362 resultados para Contractor


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Major construction projects undertaken on university campuses are an ideal opportunity to connect learners in related disciplines to the real thing. How often do universities take that opportunity, make the connection and value add to projects being carried out? Discussion with students and academic staff will consistently generate enthusiasm for creating learning activities and resources related to projects. Some typical disciplines are project management, all fields of engineering, architecture, interior design and information technology. Some other areas that may not at first seem obvious are business, marketing, communication and public relations. The authors will provide a case study based on the new Queensland University of Technology (QUT) Science and Engineering Centre project of how the partnership between QUT and Leighton Contractors, the managing contractor, has delivered excellent learning opportunities through the design and construction phases of the Science and Engineering Centre project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study resulted in the development of a decision making tool for engineering consultancies looking to diversify into new markets. It reviewed existing decision tools used by contractor's entering new markets to develop a bespoke tool for engineering consultants to establish more rigor around the decision making process rather than rely purely on the intuition of company executives. The tool can be used for developing medium and long term company strategies or as a quick and efficient way to assess the viability of new market opportunities when they arise. A combination of Delphi and Analytical Hierarchy Process was selected as the basis of the decision theory.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The detached housing scheme is a unique and exclusive segment of the residential property market in Malaysia. Generally, the product is expensive and for many Malaysians who can afford them, owning a detached house is a once in a lifetime opportunity. In spite of this, most of the owners failed to fully comprehend the specific need of this type of housing scheme, increasing the risk of it being a problematic undertaking. Unlike other types of pre-designed "mass housing" schemes, the detached housing scheme may be built specifically to cater the needs and demands of its owner. Therefore, owner participation during critical development stages is vital to guarantee the success of the development as a whole. In addition, due to its unique design the house would have to individually comply with the requirements and regulations of relevant authorities. Failure by the owner to recognise this will result in delays, penalties, disputes and ultimately cost overruns. These circumstances highlight the need for a research to guide the owner through participation during the critical development stages of a detached house. Therefore, this research aims to develop a guideline to improve owner participation for a successful detached house development in Malaysia. To achieve the aim, questionnaire surveys and semi-structured interviews were employed to collect the detached house owners' and consultants' & contractors' responses through their experiences in developing detached houses in Malaysia. Stratified and random sampling were utilised to gather information from both parties to represent Malaysian detached house participants. The questionnaire responses were analysed through the application of quantitative analysis such as descriptive analysis, factor analysis and structural equation modelling which were substantiated through qualitative analysis procedure such as content analysis. This research had identified that in order to produce a successful outcome detached house owners are required to participate during critical stages of the development. In the planning stage, the owner needs to provide proper specific input to the consultant regarding his/her expectations of the cost for the entire development, its detailed specification and general idea of the internal and external design of the detached house and its compound. In the contracting stage, the owner must make the appropriate choice of selecting the right contractor for the job. This decision may be taken after recommendations from the consultants or from the owner's personal contacts or experiences but it is not recommended for the owner to select a contractor primarily on the basis of the lowest bid. In the completion stage, the owner may need to attend a number of important site meetings to ensure that the progress of the works is according to what had been planned and the completion date is achievable. By having the owners undertake an active role during critical stages of the development, not only the quality and delivery of the development improved but also there is an increase in satisfaction to the owners themselves.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Australia, the building and construction industry is taking significant steps towards the enhancement of environmental performance of the built environment. A large number of world class sustainable buildings have been constructed in recent years, offering researchers and practitioners alike a good opportunity to identify the best practices and real life experiences in delivering high performance buildings. A case study of ONE ONE ONE Eagle Street, a 6 Star Green Star office building in Brisbane, was conducted to investigate the best practice in achieving this “world leader” green office building. The study identified a number of key factors relating to project delivery system, contractor selection method, client’s early commitment, design integration, communication as major contributors to the successful delivery of this project. Additionally, key environmentally sustainable features and their cost implications were explored through in-depth interviews with the main contractor. The findings of this study will shed lights on the successful delivery of sustainable buildings and provide practical implications for different stakeholders.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The interaction between head contractor and subcontractor in modern construction often contributes to the degree of success or failure of any large-scale construction project. In this paper, previous research on the relationship and interaction between head contractor and subcontractor is examined in order to establish how these relationships will affect the overall performance of a project. Based on the review, research questions on how to best manage the interaction and relationship between these two vital project participants are proposed and future research direction discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A crucial task in contractor prequalification is to establish a set of decision criteria through which the capabilities of contractors are measured and judged. However, in the UK, there are no nationwide standards or guidelines governing the selection of decision criteria for contractor prequalification. The decision criteria are usually established by individual clients on an ad hoc basis. This paper investigates the divergence of decision criteria used by different client and consultant organisations in contractor prequalification through a large empirical survey conducted in the UK. The results indicate that there are significant differences in the selection and use of decision criteria for prequalification.