Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Agile ridesharing aims to utilise the capability of social networks and mobile phones to facilitate people to share vehicles and travel in real time. However the application of social networking technologies in local communities to address issues of personal transport faces significant design challenges. In this paper we describe an iterative design-based approach to exploring this problem and discuss findings from the use of an early prototype. The findings focus upon interaction, privacy and profiling. Our early results suggest that explicitly entering information such as ride data and personal profile data into formal fields for explicit computation of matches, as is done in many systems, may not be the best strategy. It might be preferable to support informal communication and negotiation with text search techniques.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A Simulink Matlab control system of a heavy vehicle suspension has been developed. The aim of the exercise presented in this paper was to develop a Simulink Matlab control system of a heavy vehicle suspension. The objective facilitated by this outcome was the use of a working model of a heavy vehicle (HV) suspension that could be used for future research. A working computer model is easier and cheaper to re-configure than a HV axle group installed on a truck; it presents less risk should something go wrong and allows more scope for variation and sensitivity analysis before embarking on further "real-world" testing. Empirical data recorded as the input and output signals of a heavy vehicle (HV) suspension were used to develop the parameters for computer simulation of a linear time invariant system described by a second-order differential equation of the form: (i.e. a "2nd-order" system). Using the empirical data as an input to the computer model allowed validation of its output compared with the empirical data. The errors ranged from less than 1% to approximately 3% for any parameter, when comparing like-for-like inputs and outputs. The model is presented along with the results of the validation. This model will be used in future research in the QUT/Main Roads project Heavy vehicle suspensions – testing and analysis, particularly so for a theoretical model of a multi-axle HV suspension with varying values of dynamic load sharing. Allowance will need to be made for the errors noted when using the computer models in this future work.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Projects funded by the Australian National Data Service(ANDS). The specific projects that were funded included: a) Greenhouse Gas Emissions Project (N2O) with Prof. Peter Grace from QUT’s Institute of Sustainable Resources. b) Q150 Project for the management of multimedia data collected at Festival events with Prof. Phil Graham from QUT’s Institute of Creative Industries. c) Bio-diversity environmental sensing with Prof. Paul Roe from the QUT Microsoft eResearch Centre. For the purposes of these projects the Eclipse Rich Client Platform (Eclipse RCP) was chosen as an appropriate software development framework within which to develop the respective software. This poster will present a brief overview of the requirements of the projects, an overview of the experiences of the project team in using Eclipse RCP, report on the advantages and disadvantages of using Eclipse and it’s perspective on Eclipse as an integrated tool for supporting future data management requirements.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper gives an overview of an ongoing project endeavouring to advance theory-based production and project management, and the rationale for this approach is briefly justified. The status of the theoretical foundation of production management, project management and allied disciplines is discussed, with emphasis on metaphysical grounding of theories, as well as the nature of the heuristic solution method commonly used in these disciplines. Then, on-going work related to different aspects of production and project management is reviewed from both theoretical and practical orientation. Next, information systems agile project management is explored with a view to its re-use in generic project management. In production management, the consequences and implementation of a new, wider theoretical basis are analyzed. The theoretical implications and negative symptoms of the peculiarities of the construction industry for supply chains and supply chain management in construction are observed. Theoretical paths for improvements of inter-organisational relationships in construction which are fundamental for improvement of construction supply chains are described. To conclude, the observations made in this paper vis-à-vis production, project and supply chain management are related again to the theoretical basis of this paper, and finally directions for theory development and future research are given and discussed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – This paper seeks to analyse the process of packaged software selection in a small organization, focussing particularly on the role of IT consultants as intermediaries in the process. Design/methodology/approach – This is based upon a longitudinal, qualitative field study concerning the adoption of a customer relationship management package in an SME