Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the last decade, a gradual but significant shift in education has taken place. Schools have transformed from hermetically sealed, impermeable bureaucracies to dynamic and flexible organisations characterised by openness to local communities and connectedness to global issues and cultures. They are also more responsive to the aspirations of students and parents. A central feature of what Christian Maroy (2009) has described as the post bureaucratic era of education has been the relationships formed between schools and other organisations through formalised partnerships. Partnerships have been a significant feature of schooling in Queensland since the 1980s when schools developed Vocational Education Programs (VET) providing alternative pathways from schooling to post school training or employment. However, partnerships that have emerged in recent times have been more structured in their organisation and more targeted in terms of the outcomes they aim to achieve. Examples here have included Queensland’s District Youth Achievement plans that linked schools, business, industry bodies, training organisations and community groups to improve transition outcomes, particularly for young people at risk in their transitions from school to post-school life.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a regional commentary (hereafter ‘the commentary’) on the three Australian projects of the Teasdale-Corti Global Health Research Partnership Program. The three Australian projects are: Victorian Aboriginal Health Service Ltd (VAHS), Melbourne, Victoria—Forty Years of Comprehensive Primary Health Care; Central Australian Aboriginal Congress Inc. (Congress), Alice Springs, Northern Territory—Ingkintja, Male Health Program; and Urapuntja Health Service (UHS), Utopia, Northern Territory—Outstation Health Care. It highlights common themes and lessons in respect to the Revitalising Health for All project in the context of Aboriginal and Torres Strait Islander health in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project-based learning (PBL) is widely used in engineering courses. The closer to real-life the project, the greater the relevance and depth of learning experienced by students. Formula Society of Automotive Engineering (FSAE) is a fine example of a team-based project modelled on real-life problems whereby each student team designs and builds a small race car for competitive evaluation. Queensland University of Technology (QUT) has participated in FSAE-Australia since 2004. Based on the success of the project, QUT has gone the additional step of introducing a motor-racing specialization (second major) to complement its mechanical engineering degree. In this paper, the benefits of teaching motor-racing engineering through real-life projects are presented together with a discussion of the challenges faced and how they have been addressed. In order to validate the authors' observations on the teaching approaches used, student feedback was solicited through QUT's online learning experience survey (LEX), as well as a customized paper-based survey. The results of the surveys are analysed and discussed in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.