectos que obligaron a las autoridades mexicanas a cambiar la normatividad para la aprobación de los proyectos según su rentabilidad, modificar la legislación de caminos y diseñar nuevos esquemas de colaboración entre el gobierno y el sector privado. Los nuevos modelos APP vigentes desde 2003 son: nuevo modelo de concesiones para desarrollar autopistas de peaje, modelo de proyectos de prestación de servicios (peaje sombra) para modernizar carreteras existentes y modelo de aprovechamiento de activos para concesionar autopistas de peaje en operación a cambio de un pago. De estos modelos se realizaron estudios de caso en los que se determinan medidas de desempeño operativo (niveles de tráfico, costos y plazos de construcción) y rentabilidad financiera (tasa interna de retorno y valor presente neto). En la última parte se efectúa la identificación, análisis y evaluación de los riesgos que afectaron los costos, el tiempo de ejecución y la rentabilidad de los proyectos de ambos programas. Entre los factores de riesgo analizados se encontró que los más importantes fueron: las condiciones macroeconómicas del país (inflación, producto interno bruto, tipo de cambio y tasa de interés), deficiencias en la planificación de los proyectos (diseño, derecho de vía, tarifas, permisos y estimación del tránsito) y aportaciones públicas en forma de obra. Mexico is one of the few countries in the world that has developed two major programs for highway construction in collaboration with the private sector. The first one was carried out between 1989 and 1994 with adverse outcomes due to the wrong design of concession schemes; and, the second one, in operation since 2003, through new public-private partnership models (PPPs). The objective of this research is to study public-private partnership models used in Mexico for road infrastructure provision, performing the analysis and evaluation of risk’s distribution between the public and the private sector in each model in order to draw up a proposal for risk’s allocation to reduce the total cost and the uncertainty of projects. The first part describes the current state of knowledge in public-private partnership to develop infrastructure projects, including the history, definition and types of PPP models, as well as international practice of programs such as the British Private Finance Initiative (PFI) model, results in the European Union and PPP programs in other countries. Also, it stands out the private sector participation in financing of Mexico’s transport infrastructure in 1990s. The next chapters present the study of public-private partnerships models that have been used in the country in the construction of the high capacity road network. Characteristics and outcomes of the highway program 1989-94 are presented, as well as the financial bailout and restructuring measures of the concession projects, aspects that forced the Mexican authorities to change projects regulations, improve road’s legislation and design new schemes of cooperation between the Government and the private sector. The new PPP models since 2003 are: concession model to develop toll highways, private service contracts model (shadow toll) to modernize existing roads and highway assets model for the concession of toll roads in operation in exchange for a payment. These models were analyzed using case studies in which measures of operational performance (levels of traffic, costs and construction schedules) and financial profitability (internal rate of return and net present value) are determined. In the last part, the analysis and assessment of risks that affect costs, execution time and profitability of the projects are carried out, for both programs. Among the risk factors analyzed, the following ones were found to be the most important: country macroeconomic conditions (inflation, gross domestic product, exchange rate and interest rate), deficiencies in projects planning (design, right of way, tolls, permits and traffic estimation) and public contributions in the form of construction works.