management consultancy. Findings – The authors illustrate how the process of “salesmanship”, an activity directed by the vendor/consultant and focussed on the interests of senior management, marginalises user needs and ultimately secures the procurement of the software package. Research limitations/implications – Despite the best intentions the authors lose something of the rich detail of the lived experience of technology in presenting the case study as a linear narrative. Specifically, the authors have been unable to do justice to the complexity of the multifarious ways in which individual perceptions of the project were influenced and shaped by the opinions of others. Practical implications – Practitioners, particularly those from within SMEs, should be made aware of the ways in which external parties may have a vested interest in steering projects in a particular direction, which may not necessarily align with their own interests. Originality/value – This study highlights in detail the role of consultants and vendors in software selection processes, an area which has received minimal attention to date. Prior work in this area emphasises the necessary conditions for, and positive outcomes of, appointing external parties in an SME context, with only limited attention being paid to the potential problems such engagements may bring.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Information sharing in distance collaboration: A software engineering perspective, QueenslandFactors in software engineering workgroups such as geographical dispersion and background discipline can be conceptually characterized as "distances", and they are obstructive to team collaboration and information sharing. This thesis focuses on information sharing across multidimensional distances and develops an information sharing distance model, with six core dimensions: geography, time zone, organization, multi-discipline, heterogeneous roles, and varying project tenure. The research suggests that the effectiveness of workgroups may be improved through mindful conducts of information sharing, especially proactive consideration of, and explicit adjustment for, the distances of the recipient when sharing information.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Reporta resultados da aplicação de princípios da gestão do conhecimento na condução de um projeto de definição, modelagem e implementação de processo de desenvolvimento de software, no contexto de uma organização do setor público. O processo resultante, denominado SIGA-ME, se mostrou capaz de harmonizar práticas variadas, integrar processos técnicos de TI e formalizar papeis e responsabilidades dos participantes envolvidos. Estão relatadas neste trabalho as principais dificuldades encontradas e lições aprendidas registradas ao longo do trabalho, que adotou como estratégia o levantamento dos pontos de interesse das áreas envolvidas, a validação de práticas em projetos reais, o desenho do processo através da notação BPMN e a utilização do MediaWiki como ferramenta de comunicação, colaboração e compartilhamento de conhecimento.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Atualmente não é possível pensar em gestão de projetos sem uma boa ferramenta apoiada em Tecnologia da Informação. Este trabalho estudou o processo de implantação e personalização do Microsoft Project Server na Câmara dos Deputados com o objetivo de avaliar se essa implantação se deu de maneira adequada segundo as melhores práticas de gestão de projetos, além de levantar as principais lições aprendidas no processo. Para tanto foi realizada uma pesquisa documental, em que, na primeira parte fez-se um apanhado em nível teórico das melhores práticas de gestão de projetos, notadamente PMBOK do PMI e a consulta a autores relevantes no contexto da gestão de projetos e da aprendizagem organizacional. Em um segundo momento foram pesquisados documentos relacionados ao processo de implantação como o edital de licitação, atas de reunião, atos normativos, dentre outros. Dos dados levantados foram identificadas falhas por parte da Câmara dos Deputados tais como elevado número de exigências de personalizações no ambiente e conhecimento limitado, a priori, da ferramenta, de suas capacidades e limitações. Por parte da contratada, observou-se falhas como desorganização, planejamento ruim, descumprimento de prazos, pendências, grandes atrasos e mudanças na equipe técnica do projeto. Pela análise dessas falhas, levantaram-se diversas lições aprendidas no processo. Por fim, concluiu-se que o processo de implantação do Microsoft Project Server na Câmara dos Deputados foi parcialmente adequado, pois apesar de ao final estar implantado de acordo com o escopo requerido, o processo como um todo apresentou muitas falhas.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

El presente proyecto consiste en el análisis y búsqueda de soluciones para el control de producción de la unidad de rodajes de la compañía CAF S.A. Para ello, se ha tenido que analizar procesos de producción, capturar requerimientos, desarrollar unas herramientas de control de producción temporales y elaborar una especificación de requisitos. Sin olvidar la gestión e interlocución con proveedores. Estas líneas de trabajo se encuentran descritas en esta memoria, junto con análisis de resultados, conclusiones y unas líneas futuras donde se seguirá trabajando.