885 resultados para construction sector
Resumo:
Projections into future increasingly suggest that the intensity and frequency of Extreme Weather Events (EWEs) will increase in the future. This has demanded the business organisations as well to be prepared to face the increasing risk of EWEs, in order to ensure their business continuity. However, current evidence base suggests that businesses, especially SMEs, are not adequately prepared to face the threat of such events. Ability to adequately prepare them has been hindered by the lack of in depth studies addressing this issue. The paper presents a doctoral study designed to investigate the resilience of SMEs operating in the construction sector; which is said to be a highly vulnerable sector for the impacts of EWEs, and their supply chains to EWEs. A conceptual framework developed to investigate this issue is presented and explained. It is argued that the resilience of construction SMEs and their supply chains against EWEs can be improved by a combination of reducing their vulnerability, enhancing coping capacity and implementing coping mechanisms. Importance of undertaking a broader view to include the whole supply chain in making business decisions with regard to EWEs by SMEs is also highlighted.
Resumo:
Weather extremes have created a considerable impact on Small and Medium-sized Enterprises (SMEs) in the UK during the recent years, especially on SMEs in the construction sector. Evidence in relation to the recent weather extremes have demonstrated that SMEs are some of the worst impacted by the Extreme Weather Events (EWEs) and have confirmed them as a highly vulnerable section of the UK economy to the impact of extreme weather. This is of particular importance to the construction industry, as an overarching majority of construction companies are SMEs who account for the majority of employment and income generation within the industry. Whilst construction has been perceived as a sector significantly vulnerable to the impacts of EWEs, there is scant evidence of how construction SMEs respond to such events and cope with their impact. Based on the evidence emerged from case studies of construction SMEs, current coping strategies of construction SMEs were identified. Some of the strategies identified were focused at organisational level whereas others were focused at project level. Further, some of the strategies were general risk management / business continuity strategies whereas others have been specifically developed to address the risk of EWEs. Accordingly, coping strategies can be broadly categorised based on their focus; i.e. those focused at project or organisational level, and based on the risks that they seek to address; i.e. business / continuity risks in general or EWE risk specifically. By overlapping these two aspects; their focus and risks that they seek to address, four categories of coping strategies can be devised. There are; general risk management strategies focused at business level, general risk management strategies focused at project level, EWE specific strategies focused at business level, and EWE specific strategies focused at project level. It is proposed that for a construction SME to effectively cope with the impact of EWEs and develop their resilience against EWEs a rich mix of these coping strategies are required to suite the particular requirements of the business.
Resumo:
The sudden change in environmental munificence level in the construction sector
during the period 2007 – 2015 provides a natural experiment to investigate strategic
and operating actions of firms, particularly during an environmental jolt. Statistics on
business failures corroborate that neither academics nor practitioners have succeeded
in guiding strategic action during periods of environmental jolt. Despite the recent
increase of turnaround research in the general management domain, its use in the
construction management realm remains underexplored. To address this research
gap, five exploratory case studies of an ongoing PhD study were used to examine the
turnaround strategies of construction contractors during a period of economic
contraction and growth. The findings show that, although retrenchment is often
considered to be a short-term strategy, this is clearly not the case; with the majority of
contractors maintaining the strategy for 6-7 years. During the same period,
internationalization became critical, with the turnaround process shifting towards
strategic reorientation that altered the firms' market domain. The case studies further
suggest that strategic and operational actions resonate quite well with contemporary
practice-based approaches to strategy making. The findings provide valuable
assistance for construction contractors in dealing with organisational decline and in
developing a successful turnaround response.
Resumo:
The construction industry is responsible for 40% of European Union (EU) end-use emissions but addressing this is problematic, as evident from the performance gap between design intention and on-site energy performance. There is a lack of the expertise needed for low energy construction (LEC) in the UK as the complex work processes involved require ‘energy literacy’ of all construction occupations, high qualification levels, broad occupational profiles, integrated teamworking, and good communication . This research identifies the obstacles to meeting these requirements, the nature of the expertise needed to break down occupational divisions and bridge those interfaces where the main heat losses occur, and the transition pathway implied. Obstacles include a decline in the level, breadth and quality of construction vocational education and training (VET), the lack of a learning infrastructure on sites, and a fragmented employment structure. To overcome these and develop enhanced understanding of LEC requires a transformation of the existing structure of VET provision and construction employment and a new curriculum based on a broader concept of agency and backed by rigorous enforcement of standards. This can be achieved through a radical transition pathway rather than market-based solutions to a low carbon future for the construction sector.
Resumo:
The adoption of e-business by Small and Medium Enterprises (SMEs) in construction lags from other service and product businesses within the building sector. This paper develops a model to facilitate the uptake of electronic business, especially in relation to SMEs within the Australian construction sector. Ebusiness is defined here as “the undertaking of business-related transactions, communications and information exchanges utilising electronic medium and environment”, the elicited model highlights significant changes needed including skills development, social, economic and cultural issues. The model highlights barriers for SMEs to migrate towards e-transactions, e-bidding, e-tendering and ecollaboration and provides learning and skills development components. The model is derived from case study fieldwork and is to inform diffusion and awareness models for best practice. Empirical techniques included ‘focus group’ interviews and one to one ‘interviews’. Data was transcribed and analysed using cluster analyses. Preliminary results reveal that current models for e-business adoption are not effective within the construction context as they have emerged from other service and product industries - such as retail or tourism. These generic models have largely ignored the nature of the construction industry, and some modifications appears to be required. This paper proposes an alternative adoption model which is more sensitive to the nature of the industry – particularly for e-business uptake in building SME’s.
