815 resultados para PERFORMANCE INDICATORS
Resumo:
Archival research was conducted on the inception of preemployment psychological testing, as part of the background screening process, to select police officers for a local police department. Various issues and incidents were analyzed to help explain why this police department progressed from an abbreviated version of a psychological battery, to a much more sophisticated and comprehensive set of instruments. While doubts about psychological exams do exist, research has shown that many are valid and reliable in predicting job performance of police candidates. During a three year period, a police department hired 162 candidates (133 males and 29 females) who received "acceptable" psychological ratings and 71 candidates (58 males and 13 females) who received "marginal" psychological ratings. A document analysis consisted of variables that have been identified as job performance indicators which police psychological testing tries to predict, and "screen in" or "screen out" appropriate applicants. The areas of focus comprised the 6-month police academy, the 4-month Field Training Officer (FTO) Program, the remaining probationary period, and yearly performance up to five years of employment. Specific job performance variables were the final academy grade average, supervisors' evaluation ratings, reprimands, commendations, awards, citizen complaints, time losses, sick time usage, reassignments, promotions, and separations. A causal-comparative research design was used to determine if there were significant statistical differences in these job performance variables between police officers with "acceptable" psychological ratings and police officers with "marginal" psychological ratings. The results of multivariate analyses of variance, t-tests, and chi-square procedures as applicable, showed no significant differences between the two groups on any of the job performance variables.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
In this thesis, tool support is addressed for the combined disciplines of Model-based testing and performance testing. Model-based testing (MBT) utilizes abstract behavioral models to automate test generation, thus decreasing time and cost of test creation. MBT is a functional testing technique, thereby focusing on output, behavior, and functionality. Performance testing, however, is non-functional and is concerned with responsiveness and stability under various load conditions. MBPeT (Model-Based Performance evaluation Tool) is one such tool which utilizes probabilistic models, representing dynamic real-world user behavior patterns, to generate synthetic workload against a System Under Test and in turn carry out performance analysis based on key performance indicators (KPI). Developed at Åbo Akademi University, the MBPeT tool is currently comprised of a downloadable command-line based tool as well as a graphical user interface. The goal of this thesis project is two-fold: 1) to extend the existing MBPeT tool by deploying it as a web-based application, thereby removing the requirement of local installation, and 2) to design a user interface for this web application which will add new user interaction paradigms to the existing feature set of the tool. All phases of the MBPeT process will be realized via this single web deployment location including probabilistic model creation, test configurations, test session execution against a SUT with real-time monitoring of user configurable metric, and final test report generation and display. This web application (MBPeT Dashboard) is implemented with the Java programming language on top of the Vaadin framework for rich internet application development. The Vaadin framework handles the complicated web communications processes and front-end technologies, freeing developers to implement the business logic as well as the user interface in pure Java. A number of experiments are run in a case study environment to validate the functionality of the newly developed Dashboard application as well as the scalability of the solution implemented in handling multiple concurrent users. The results support a successful solution with regards to the functional and performance criteria defined, while improvements and optimizations are suggested to increase both of these factors.
Resumo:
This paper intends to explore the relative importance of different Intellectual Capital (IC) dimensions regarding their contribution to the perceived performance of an Higher Education Organization (HEO). It also seeks to discuss the role of IC and performance measurement in these organizations. This is done through a case study conducted in a Portuguese HEO. The particularities of this type of organization turns it into a very interesting empirical ground for IC research. Evidence suggests that although human, structural and relational capital should contribute as a “whole” to the performance of an HEO, human resources have an added importance as source of knowledge. Results also suggest an ‘overlap’ between IC and performance indicators. Despite the validity of the interpretations provided in the context of the case study, generalization to other situations should only be conducted in a theoretically framed manner. This paper contributes to the development of IC research in a specific type of organization: an HEO. This empirical context is still underexplored, namely regarding the relationship between IC and performance. This study provides important managerial implications for HEOs and their members, who are concerned with its performance and competitiveness.
Resumo:
Part 16: Performance Measurement Systems
Resumo:
Mestrado em Gestão e Estratégia Industrial
Resumo:
The purpose of this study was to analyze and compare the technical performance profile of the four-time Costa Rican Senior Basketball League championship team. A total of 142 games was recorded throughout the 2007, 2008 and 2009 seasons. Performance indicators selected were: two and three-point shots (converted, missed, effectiveness rates), free throws (converted, missed, effectiveness rates), points, offensive and defensive rebounds, fouls, turnovers, assists and ball steals. The information was described based on absolute and relative frequency values. Data was compared by season and by playing period based on the following non-parametric techniques: U-test, Friedman test and Chi-square. In all cases, SPSS version 15.0 was used with a significance level of p ≤ 0.05. Results showed a better profile of technical performance in the 2008 season, characterized by better percentages of two-point shots, free throws, fewer turnovers and more ball steals and assists. In relation to the playing period, the team showed a better technical performance profile during the second half of the matches. In general, the effectiveness rate of two-point shots and free throws was above 60% in both playing periods, while the three-point shot percentage ranged between 26.4% and 29.2%. In conclusion, the team showed a similar technical performance profile to that reported in the literature, as well as a clear evidence of the importance of recording and following up on technical performance indicators in basketball.
Resumo:
Due to the rapid changes that governs the Swedish financial sector such as financial deregulations and technological innovations, it is imperative to examine the extent to which the Swedish Financial institutions had performed amid these changes. For this to be accomplish, the work investigates what are the determinants of performance for Swedish Financial Monetary Institutions? Assumptions were derived from theoretical and empirical literatures to investigate the authenticity of this research question using seven explanatory variables. Two models were specified using Returns on Asset (ROA) and Return on Equity (ROE) as the main performance indicators and for the sake of reliability and validity, three different estimators such as Ordinary Least Square (OLS), Generalized Least Square (GLS) and Feasible Generalized Least Square (FGLS) were employed. The Akaike Information Criterion (AIC) was also used to verify which specification explains performance better while performing robustness check of parameter estimates was done by correcting for standard errors. Based on the findings, ROA specification proves to have the lowest Akaike Information Criterion (AIC) and Standard errors compared to ROE specification. Under ROA, two variables; the profit margins and the Interest coverage ratio proves to be statistically significant while under ROE just the interest coverage ratio (ICR) for all the estimators proves significant. The result also shows that the FGLS is the most efficient estimator, then follows the GLS and the last OLS. when corrected for SE robust, the gearing ratio which measures the capital structure becomes significant under ROA and its estimate become positive under ROE robust. Conclusions were drawn that, within the period of study three variables (ICR, profit margins and gearing) shows significant and four variables were insignificant. The overall findings show that the institutions strive to their best to maximize returns but these returns were just normal to cover their costs of operation. Much should be done as per the ASC theory to avoid liquidity and credit risks problems. Again, estimated values of ICR and profit margins shows that a considerable amount of efforts with sound financial policies are required to increase performance by one percentage point. Areas of further research could be how the individual stochastic factors such as the Dupont model, repo rates, inflation, GDP etc. can influence performance.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
The construction industry is dynamic in nature. The concept of project success has remained ambiguously defined in the construction industry. Project success means different things to different people. While some authors consider time, cost and quality as the predominant targets, others suggest that success is something more complex. The aim of this report is to develop a framework for measuring success of construction projects. A range of Key Performance Indicators (KPIs), measured both objectively and subjectively is developed. The identification of KPIs helps set a benchmark for measuring the performance of a construction project and provides significant insights into developing a general and comprehensive base for further research.
Resumo:
This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.
Resumo:
This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.