848 resultados para Construction Management
A research framework to investigate the performance of financial incentives in construction projects
Resumo:
Joint ventures can take many forms and can be formed for different reasons, from sharing resources to creating future business opportunities. At the same time, there is increasing interest and discussion of alternative procurement methods, moving away from traditional procurement systems to relational approaches. Business systems and strategies need to be redefined and move from a short-term project to project culture to a more strategic, long-term perspective. Joint ventures of construction organisations, global and local, have become increasingly popular to deliver large-scale infrastructure construction projects. However, successful strategic collaborations require project organisations to formulate a fit between contractual and operational arrangements for each situation. This study reviews the movement from traditional procurement methods towards relational contracting approaches in Queensland, Australia. The study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. This paper reports on initial findings captured from a survey undertaken with construction contracting organisations in Australia, focusing on the supply chain relationships. Contractors’ perceptions of the relationship management process and the engagement of the supply chain are also presented.
Resumo:
Purpose: In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. Design/Methodology/Approach: The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. Handy‟s (1985) view of organisational culture, Allen & Meyer‟s (1990) concepts of organisational commitment and Van de Ven & Ferry‟s (1980) measures of organisational structuring have been combined into a model to test and explain how collaborative mechanisms can affect supply chain sustainability. Findings: It has been shown that the degree of match and mismatch between organisational culture and structure has an impact on staff‟s commitment level. A sustainable supply chain depends on convergence – that is the match between organisational structuring, organisation culture and organisation commitment. Research Limitations/implications: The study is a proof of concept and three case studies have been used to illustrate the nature of the model developed. Further testing and refinement of the model in practice should be the next step in this research. Practical implications: The concept of relationship management needs to filter down to all levels in the supply chain if participants are to retain commitment and buy-in to the relationship. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals‟ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Originality/value: The culture/commitment/structure model developed from three separate strands of management thought has proved to be a powerful tool for analysing collaboration in supply chains and explaining how and why some supply chains are sustainable, and others are not.
Resumo:
Innovation Management (IM) in most knowledge based firms is used on an adhoc basis where senior managers use this term to leverage competitive edge without understanding its true meaning and how its robust application in organisation impacts organisational performance. There have been attempts in the manufacturing industry to harness the innovative potential of the business and apprehend its use as a point of difference to improve financial and non financial outcomes. However further work is required to innovatively extrapolate the lessons learnt to introduce incremental and/or radical innovation to knowledge based firms. An international structural engineering firm has been proactive in exploring and implementing this idea and has forged an alliance with the Queensland University of Technology to start the Innovation Management Program (IMP). The aim was to develop a permanent and sustainable program with which innovation can be woven through the fabric of the organisation. There was an intention to reinforce the firms’ vision and reinvigorate ideas and create new options that help in its realisation. This paper outlines the need for innovation in knowledge based firms and how this consulting engineering firm reacted to this exigency. The development of the Innovation Management Program, its different themes (and associated projects) and how they integrate to form a holistic model is also discussed. The model is designed around the need of providing professional qualification improvement opportunities for staff, setting-up organised, structured & easily accessible knowledge repositories to capture tacit and explicit knowledge and implement efficient project management strategies with a view to enhance client satisfaction. A Delphi type workshop is used to confirm the themes and projects. Some of the individual projects and their expected outcomes are also discussed. A questionnaire and interviews were used to collect data to select appropriate candidates responsible for leading these projects. Following an in-depth analysis of preliminary research results, some recommendations on the selection process will also be presented.
Resumo:
The paper charts the history and development of the Hong Kong Housing Department (HKHD) Performance Assessment Scoring System (PASS) from 1990 to the present day and examines its effect on facilitating change to the quality of construction work of building contractors engaged in the production of public sector housing projects Hong Kong. The paper builds partly on empirical research carried out by the author as part of a doctoral thesis from 2000 to 2005, on experiential knowledge and also on some relevant case studies. The outcomes from this earlier research and validation of PASS based on results derived from the system since the research was originally undertaken are of benefit to practitioners and academics working and studying in the areas of performance assessment and organisational culture and change. The conclusions presented in the paper further underpin the connection established in previous research between strong organisational culture and project and corporate success. Organisational culture was measured using a survey instrument originally developed by Denison and Neale (1994), adapted for the environment of the study, and corporate success was measured by the PASS system mentioned above. The major results of the original study indicate that there is significant linkage between strong organisational cultures and business success and the detailed findings were that, (1) strong organisational culture was positively associated a high level of company effectiveness, (2) a high level of company effectiveness was positively associated with the cultural traits of ‘consistency’, ‘adaptability’ and ‘mission’, and (3) a high level of company effectiveness was positively associated with the combined cultural traits represented by the dimensions of ‘external focus’ and ‘stable culture’. Several opportunities to take forward this research have been identified, including extending the study to other countries and also longitudinally re-evaluating some of the original case studies to ascertain how organisational cultures have changed or further developed in relation to the changing construction climate in Hong Kong.
Resumo:
Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.
Resumo:
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.
Resumo:
In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms sets the stage for an adversarial and potentially destructive approach. There is a need for change in the construction industry—not only to a more cooperative approach to build mutual trust, respect and good faith—but also from a confrontationist and adversarial attitude to a harmonious relationship. It is necessary to change the culture to create a win-win situation. “Strategic Alliances” is one such concept. A strategic alliance is a cooperative arrangement between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. This paper begins with an overview of the Australian building construction industry, then reviews the literature and describes an analysis framework comprising six attributes of strategic alliances—trust, commitment, interdependence, cooperation, communication, and joint problem solving. Given the trend towards greater emphasis on broader contracting firm performance criteria, indicators are proposed as a component of the tender evaluation process for public works.