960 resultados para Construction, Engineering, Ict, Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este trabajo tiene como propósito determinar los factores de motivación en los trabajadores de la industria de la construcción en Colombia, tomando como muestra una población de empleados de la ciudad de Pasto, Colombia. Inicialmente se revisaron artículos científicos de diversos países que estudian los efectos de factores motivadores, desmotivadores, características intrínsecas y extrínsecas, relacionados con el rendimiento laboral. De esta forma se identificaron los factores que conforman la base del instrumento “Study Of Motivators And Demotivators Affecting The Performance Of Employees In The Construction Industry–Questionare” entregado a 190 empleados. Los resultados fueron clasificados, mediante un software estadístico SPSS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the increasing popularity and adoption of building information modeling (BIM), the amount of digital information available about a building is overwhelming. Enormous challenges remain however in identifying meaningful and required information from a complex BIM model to support a particular construction management (CM) task. Detailed specifications of information required by different construction domains and expressive and easy-to-use BIM reasoning mechanisms are seen as an important means in addressing these challenges. This paper analyzes some of the characteristics and requirements of component-specific construction knowledge in relation to the current work practice and BIM-based applications. It is argued that domain ontologies and information extraction approaches, such as queries could significantly bring much needed support for knowledge sharing and integration of information between design, construction and facility management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The nature of construction projects and their delivery exposes participants to accidents and dangers. Safety climate serves as a frame of reference for employees to make sense of safety measures in the workplace and adapt their behaviors. Though safety climate research abounds, fewer efforts are made to investigate the formation of a safety climate. An effort to explore forming psychological safety climate, an operationalization of safety climate at the individual level, is an appropriate starting point. Taking the view that projects are social processes, this paper develops a conceptual framework of forming the psychological safety climate, and provides a preliminary validation. The model suggests that management can create the desired psychological safety climate by efforts from structural, perceptual, interactive, and cultural perspectives. Future empirical research can be built on the model to provide a more comprehensive and coherent picture of the determinants of safety climate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As a vital component of construction professional services (CPS), construction management consultancy is in nature knowledge-intensive and client-tailored. Although recent studies have acknowledged the increasing role of this subsector of CPS in the attainment of sustainable construction, little attention has been given to the education and training of its main body, namely construction management consultants (CMCs). This study investigated the competence and knowledge structure of CMCs by taking China as an example. Using the methods of interview and questionnaire survey, three key competences of CMCs and the underpinned knowledge structure were identified. The identified competences are personnel quality, onsite practical skills, and continuing professional learning. Underpinned these competences are the knowledge structure composed of a number of disciplines including construction cost planning and control, civil engineering and construction, engineering contract and law, and construction project management. The research findings lay a solid foundation for future studies to probe into the role of construction management consultants in the area of sustainable construction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study of the organisational culture in the construction industry is still in the stage of debate (Oney-Yazıcı et al., 2007). Despite the complexities involved in measuring the culture of the construction industry (Tijhuis and Fellows, 2012), this culture is regarded as being worthy of research, especially in relation to the organisational culture needed to support quality management systems (Koh and Low, 2008; Watson and Howarth, 2011) and to improve organisational effectiveness, and therefore, organisational performance (Coffey, 2010; Cheung et al., 2011). A number of recent studies have examined the construction companies’ organisational culture within the context of the use of Cameron and Quinn’s Competing Value Framework (CVF), as well as the use of their Organizational Culture Assessment Instrument (OCAI) as the conceptual paradigm for the analyses (Thomas et al., 2002; Nummelin, 2006; Oney- Yazıcı et al., 2007; Koh and Low, 2008). However, there has been little research based on the use of Cameron and Quinn’s CVF-OCAI tool for identifying types of construction companies’ organisational culture and their influences on the implementation of QMS-ISO 9001. Research output and information is also very limited relating to the strength of the companies’ organisational culture driving an effective QMS-ISO 9001 implementation, affecting the companies’ effectiveness. To rectify these research gaps, the research has been aimed to study organisational culture types (based on CVF) and their influences on the implementation of QMS-ISO 9001:2008 principles and elements, which eventually lead to improved companies’ quality performance. In order to fully examine the status of the QMS being implemented, the research has studied the relationships of the barriers of QMS implementation with the implementation of QMS-ISO 9001:2008 principles and elements and with the business performance of the companies, as well as the examination of the relationships of the implementation of QMS-ISO 9001:2008 principles and elements with the companies’ business performance. The research output has been the development of fundamental and original studies on the study topics, to provide the knowledge for improvements in Indonesian construction companies’ quality performance and quality outcomes.