Resumo:
After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.
Resumo:
Sustainable development is about making societal investments. These investments should be in synchronization with the natural environment, trends of social development, as well as organisational and local economies over a long time span. Traditionally in the eyes of clients, project development will need to produce the required profit margins, with some degrees of consideration for other impacts. This is being changed as all citizens of our society are becoming more aware of concepts and challenges such as the climate change, greenhouse footprints, and social dimensions of sustainability, and will in turn demand answers to these issues in built facilities. A large number of R&D projects have focused on the technical advancement and environmental assessment of products and built facilities. It is equally important address the cost/benefit issue, as developers in the world would not want to loose money by investing in built assets. For infrastructure projects, due to its significant cost of development and lengthy delivery time, presenting the full money story of going green is of vital importance. Traditional views of life-cycle costing tend to focus on the pure economics of a construction project. Sustainability concepts are not broadly integrated with the current LCCA in the construction sector. To rectify this problem, this paper reports on the progress to date of developing and extending contemporary LCCA models in the evaluation of road infrastructure sustainability. The suggested new model development is based on sustainability indicators identified through previous research, and incorporating industry verified cost elements of sustainability measures. The on-going project aims to design and a working model for sustainability life-cycle costing analysis for this type of infrastructure projects.
Resumo:
This research aims to increase understanding of and delivery to qualitative (or intangible) outcomes and impacts of major economic infrastructure projects (i.e. bridges, roads, water infrastructure and the like), and the role of stakeholder engagement in this process.-------- Recent doctoral research completed at the Queensland University of Technology by the author investigated how the principles of corporate responsibility are applied in the construction sector. This related specifically to major economic infrastructure projects (hereafter referred to as major projects), with particular regard to urban transportation projects. One outcome of this past research was a value-mapping framework which enables organisations to track project outcomes to pre-existing corporate objectives, and report on these throughout the project life-cycle. Two recommendations for future research from that work formed the basis for this current research: • How can qualitative measurables be better integrated into decision-making on major economic infrastructure projects? • How can non-contractual stakeholders be more effectively engaged with on these projects? The link between these two areas may relate to the stakeholders’ role in qualitative indicator identification and measurement. This is a key point for future investigation.---------- The aim of this research is thus to further investigate these two areas, with the intent of (i) better defining the research direction; (ii) identifying potential research partners; and (iii) identify possible sources of future funding.
Resumo:
This paper presents the results of a pilot study examining the factors that impact most on the effective implementation of, and improvement to, Quality Mangement Sytems (QMSs) amongst Indonesian construction companies. Nine critical factors were identified from an extensive literature review, and a survey was conducted of 23 respondents from three specific groups (Quality Managers, Project Managers, and Site Engineers) undertaking work in the Indonesian infrastructure construction sector. The data has been analyzed initially using simple descriptive techniques. This study reveals that different groups within the sector have different opinions of the factors regardless of the degree of importance of each factor. However, the evaluation of construction project success and the incentive schemes for high performance staff, are the two factors that were considered very important by most of the respondents in all three groups. In terms of their assessment of tools for measuring contractor’s performance, additional QMS guidelines, techniques related to QMS practice provided by the Government, and benchmarking, a clear majority in each group regarded their usefulness as ‘of some importance’.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.
Resumo:
Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.
Resumo:
This case study reports on the impact and business transformation of an IMP³rove assessment and follow-up workshop on Australian SME LEVESYS (www.levesys.com), which was undertaken by QMI Solutions. Innovation was not a foreign term to the company, which focuses on the development of enterprise resource planning (ERP) software for the Australian construction sector. However, before seeing and undergoing the IMP³rove process, this company had difficulty articulating their innovation problems and, therefore, had not achieved growth targets from its R&D efforts. This case study highlights the role of IMP³rove in assisting LEVESYS to take the first step in transforming itself through innovation.
Resumo:
Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. Many research centres around the world are investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress . The opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely and industry is encouraged to become involved.
Resumo:
Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. There are many research centres around the world investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. This roadmap prioritises and details the research to be performed, why and by whom. In particular, some 25 CIB Working Commissions and Task Groups are explained as having potential roles in the delivery of this research theme. We are extremely privileged to have been urged on by such distinguished construction professionals in their forewords and the case for research. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress1. However, a similar issue arises between industry, clients, educators and trainers; the latter have particular challenges, having existed for many years in a sector that has had relatively few technological changes. However, the opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely. Whilst this Roadmap is specifically targeted at the Standing Commissions and Task Groups of the CIB, it is hoped that there are elements for research and applied research across academia and industry.