882 resultados para Design case study
Resumo:
Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.
Resumo:
Determining the ecologically relevant spatial scales for predicting species occurrences is an important concept when determining species–environment relationships. Therefore species distribution modelling should consider all ecologically relevant spatial scales. While several recent studies have addressed this problem in artificially fragmented landscapes, few studies have researched relevant ecological scales for organisms that also live in naturally fragmented landscapes. This situation is exemplified by the Australian rock-wallabies’ preference for rugged terrain and we addressed the issue of scale using the threatened brush-tailed rock-wallaby (Petrogale penicillata) in eastern Australia. We surveyed for brush-tailed rock-wallabies at 200 sites in southeast Queensland, collecting potentially influential site level and landscape level variables. We applied classification trees at either scale to capture a hierarchy of relationships between the explanatory variables and brush-tailed rock-wallaby presence/absence. Habitat complexity at the site level and geology at the landscape level were the best predictors of where we observed brush-tailed rock-wallabies. Our study showed that the distribution of the species is affected by both site scale and landscape scale factors, reinforcing the need for a multi-scale approach to understanding the relationship between a species and its environment. We demonstrate that careful design of data collection, using coarse scale spatial datasets and finer scale field data, can provide useful information for identifying the ecologically relevant scales for studying species–environment relationships. Our study highlights the need to determine patterns of environmental influence at multiple scales to conserve specialist species such as the brush-tailed rock-wallaby in naturally fragmented landscapes.
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
Focusing on the role-playing simulation game SCAPE (Sustainability, Community and Planning Education), this paper proposes that potential disparities between game design practice and the meaning-making process of the players need to be addressed in a wider ecology of learning. The cultural setting of the gameplay experience, and also the different levels of engagement of the players, can be seen to pose vital questions, which are in and of themselves objects of inquiry. This paper argues that ethnographic participant-observation, which is a recognized approach in game studies, allows taking the wider ecology of learning into account to explore the various relations that shape the gameplay.
Resumo:
Aim. The paper is a report of a study to demonstrate how the use of schematics can provide procedural clarity and promote rigour in the conduct of case study research. Background. Case study research is a methodologically flexible approach to research design that focuses on a particular case – whether an individual, a collective or a phenomenon of interest. It is known as the 'study of the particular' for its thorough investigation of particular, real-life situations and is gaining increased attention in nursing and social research. However, the methodological flexibility it offers can leave the novice researcher uncertain of suitable procedural steps required to ensure methodological rigour. Method. This article provides a real example of a case study research design that utilizes schematic representation drawn from a doctoral study of the integration of health promotion principles and practices into a palliative care organization. Discussion. The issues discussed are: (1) the definition and application of case study research design; (2) the application of schematics in research; (3) the procedural steps and their contribution to the maintenance of rigour; and (4) the benefits and risks of schematics in case study research. Conclusion. The inclusion of visual representations of design with accompanying explanatory text is recommended in reporting case study research methods.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
Climate change mitigation is driving demand for energy-efficient and environmentally conscious commercial buildings in Australia. In the Australian subtropics, high rainfall, warm weather and humidity present unique challenges and opportunities for the architects tasked with designing eco-sensitive projects. The case of the James Street Market in Brisbane’s Fortitude Valley shows that climate-responsive design is an effective approach for reducing the environmental impact of commercial developments. The James Street Market combines climate-responsiveness, environmentally sensitive design strategies and smart planning to create a more sustainable retail precinct. This paper details the design strategies featured in the James Street Market, the project that kicked off a renaissance in climate-responsive commercial building design in Brisbane.
Resumo:
This paper presents a conceptual framework, informed by Foucault’s work on governmentality, which allows for new kinds of reflection on the practice of legal education. Put simply, this framework suggests that legal education can be understood as a form of government that relies on a specific rationalisation and programming of the activities of legal educators, students, and administrators, and is implemented by harnessing specific techniques and bodies of ‘know-how’. Applying this framework to assessment at three Australian law schools, this paper highlights how assessment practices are rationalised, programmed, and implemented, and points out how this government shapes students’ legal personae. In particular, this analysis focuses on the governmental effects of pedagogical discourses that are dominant within the design and scholarship of legal education. It demonstrates that the development of pedagogically-sound regimes of assessment has contributed to a reformulation of the terrain of government, by providing the conditions under which forms of legal personae may be more effectively shaped, and extending the power relations that achieve this. This analysis provides legal educators with an original way of reflecting on the power effects of teaching the law, and new opportunities for thinking about what is possible in legal education.
Resumo:
Purpose To identify the challenges faced by local government in Indonesia when adopting a Public Asset Management Framework. Design A Case Study in South Sulawesi Provincial Government was used as the approach to achieving the research objective. The case study involved two data collection techniques - interviews and document analysis. Findings The result of the study indicates there are significant challenges that the Indonesian local government need to manage when adopting a public asset management framework. Those challenges are: absence of an institutional and legal framework to support the asset management application; non-profit principle of public assets; multiple jurisdictions involved in the public asset management processes; the complexity of local government objectives; unavailability of data for managing public property; and limited human resources. Research Limitation This research is limited to one case study. It is a preliminary study from larger research that uses multiple case studies. The main research also investigates opportunities for local government by adopting and implementing public asset management. Originality/Value Findings from this study provide useful input for the policy makers, academics and asset management practitioners in Indonesia to establish a public asset management framework resulting in efficient and effective organizations, as well as an increase of public services quality. This study has a potential application for other developing countries.
Building a methodology for context-aware business processes: insights from an exploratory case study
Resumo:
This paper describes the findings derived from an exploratory case study into the business processes at a leading Australian insurance provider. The business processes are frequently subjected to changes and deviations due to contextual events such as weather, financial conditions and others. In this study, we examine how context impacts business processes and how resulting business process changes are enacted. From our analysis, we suggest a methodological framework to guide organisations in the complex challenge of linking changing contextual factors with internal process design.
Resumo:
In this chapter we present a case study set in Beloi, a fishing village located on Ataúro Island, 30 km across the sea from Díli, capital of Timor-Leste (East-Timor). We explore the tension between tourism development, food security and marine conservation in a developing country context. In order to better understand the relationships between the social, ecological and economic issues that arise in tourism planning we use an approach and associated methodology based on storytelling, complexity theory and concept mapping. Through testing scenarios with this methodology we hope to evaluate which trade-offs are acceptable to local people in return for the hoped-for economic boost from increased tourist visitation and associated developments.
Resumo:
On the case study site, using these strategies, the site density achieved was approximately 180 dwellings per hectare. According to ASK consulting engineers‟ acoustic report (in Ecolateral‟s report) the design gives solid consideration to the environmental noise issues associated with the site. The subject structure not only provides significant shielding of transport corridor noise to the suburb, it also minimises the potential for adverse impact on residential amenity within the building itself...