The development of new products or processes involves the creation, re-creation and integration of conceptual models from the related scientific and technical domains. Particularly, in the context of collaborative networks of organisations (CNO) (e.g. a multi-partner, international project) such developments can be seriously hindered by conceptual misunderstandings and misalignments, resulting from participants with different backgrounds or organisational cultures, for example. The research described in this article addresses this problem by proposing a method and the tools to support the collaborative development of shared conceptualisations in the context of a collaborative network of organisations. The theoretical model is based on a socio-semantic perspective, while the method is inspired by the conceptual integration theory from the cognitive semantics field. The modelling environment is built upon a semantic wiki platform. The majority of the article is devoted to developing an informal ontology in the context of a European R&D project, studied using action research. The case study results validated the logical structure of the method and showed the utility of the method.
Resumo:
The overall goal of the REMPLI project is to design and implement a communication infrastructure for distributed data acquisition and remote control operations using the power grid as the communication medium. The primary target application is remote meter reading with high time resolution, where the meters can be energy, heat, gas, or water meters. The users of the system (e.g. utility companies) will benefit from the REMPLI system by gaining more detailed information about how energy is consumed by the end-users. In this context, the power-line communication (PLC) is deployed to cover the distance between utility company’s Private Network and the end user. This document specifies a protocol for real-time PLC, in the framework of the REMPLI project. It mainly comprises the Network Layer and Data Link Layer. The protocol was designed having into consideration the specific aspects of the network: different network typologies (star, tree, ring, multiple paths), dynamic changes in network topology (due to network maintenance, hazards, etc.), communication lines strongly affected by noise.
Resumo:
The investigation which employed the action research method (qualitative analysis)was divided into four fases. In phases 1-3 the participants were six double bass students at Nossa Senhora do Cabo Music School. Pilot exercises in creativity were followed by broader and more ambitious projects. In phase 4 the techniques were tested and amplified during a summer course for twelve double bass students at Santa Cecilia College.
Resumo:
To show with the case of Applied Optics (AO), the adequacy of blended learning to the teaching/learning process in experimental Science and technology (S&T).
Resumo:
Interactive products are appealing objects in a technology-driven society and the offer in the market is wide and varied. Most of the existing interactive products only provide either light or sound experiences. Therefore, the goal of this project was to develop a product aimed for children combining both features. This project was developed by a team of four thirdyear students with different engineering backgrounds and nationalities during the European Project Semester at ISEP (EPS@ISEP) in 2012. This paper presents the process that led to the development of an interactive sound table that combines nine identical interaction blocks, a control block and a sound block. Each interaction block works independently and is composed of four light emitting diodes (LED) and one infrared (IR) sensor. The control is performed by an Arduino microcontroller and the sound block includes a music shield and a pair of loud speakers. A number of tests were carried out to assess whether the controller, IR sensors, LED, music shield and speakers work together properly and if the ensemble was a viable interactive light and sound device for children.
Resumo:
Waste oil recycling companies play a very important role in our society. Competition among companies is tough and process optimization is essential for survival. By equipping oil containers with a level monitoring system that periodically reports the level and alerts when it reaches the preset threshold, the oil recycling companies are able to streamline the oil collection process and, thus, reduce the operation costs while maintaining the quality of service. This paper describes the development of this level monitoring system by a team of four students from different engineering backgrounds and nationalities. The team conducted a study of the state of the art, draw marketing and sustainable development plans and, finally, designed and implemented a prototype that continuously measures the container content level and sends an alert message as soon as it reaches the preset capacity.
Resumo:
The work agenda includes the production of a report on different doctoral programmes on “Technology Assessment” in Europe, the US and Japan, in order to analyse collaborative post-graduation activities. Finally, the proposals on collaborative post-graduation programme between FCTUNL and ITAS-FZK will be organised by an ongoing discussion process with colleagues from ITAS.
Resumo:
OBJECTIVE To analyze the trends and factors associated with the antidepressant use among older adults. METHODS This population-based study evaluated older adults in 1997 (n = 351, baseline) and the survivors at the 15th follow-up year (n = 462, in 2012) among the aging cohort of Bambuí. The prevalence of antidepressant use was estimated, and the most commonly used antidepressants each year were identified. Prevalence ratios with 95% confidence intervals were estimated using Poisson regression with robust variance to investigate differences in the prevalence of use between 1997 and 2012. RESULTS The overall consumption of antidepressants (PR = 2.87, 95%CI 1.94;4.25) and of selective serotonin reuptake inhibitors (PR = 7.50, 95%CI 3.74;15.02) was significantly higher in 2012. However, no significant difference was observed in the use of tricyclic antidepressants between the two cohorts (PR = 0.89, 95%CI 0.49;1.62). In the 2012 cohort, antidepressant use was associated with females, increased age, increased income (≥ 4 minimum wages), self-assessment of health as reasonable, and attending ≥ 5 medical consultations in the last 12 months. CONCLUSIONS The increased consumption of antidepressants in the period due to increased use of selective serotonin reuptake inhibitors was consistent with results observed in international studies of different population groups and contexts. The positive correlation observed between antidepressant use and family income may be a warning of possible inequalities in access to mental health services.
Resumo:
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Resumo:
OBJECTIVE To evaluate the viability of a professional specialist in intra-hospital committees of organ and tissue donation for transplantation. METHODS Epidemiological, retrospective and cross-sectional study (2003-2011 and 2008-2012), which was performed using organ donation for transplants data in the state of Sao Paulo, Southeastern Brazil. Nine hospitals were evaluated (hospitals 1 to 9). Logistic regression was used to evaluate the differences in the number of brain death referrals and actual donors (dependent variables) after the professional specialist started work (independent variable) at the intra-hospital committee of organ and tissue donation for transplantation. To evaluate the hospital invoicing, the hourly wage of the doctor and registered nurse, according to the legislation of the Consolidation of Labor Laws, were calculated, as were the investment return and the time elapsed to do so. RESULTS Following the nursing specialist commencement on the committee, brain death referrals and the number of actual donors increased at hospital 2 (4.17 and 1.52, respectively). At hospital 7, the number of actual donors also increased from 0.005 to 1.54. In addition, after the nurse started working, hospital revenues increased by 190.0% (ranging 40.0% to 1.955%). The monthly cost for the nurse working 20 hours was US$397.97 while the doctor would cost US$3,526.67. The return on investment was 275% over the short term (0.36 years). CONCLUSIONS This paper showed that including a professional specialist in intra-hospital committees for organ and tissue donation for transplantation proved to be cost-effective. Further economic research in the area could contribute to the efficient public policy implementation of this organ and tissue harvesting model.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.