1000 resultados para Projetos de engenharia


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The civil construction in Brazil has grown a lotover the last years. This has caused a greater competition between companies of the sector. A little difference in quality in service or product a company offers can determine their success in the market. There is a growing demand for tools that optimize processes and bring greater quality to each activity in these companies. Performance measurement systems make it possible to control process efficiency and effectiveness using performance indicators. Considering this need, the paper before you has the objective of creating basic guidelines to introduce performance measurement systems inbuilding installations project companies. A theoretical reference is presented to describe organizational aspects of project companies along with performance measurement systems characteristics. Using a qualitative research methodology, a study case was executed with interviews, observation and document analysis as evidence sources. In the study case, limitations where identified, such as, high degree of product and process flexibility, dependence on subjective analysis for decision making and lack of specialized information systems. Considering the theoretical reference and the study case,the proposed guidelines intend to ease and guarantee greater chances of success when implanting one of these systems

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pipelines are linear construction that intersect several environments, requiring integration of environmental and technical aspects in its various elaboration steps. Environmental impact assessment if made to integrate the environmental information to enable environmental characterization, possibility identify previously fragilities of environment what contributes to the safety forecast of the significant impacts. These studies shall consider superimpose of the elements and the worsening of critical situations that already exists. In this way, meet and analyse informations about the environmental impact assessment, constructive aspects related to pipelines transport and get environmental impact studies of the case studies, providing the student a critical vision for the discussion of the apropiate balance between description and analysis, methodological rigour and the interface between construction and the environmente with inserts. Performing the critical analysis of methodologies and applied criteria for the environmental diagnosis and impact identification, search improve the methodologies for elaboration of environmental impact studies for linear construction, particulary pipelines, minin conflicts and giving security for the license process. Await provide subsidy to direction data collection, for choosing environmental indicator and for the prognosis and indentification of impacts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Customer focus , high competitiveness and striving for excellence in quality of service are some of the main features of the current market . Planned and make decisions with greater certainty is no longer an option a few years . The current managers are seeking ways to eliminate waste and increase financial and productive profitability of your company in order to achieve higher performance at a lower cost . The AHP is one of the main concepts of this goal by providing an analysis on multiple criteria , enhancing decision-making and enhancing the gains , with a technique that is designed to take into account all the key criteria for choosing an alternative , according to the perspective of the designer as both suppliers and customers . Emerging as a new way to minimize errors , and make an informed and consistent decision. The use of this method in construction projects is a recent phenomenon , which has much to be explored , an intense analysis of the processes is required to enable it to consider the concepts and present a consistent and grounded proposal

Relevância:

30.00% 30.00%

Publicador:

Resumo:

L'un des facteurs nécessaires pour qu’une entreprise reste compétitive sur le marché est la création ou l'amélioration d'un produit afin qu’il réponde aux besoins et aux attentes des clients, ainsi, le Processus de Développement de Produits (PDP) est essentiel. Pour la réussite du PDP, il est souhaitable de suivre un système standard de gestion de projet. L'objectif de cette étude est d'analyser la gestion de projets dans le processus de développement de produits dans l'industrie automobile afin d'identifier les possibilités d’amélioration. Par conséquent, nous avons procédé à une revue de littérature sur le sujet, analysé les lignes directrices et les pratiques du processus de développement de produit dans l’entreprise. Comme résultat, il a été obtenu que le système de développement de produits créé par l’entreprise requiert la clarification des outils utiles à la gestion de projet. Un problème de communication et de gestion des coûts a également été constaté dans le domaine du développement du moteur lourd

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, in business environment, organizations seek to differentiate through special programs and plans, taking the concepts of sustainability, performance and benefits generated for society. Based in this competitive environment, as companies depend on the use of subcontractors to perform services for your different customers, the work performed by them is directly related to the vision created by the final customer’s vision of the company responsible for the project. Considering that the supplier hired to execute the project does not share the strategic concepts related to the level of services to be offered to the final customers, thus creating the need to develop methods that enable the alignment between the project owner, responsible for preparing the executive project, and the supplier, responsible for the execution of the work. Tangent to this need, it was necessary to create a method of evaluation and categorization for suppliers to hired for the projects. As a result it has been proposed a process of categorization of suppliers, through the restriction of possible companies to be hired for a project designed to promote alignment between strategies and continuous improvement of the solutions offered to the market

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In a supplier of building products were identified difficulties in communication between the Product Development area and other areas of the company that could spoil projects and processes. The process of product development is important in placing the company in the market, and through research and planning, design new products and seek to comply with the costumer in relation to deadlines, quality and cost-effective. The development of a product involves many areas in the company and communication is essential in this process. The goal of this study was to identify possible communication problems permeated by organizational culture and structure of project management working in the company. A survey was applied using a Likert scale in three different areas of the company, with questions including the topics: communication, culture and organizational structure of project management and subsequently conducted the median test and the Spearman test to analysis of responses. With the understanding and analysis of the survey it was confirmed the difficulties of communication between people and the areas of the company, besides there is an influence of the type of culture acting in the company and the current management structure of the project in a good performance of internal communication

