981 resultados para Mine Hydrology, Groundwater Model, Pit Stability


Relevância:

40.00% 40.00%

Publicador:

Resumo:

For the last two decades most general circulation models (GCMs) have included some kind of surface hydrology submodel. The content of these submodels is becoming increasingly complex and realistic. It is still easy to identify defects in present treatments. Yet, to improve our ability to model the contribution of land hydrology to climate and climate change, we must be concerned not with just the surface hydrology submodel per se, but also with how it works in the overall context of the GCM.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Jinchuan Nickel Mine is the largest underground mine with cut-and-fill mining in China. It is very difficult to be exploited for very low safety stability of rock mass caused by complex geological conditions, developed faults, cracked rock mass and high stress. In this paper, the laws of rock mass movement、mechanics of shaft deformation and destroy were analyzed based on the collection of date, the detailed field engineering investigations, ground movement monitoring by GPS, theoretical analysis and numerical simulation. According to the GPS monitoring result of ground surface movement, there are different ground movement characteristics among the three Mine area of Jinchuan Nickel Mine. In No. 2 Mine area, the ground movement funnel with apparent asymmetry is developing, the influence scope is larger in the up faulted block than in the down faulted block, and the centre of ground movement is moving along the up faulted block direction with increasing depth of mining. Moreover, the tunnels in the corresponding area with the centre of ground movement are damaged seriously. In Longshou Mine area, the ground movement funnel is also developing, but the moving path and the nonlinear characters are more sophisticated because of the long-term effects of open excavating and the effects of underground mining together. In No. 3 Mine area, the underground mining impact on surface is not serious for the time of mining activity is not for long, but the ground movement funnel is also forming now. The underground mining has caused widespread land subsidence in Jinchuan Nickel Mine area, but the phenomena of surface raise appeared in some partial areas of Longshou Mine area and No. 3 Mine area. Analysis proved that the reason for the open pit bottom raise is the slope deformation activation caused by the excavation from open pit into underground mine; and that the raise of surface in No.3 Mine area is caused by the effect of elastic foundation due to underground mining. Although the GPS Monitoring results show the amount of subsidence is increasing constantly, the subsidence rate has a descending tendency with fluctuation in Jinchuan No. 2 Mine area. The subsidence rate curve is a time function and exists an extreme point, the rate increasing before extreme point and decreasing after the extreme point ,but the scale of decreasing rate will be very small after the rate decreasing up to a certain degree, moreover, the characteristics is different among different areas, which have some relation with the distance to the mining section and the dip of the ore body. ArcView is GIS software, which we adopted as a development platform, and made secondary development by its development language “avenue”, through which we developed a ground movement analysis and forecast System for Jinchuan Nickel Mine, which contain three modules : management of ground movement information; analysis and evaluation of ground movement; and ground movement forecast. In the module of evaluation, using the technique of MATLAB6.5 program with VB6.0, the system can achieve the ANN prediction model for GPS monitoring data, data preparation results analysis and model integrated was realized by Avenue programming. Finally, the author analyzed the mechanical of deformation and destroy of the No. 14 shaft, and its repair and artificial-support effectiveness also given detailed demonstration in various aspect. The result showed that the reason for the destroy of No. 14 shaft is underground mining, and being the case, the destroy of the shaft also has its special features, which mainly contains forked stress contour for mining steep ore and fault effect caused by mining activities. The repair and artificial-support played some restrictions on the rock mass movement and deformation, but did not show a strong or marked effect. With the increasing of mining depth and large-scale, the closure rock of the shaft will still deformed, even be destroyed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Xinli mine area of Sanshandao mine is adjacent to the Bohai Sea and its main exploitable ore deposit occurs in the undersea rock mass. The mine is the biggest undersea gold mine of China after production. The mine area faces a latent danger of water bursting, even sudden seawater inrush. There is no mature experience in undersea mining in China so far. The vein ore deposit is located in the lower wall of a fault; its possible groundwater sources mainly include bittern, Quaternary pore water and modern seawater. To ensure the safety of undersea mining, to survey the flooding conditions of the ore deposit using proper measures and study the potential seawater inrush pattern are the key technical problems. With the Xinli mine area as a case study, the engineering geological conditions of the Xinli mine area are surveyed in situ, the regional structural pattern and rock mass framework characteristics are found out, the distribution of the structural planes are modeled by a Monte Carlo method and the connectivity coefficients of rock mass structural planes are calculated. The regional hydro-geological conditions are analyzed and the in-situ hydro-geological investigation and sampling are performed in detail, the hydrochemistry and isotopes testing and groundwater dynamic monitoring are conducted, the recharge, runoff, discharge conditions are specified and the sources of flooding are distinguished. Some indices are selected from the testing results to calculate the proportion of each source in some water discharge points and in the whole water discharge of the Xinli mine area. The temporal and spatial variations of each water source of the whole ore deposit flooding are analyzed. According to the special project conditions in the Xinli mine area, the permeability coefficient tensors of the rock mass in Xinli mine area are calculated based on a fracture geometry measurement method, in terms of the connectivity and a few hydraulic testing results, a modified synthetic permeability coefficient are calculated. The hydro-geological conceptual and mathematical model are established,the water yield of mine is predicted using Visual Modflow code. The spreading law of surrounding rock mass deformation and secondary stress are studied by numerical analysis; the intrinsic mechanism of the faults slip caused by the excavation of ore deposit is analyzed. The results show that the development of surrounding rock mass deformation and secondary stress of vein ore deposit in the lower wall of a fault, is different from that in a thick-big ore deposit. The secondary stress caused by the excavation of vein ore deposit in the lower wall of a fault, is mainly distributed in the upper wall of the fault, one surface subsidence center will occur. The influences of fault on the rock mass movement, secondary stress and hydro-geological structures are analyzed; the secondary stress is blocked by the fault and the tensile stress concentration occurs in the rock mass near the fault, the original water blocking structure is destructed and the permeable structure is reconstructed, the primary structural planes begin to expand and newborn fissures occur, so the permeability of the original permeable structure is greatly enhanced, so the water bursting will probably occur. Based on this knowledge, the possible water inrush pattern and position of the Xinli mine area are predicted. Some computer programs are developed using object-oriented design method under the development platform Visual Studio.Net. These programs include a Monte Carlo simulation procedure, a joint diagrammatizing procedure, a structural planes connectivity coefficient calculating procedure, a permeability tensor calculating procedure, a water chemical formula edit and water source fixture conditions calculating procedure. A new computer mapping algorithm of joint iso-density diagram is raised. Based on the powerful spatial data management and icon functions of Geographic Information System, the pit water discharge dynamic monitoring data management information systems are established with ArcView.