963 resultados para Urban project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a brief analysis of Seoul trans-youth’s search for identity through urban social networking, arguing that technological, socio-cultural and environmental (urban) contexts frame how mobility and ubiquity are (re)created in Seoul. The paper is empirically based on fieldwork conducted in Seoul, South Korea, from 2007 to 2008 as part of a research project on the mobile play culture of Seoul trans-youth(a term that will be explained in detail in the following section). Shared Visual Ethnography (SVE) was used as the research method which involved sharing of visual ethnographic data that were created by the participants. More specifically, the participants were asked to take photos, which were then shared and discussed with other participants and the researcher on the photo-sharing service Flickr. The research also involved a questionnaire and daily activity diaries, as well as interviews. A total of 44 Korean transyouths – including 23 females and 21 males – participated in interviews and photo-sharing. The paper draws specifically on the qualitative data from individual and/or group interviews, the total duration of which was 2–2.5 hours for each participant.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

SCAPE is an interactive simulation that allows teachers and students to experiment with sustainable urban design. The project is based on the Kelvin Grove Urban Village, Brisbane. Groups of students role play as political, retail, elderly, student, council and builder characters to negotiate on game decisions around land use, density, housing types and transport in order to design a sustainable urban community. As they do so, the 3D simulation reacts in real time to illustrate what the village would look like as well as provide statistical information about the community they are creating. SCAPE brings together education, urban professional and technology expertise, helping it achieve educational outcomes, reflect real-world scenarios and include sophisticated logic and decision making processes and effects.---------- The research methodology was primarily practice led underpinned by action research methods resulting in innovative approaches and techniques in adapting digital games and simulation technologies to create dynamic and engaging experiences in pedagogical contexts. It also illustrates the possibilities for urban designers to engage a variety of communities in the processes, complexities and possibilities of urban development and sustainability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project is the result of a collaborative design process involving QUT School of Design, and AREN Consulting and ZIAD (Zheijiang Provincial Institute of Architectural Design and Research). This major urban initiative explores new standards for multi-function urban centres. The sophisticated integration of transit interchange with retail, commercial and residential functions provides a dramatic mix of social activities. The large site is formed into a raised and terraced urban garden, with the transit centre and retail shopping precinct housed below this landscaped roof. Towering above this ‘hill’ are five building blocks housing the commercial and residential accommodations. These environmentally low-impact buildings are topped with a high-tech greenhouse roof or photovoltaic cells.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many studies in the area of project management and social networks have identified the significance of project knowledge transfer within and between projects. However, only few studies have examined the intra- and inter-projects knowledge transfer activities. Knowledge in projects can be transferred via face-to-face interactions on the one hand, and via IT-based tools on the other. Although companies have allocated many resources to the IT tools, it has been found that they are not always effectively utilised, and people prefer to look for knowledge using social face-to-face interactions. This paper explores how to effectively leverage two alternative knowledge transfer techniques, face-to-face and IT-based tools to facilitate knowledge transfer and enhance knowledge creation for intra- and inter-project knowledge transfer. The paper extends the previous research on the relationships between and within teams by examining the project’s external and internal knowledge networks concurrently. Social network qualitative analysis, using a case study within a small-medium enterprise, was used to examine the knowledge transfer activities within and between projects, and to investigate knowledge transfer techniques. This paper demonstrates the significance of overlapping employees working simultaneously on two or more projects and their impact on facilitating knowledge transfer between projects within a small/medium organisation. This research is also crucial to gaining better understanding of different knowledge transfer techniques used for intra- and inter-project knowledge exchange. The research provides recommendations on how to achieve better knowledge transfer within and between projects in order to fully utilise a project’s knowledge and achieve better project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project is the result of a collaborative design process involving QUT School of Design, and AREN Consulting and ZIAD (Zheijiang Provincial Institute of Architectural Design and Research). This project is the submission prepared by the above partnership for an invited international design competition, promoted by Hangzhou City, China. ---------- This major urban design and architecture project is for a large transport oriented development on the new Hangzhou Subway system. The development, covering several city blocks, includes the provision of residential, retail, education, commercial, and transport infrastructure; integrated with rail, bus and ferry systems. ---------- The design strategies are based on the development or artificial land forms; the cutting of new canals, raising of the ground plane, and metaphoric reference to the Yellow Mountains (explored in the detail of the central ‘ridge’ of built form). Further to this, the project explores the integration of sustainable technologies and philosophies with large scale building projects in a subtropical context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Knowledge is a powerful organisational asset yet intangible and hard to manage, particularly in a project environment where there is a tendency to repeat the same mistakes rather than learn from previous project lessons. A lack of effective knowledge sharing across projects causes reinventions that are costly, and time consuming. Research on knowledge transfer has focused mainly on functional organisations and only recent attention has been directed towards knowledge transfer in projects. Furthermore, there is little evidence in the literature which examines trust in the knowledge transfer processes. This paper studies how the three types of trust - ability, benevolence, and integrity impact on knowledge transfer from the inter-project perspective. Three case studies investigated the matter. A detailed description of the work undertaken and an analysis of interviews with project professionals from large project-based organisations are presented in this paper. The key finding identifies the positive impact of ability trust on knowledge transfer. However, it was also found that perception on both integrity and benevolence varied across organisations suggesting that there can be a possible impact of organisational factors on the way trust is perceived in inter-project knowledge transfer. The paper concludes with a discussion and recommendations regarding the development of trust for inter-project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Subtropical Urban Communities Project Urban design and residential buildings The Centre for Subtropical Design has researched design concepts for livable subtropical neighbourhoods characterised by higher-density, mixed-use, family oriented housing by conducting a design charrette and analysing the proposed designs to evaluate how well these typologies might support economic, environmental and social sustainability. http://www.subtropicaldesign.org.au/index.php?option=com_content&task=view&id=125&Itemid=163 The QUT Team produced designs (Case Study 3) within the research framework of the design charrette.