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Through awareness of new trends of consumption of the population with regard to housing, comfort, entertainment, security and sustainability, it was crafted a work that set out to study and develop the concept of home automation and how it will revolutionize the electrical installation projects and energy savings. A pre-wiring project, taking into account, basically, the installed load, is presented as a basis for comparison. The protocols for communication between intelligent devices in an automation environment, used in the work, are the X-10, LonWorks and UPnP. The home network is studied and divided into subsystems, for a better understanding, which are the lighting, audio, video and multimedia system, security, air conditioning and central vacuum system, and the idea of integrated design and system integrator is introduced, showing the change necessity in the design philosophy of electrical installations. The main means of energy savings in an automated home, such as dimerization, master off and smart meters are presented and, finally, it was concluded that there is a need to structure electrical installation projects more comprehensive with regard to home automation, in order to become more efficient and useful to users

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work is quantified according to the ABEPRO areas, the number of works the Course Conclusion (TCCs) and Hours (CH) Course of Production Engineering, UNESP Guaratinguetá. Based on this quantification were found to be significant discrepancies between the TCCs and CH. Quality and Logistics observed for the larger discrepancies, with 26% and 17% of the number of TCCs, respectively. Both areas have only 6% of the time. They are also used data from researchers at the National Council of Scientific and Technological Development (CNPq) in the areas of Production Engineering. In the area of Quality and Logistics, the researchers account for 8% and 5%, respectively, but are most prominent researchers in the field of Operations Research, with 37%. However, this view can help the department to organize the curriculum, with the development of teaching projects, methods and means of education, and visibility to help future hiring for the department

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

30.00% 30.00%

Publicador:

Resumo:

TFor companies to remain competitive should seek investment in the project management through new tools. The method Critical Chain has been considered an innovative way to manage projects, to promote change and give great results. However, there are still some questions to be answered and there are few papers reporting on the implementation of CCPM method in real environment of multiple projects. This work analyze the deployment process of Critical Chain at a company in the technology sector, in order to check the risk factors, advantages and difficulties in that process. Showing not only the likely benefits, but also the possible difficulties, mainly cultural and behavioral, inherent in all business transformation processes in order to support the implementation of all theoretical architecture for corporate reality

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Management information systems such as ERP can bring to businesses many competitive advantages. There is a great demand for systems projects to consulting firms that have knowledge to manage this particular type of project. However, the rate of system projects that cannot achieve success is very high. The methodology of Project Management, standardized by the Project Management Institute, is a globally recognized standard and used even in projects involving information technology. In the present study, was made a case study of an ERP system implementation project in a large company, by a consulting firm. From this analysis and on contributions from the literature, recommendations were proposed for the project management, in order to better direct the PMI methodology in large projects involving systems like ERP

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work it was made analysis of a simple pressure vessel, using the analytical development studied in Mechanics of Materials disciplines, and then using the standard required by ASME. Following the simulation was realized using Autodesk Mechanical Simulation software to calculate the principal stresses in a pressure vessel. The simulation was done in a single vessel without nozzles, compared with the analytic calculation. After that, the simulation of another fictitious pressure vessel was done by adding three nozzles to verify the influence of the nozzles in the principal stresses and compared with the analytical results. After the simulation, it was found that the principal are bigger in the pressure vessel with nozzles, but they decrease at a small distance from the nozzle becoming equal to the stresses in the vessel without nozzles. The analytical results calculated according to the ASME agree with simulated results

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este artigo descreve um conjunto de atividades educativas desenvolvidas no âmbito do projeto “Lab InCognITA – Laboratório de Inovação em Cognição, Informação, Tecnologia e Aprendizagem”, que objetiva promover o desenvolvimento de um conjunto de atividades e projetos com escolas públicas de nível médio, vinculadas à Diretoria de Ensino de Guaratinguetá, buscando despertar o interesse dos alunos para as áreas tecnológicas e engenharias. Destaca-se a importância dos recursos didáticos, em especial os baseados em experimentação, para promover uma melhoria no interesse dos estudantes pelas ciências exatas. A operacionalização do projeto é descrita por meio da apresentação das atividades previstas para o seu desenvolvimento, e de como estas são realizadas durante eventos denominados “Visita à UNESP”, em que alunos das escolas vêm até o Campus da UNESP – Guaratinguetá. Os resultados parciais obtidos sugerem que as atividades desenvolvidas durante as visitas têm contribuído para despertar o interesse dos estudantes para as áreas de Exatas e Engenharias.