889 resultados para Mixed integer programming feasible operating region
Resumo:
Electronic exchanges are double-sided marketplaces that allow multiple buyers to trade with multiple sellers, with aggregation of demand and supply across the bids to maximize the revenue in the market. Two important issues in the design of exchanges are (1) trade determination (determining the number of goods traded between any buyer-seller pair) and (2) pricing. In this paper we address the trade determination issue for one-shot, multi-attribute exchanges that trade multiple units of the same good. The bids are configurable with separable additive price functions over the attributes and each function is continuous and piecewise linear. We model trade determination as mixed integer programming problems for different possible bid structures and show that even in two-attribute exchanges, trade determination is NP-hard for certain bid structures. We also make some observations on the pricing issues that are closely related to the mixed integer formulations.
Resumo:
针对一类存在并行和可重入腔的复杂单臂机器人集束型装备的调度问题,通过对加工腔、机器人、并行和可重入腔中的各个机器人活动进行分析,推导出对应的时序约束关系,建立了问题的混合整数规划模型,从而获得最优的机器人动作序列和最小周期.调度实例表明了模型的可行性和高效性。
Resumo:
Traditional internal combustion engine vehicles are a major contributor to global greenhouse gas emissions and other air pollutants, such as particulate matter and nitrogen oxides. If the tail pipe point emissions could be managed centrally without reducing the commercial and personal user functionalities, then one of the most attractive solutions for achieving a significant reduction of emissions in the transport sector would be the mass deployment of electric vehicles. Though electric vehicle sales are still hindered by battery performance, cost and a few other technological bottlenecks, focused commercialisation and support from government policies are encouraging large scale electric vehicle adoptions. The mass proliferation of plug-in electric vehicles is likely to bring a significant additional electric load onto the grid creating a highly complex operational problem for power system operators. Electric vehicle batteries also have the ability to act as energy storage points on the distribution system. This double charge and storage impact of many uncontrollable small kW loads, as consumers will want maximum flexibility, on a distribution system which was originally not designed for such operations has the potential to be detrimental to grid balancing. Intelligent scheduling methods if established correctly could smoothly integrate electric vehicles onto the grid. Intelligent scheduling methods will help to avoid cycling of large combustion plants, using expensive fossil fuel peaking plant, match renewable generation to electric vehicle charging and not overload the distribution system causing a reduction in power quality. In this paper, a state-of-the-art review of scheduling methods to integrate plug-in electric vehicles are reviewed, examined and categorised based on their computational techniques. Thus, in addition to various existing approaches covering analytical scheduling, conventional optimisation methods (e.g. linear, non-linear mixed integer programming and dynamic programming), and game theory, meta-heuristic algorithms including genetic algorithm and particle swarm optimisation, are all comprehensively surveyed, offering a systematic reference for grid scheduling considering intelligent electric vehicle integration.
Resumo:
A presente tese resulta de um trabalho de investigação cujo objectivo se centrou no problema de localização-distribuição (PLD) que pretende abordar, de forma integrada, duas actividades logísticas intimamente relacionadas: a localização de equipamentos e a distribuição de produtos. O PLD, nomeadamente a sua modelação matemática, tem sido estudado na literatura, dando origem a diversas aproximações que resultam de diferentes cenários reais. Importa portanto agrupar as diferentes variantes por forma a facilitar e potenciar a sua investigação. Após fazer uma revisão e propor uma taxonomia dos modelos de localização-distribuição, este trabalho foca-se na resolução de alguns modelos considerados como mais representativos. É feita assim a análise de dois dos PLDs mais básicos (os problema capacitados com procura nos nós e nos arcos), sendo apresentadas, para ambos, propostas de resolução. Posteriormente, é abordada a localização-distribuição de serviços semiobnóxios. Este tipo de serviços, ainda que seja necessário e indispensável para o público em geral, dada a sua natureza, exerce um efeito desagradável sobre as comunidades contíguas. Assim, aos critérios tipicamente utilizados na tomada de decisão sobre a localização destes serviços (habitualmente a minimização de custo) é necessário adicionar preocupações que reflectem a manutenção da qualidade de vida das regiões que sofrem o impacto do resultado da referida decisão. A abordagem da localização-distribuição de serviços semiobnóxios requer portanto uma análise multi-objectivo. Esta análise pode ser feita com recurso a dois métodos distintos: não interactivos e interactivos. Ambos são abordados nesta tese, com novas propostas, sendo o método interactivo proposto aplicável a outros problemas de programação inteira mista multi-objectivo. Por último, é desenvolvida uma ferramenta de apoio à decisão para os problemas abordados nesta tese, sendo apresentada a metodologia adoptada e as suas principais funcionalidades. A ferramenta desenvolvida tem grandes preocupações com a interface de utilizador, visto ser direccionada para decisores que tipicamente não têm conhecimentos sobre os modelos matemáticos subjacentes a este tipo de problemas.
