947 resultados para Project planning
Resumo:
Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on `what is strategic` is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval. (c) 2008 Elsevier Inc. All rights reserved.
Resumo:
Objective of this master’s thesis is to create an investment calculation model, which makes it possible to determine if the ski resort business can be profitable. The ultimate goal is to create a description with the help of theoretical knowledge, interviews and investment calculation model, how the operation of ski resort is possible to be profitable and what are the critical success factors for achieving this goal. Thesis is carried out as qualitative research, which is supported by the necessary constructive information utilizing calculations. The client company has provided valuable insights and material for this thesis. Theoretical report examines the steps of developing a business plan, investment components and methods as well as sensitivity analysis. The theoretical part is based on the articles, textbooks, interviews and researches. The empirical part of the thesis is assembled by benchmarking other same size Finnish ski resorts, conducting interviews and using investment calculation model. The empirical part provides comprehensive information about ski resort industry, the future of the project, the business plan and the profitability calculations. As the result of this thesis the investment calculation model, which makes it possible to simulate different scenarios for ski resort project, was formed. The model was used to create a picture in which kind of scenario the ski resort business would be profitable and what are the critical success factors in achieving this aim.
Resumo:
Second in a two part set of lectures on Agile Envisioning. The lectures describe the process of starting up a project. 1) creating a shared understanding amongst the team and customers using Stakeholder Analysis, Personas and User stories 2) Sprint planning and using a burndown chart 3) Risk assessment
Resumo:
Urban metabolism considers a city as a system with flows of energy and material between it and the environment. Recent advances in bio-physical sciences provide methods and models to estimate local scale energy, water, carbon and pollutant fluxes. However, good communication is required to provide this new knowledge and its implications to endusers (such as urban planners, architects and engineers). The FP7 project BRIDGE (sustainaBle uRban plannIng Decision support accountinG for urban mEtabolism) aimed to address this gap by illustrating the advantages of considering these issues in urban planning. The BRIDGE Decision Support System (DSS) aids the evaluation of the sustainability of urban planning interventions. The Multi Criteria Analysis approach adopted provides a method to cope with the complexity of urban metabolism. In consultation with targeted end-users, objectives were defined in relation to the interactions between the environmental elements (fluxes of energy, water, carbon and pollutants) and socioeconomic components (investment costs, housing, employment, etc.) of urban sustainability. The tool was tested in five case study cities: Helsinki, Athens, London, Florence and Gliwice; and sub-models were evaluated using flux data selected. This overview of the BRIDGE project covers the methods and tools used to measure and model the physical flows, the selected set of sustainability indicators, the methodological framework for evaluating urban planning alternatives and the resulting DSS prototype.
Resumo:
Includes bibliography
Resumo:
Description of project activities and accountancy report.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.