Train scheduling and rolling stock assignment in high speed trains
Data(s) |
19/12/2014
|
---|---|
Resumo |
The Train Timetabling Problem (TTP) has been widely studied for freight and passenger rail systems. A lesser effort has been devoted to the study of high-speed rail systems. A modeling issue that has to be addressed is to model departure time choice of passengers on railway services. Passengers who use these systems attempt to travel at predetermined hours due to their daily life necessities (e.g., commuter trips). We incorporate all these features into TTP focusing on high-speed railway systems. We propose a Rail Scheduling and Rolling Stock (RSch-RS) model for timetable planning of high-speed railway systems. This model is composed of two essential elements: i) an infrastructure model for representing the railway network: it includes capacity constraints of the rail network and the Rolling-Stock constraints; and ii) a demand model that defines how the passengers choose the departure time. The resulting model is a mixed-integer programming model which objective function attempts to maximize the profit for the rail operator |
Formato |
application/pdf |
Identificador | |
Idioma(s) |
eng |
Publicador |
E.T.S. de Ingeniería Aeronáutica y del Espacio (UPM) |
Relação |
http://oa.upm.es/40224/1/INVE_MEM_2014_217905.pdf http://www.sciencedirect.com/science/article/pii/S1877042814062168 TRA2011-27791-C03-01 info:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1016/j.sbspro.2014.12.115 |
Direitos |
http://creativecommons.org/licenses/by-nc-nd/3.0/es/ info:eu-repo/semantics/openAccess |
Fonte |
Procedia Social and Behavioral Sciences, ISSN 1877-0428, 2014-12-19, Vol. 160 |
Palavras-Chave | #Aeronáutica #Ingeniería Civil y de la Construcción |
Tipo |
info:eu-repo/semantics/article Artículo PeerReviewed |