Resumo:
This paper presents a complete, quadratic programming formulation of the standard thermal unit commitment problem in power generation planning, together with a novel iterative optimisation algorithm for its solution. The algorithm, based on a mixed-integer formulation of the problem, considers piecewise linear approximations of the quadratic fuel cost function that are dynamically updated in an iterative way, converging to the optimum; this avoids the requirement of resorting to quadratic programming, making the solution process much quicker. From extensive computational tests on a broad set of benchmark instances of this problem, the algorithm was found to be flexible and capable of easily incorporating different problem constraints. Indeed, it is able to tackle ramp constraints, which although very important in practice were rarely considered in previous publications. Most importantly, optimal solutions were obtained for several well-known benchmark instances, including instances of practical relevance, that are not yet known to have been solved to optimality. Computational experiments and their results showed that the method proposed is both simple and extremely effective.
Resumo:
In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.
Resumo:
L’industrie forestière est un secteur qui, même s’il est en déclin, se trouve au cœur du débat sur la mondialisation et le développement durable. Pour de nombreux pays tels que le Canada, la Suède et le Chili, les objectifs sont de maintenir un secteur florissant sans nuire à l’environnement et en réalisant le caractère fini des ressources. Il devient important d’être compétitif et d’exploiter de manière efficace les territoires forestiers, de la récolte jusqu’à la fabrication des produits aux usines, en passant par le transport, dont les coûts augmentent rapidement. L’objectif de ce mémoire est de développer un modèle de planification tactique/opérationnelle qui permet d’ordonnancer les activités pour une année de récolte de façon à satisfaire les demandes des usines, sans perdre de vue le transport des quantités récoltées et la gestion des inventaires en usine. L’année se divise en 26 périodes de deux semaines. Nous cherchons à obtenir les horaires et l’affectation des équipes de récolte aux blocs de coupe pour une année. Le modèle mathématique développé est un problème linéaire mixte en nombres entiers dont la structure est basée sur chaque étape de la chaine d’approvisionnement forestière. Nous choisissons de le résoudre par une méthode exacte, le branch-and-bound. Nous avons pu évaluer combien la résolution directe de notre problème de planification était difficile pour les instances avec un grand nombre de périodes. Cependant l’approche des horizons roulants s’est avérée fructueuse. Grâce à elle en une journée, il est possible de planifier les activités de récolte des blocs pour l’année entière (26 périodes).
Resumo:
De nombreux problèmes en transport et en logistique peuvent être formulés comme des modèles de conception de réseau. Ils requièrent généralement de transporter des produits, des passagers ou encore des données dans un réseau afin de satisfaire une certaine demande tout en minimisant les coûts. Dans ce mémoire, nous nous intéressons au problème de conception de réseau avec coûts fixes et capacités. Ce problème consiste à ouvrir un sous-ensemble des liens dans un réseau afin de satisfaire la demande, tout en respectant les contraintes de capacités sur les liens. L'objectif est de minimiser les coûts fixes associés à l'ouverture des liens et les coûts de transport des produits. Nous présentons une méthode exacte pour résoudre ce problème basée sur des techniques utilisées en programmation linéaire en nombres entiers. Notre méthode est une variante de l'algorithme de branch-and-bound, appelée branch-and-price-and-cut, dans laquelle nous exploitons à la fois la génération de colonnes et de coupes pour la résolution d'instances de grande taille, en particulier, celles ayant un grand nombre de produits. En nous comparant à CPLEX, actuellement l'un des meilleurs logiciels d'optimisation mathématique, notre méthode est compétitive sur les instances de taille moyenne et supérieure sur les instances de grande taille ayant un grand nombre de produits, et ce, même si elle n'utilise qu'un seul type d'inégalités valides.
Resumo:
Foundries can be found all over Brazil and they are very important to its economy. In 2008, a mixed integer-programming model for small market-driven foundries was published, attempting to minimize delivery delays. We undertook a study of that model. Here, we present a new approach based on the decomposition of the problem into two sub-problems: production planning of alloys and production planning of items. Both sub-problems are solved using a Lagrangian heuristic based on transferences. An important aspect of the proposed heuristic is its ability to take into account a secondary practice objective solution: the furnace waste. Computational tests show that the approach proposed here is able to generate good quality solutions that outperform prior results. Journal of the Operational Research Society (2010) 61, 108-114. doi:10.1057/jors.2008.151
Resumo:
Industrial production processes involving both lot-sizing and cutting stock problems are common in many industrial settings. However, they are usually treated in a separate way, which could lead to costly production plans. In this paper, a coupled mathematical model is formulated and a heuristic method based on Lagrangian relaxation is proposed. Computational results prove its effectiveness. (C) 2009 Elsevier B.V. All rights reserved.
Resumo:
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (I the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry`s own practice. (c) 2006 Elsevier Ltd. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)