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design-build (DB) system is regarded as an effective means of delivering sustainable buildings. Specifying clear sustainability requirements to potential contractors is of great importance to project success. This research investigates the current state-of-the-practice for the definition of sustainability requirements within the public sectors of the U.S. construction market using a robust content analysis of 49 DB requests for proposals (RFPs). The results reveal that owners predominantly communicate their desired level of sustainability through the LEED certification system. The sustainability requirement has become an important dimension for the best-value evaluation of DB contractors with specific importance weightings of up to 25%. Additionally, owners of larger projects and who provide less design information in their RFPs generally allocate significantly higher importance weightings to sustainability requirements. The primary knowledge contribution of this study to the construction industry is the reveal of current trend in DB procurement for green projects. The findings also provide owners, architects, engineers, and constructors with an effective means of communicating sustainability objectives in solicitation documents.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Safety has long been a problem in the construction industry. Repair, maintenance, alteration and addition (RMAA) sector has emerged to play an important role in the construction industry. It accounted for 53% of the total construction market in Hong Kong in 2007. Safety performance of the RMAA words has been alarming. Statistics indicate that the percentage of fatal industrial accidents arising from RMAA work in Hong Kong was over 56% in 2006 while the remaining 44% was from new works. Effective safety measures to address the safety problems and improve safety performance of the RMAA sector are urgently needed. Unsafe behaviour has been attributed to one of the major causes of accidents. Traditional cost-benefit analysis of workers' safety behaviour seems to be inadequate. This paper proposes to adopt a game theoretical approach to analyse safety behaviour of RMAA workers. Game theory is concerned with the decision-making process in situations where outcomes depend upon choices made by one or more players. A game theoretical model between contractor and worker has been proffered. Mathematical analysis of this game model has been done and implications of the analysis have been discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper aims to examine how Australian boarding supervisors (particularly non-teachers) are defined in regards to employment. The practices of Queensland’s School X (real name withheld) are used as an example of the difficult issues involved – although whether this case study is repeated elsewhere in the industry would take further research. The paper illustrates that the employment of boarding supervisors is dealt with at a basic level by a modern award, however its provisions do not represent what occurs in practice. If there is no enterprise bargain which improves upon the award, two possible explanations are put forward to explain the difference between award conditions and practice. The first is that the contract between boarding supervisors may not be one of employment. Relevant case law regarding whether a person is an employee or independent contractor is examined, and when applied to a typical boarding situation, it is concluded that any contract should be one of employment. The second explanation is that there is no legal contract at all between boarding supervisors and a school. Drawing on School X’s example where supervisors were classed as ‘volunteers’, the paper examines what the legal effect of that term might be. It could be seen to be a denial of an intention to create legal relations, a critical element in contract formation. Again, important cases are analysed on the topic of intention, and applied to a boarding context. It is argued that given the objective circumstances of a typical agreement, there is an intention to create legal relations. In particular, a little known Queensland case involving the non-employment status of boarding supervisors, which may be the cause of the confusion, is critically examined to determine its usefulness in answering the issue. Finally, the implications of not classifying boarding supervisors as employees are briefly discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

[Conclusion] We have explored two dimensions of the Australian OHS statutes which enable statutory OHS duties to reach more than one employer or self-employed person within a corporate group or network. First, most of the OHS statutes contain provisions extending the reach of employer’s duty beyond the employer’s employees. One legislative technique is to deem contractors and their employees to be employees of the principal contractor. Another imposes duties on employers and self-employed persons to persons who are not employees, so that employers and self-employed persons can be responsible for the OHS of firms, and those they engage, lower in the contractual chain. These duties are non-delegable, meaning that the principal contractor cannot seek to delegate OHS duties to firms lower in the contractual chain. Second, new Victorian ‘shadow officer’ provisions can be applied to remove difficulties and doubt as to the liability of partners in a partnership, officers of unincorporated associations, joint venturers, and holding and subsidiary companies within corporate groups. While the provisions can be argued simply to confirm that a partner who fails to take reasonable care in relation to OHS will be guilty of an offence, we demonstrate that there are very real benefits to having ‘shadow officer’ provisions which remove uncertainties about the liability of unincorporated associations, joint ventures and corporate groups. Perhaps most significantly, the Victorian corporate officer provisions have the potential to extend liability to individuals and other entities within organisational structures, where those individuals and entities make or participate in making decisions that affect the whole or a substantial part of the organisation’s business, and are responsible for an OHS offence having been committed, due to their failure to take reasonable care. We suggest that similar provisions should be included in all OHS statutes, to overcome at least some of the barriers limiting group responsibility for OHS statutory duties.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings. Key words: greenhouse gases reduction; road construction; contracting; ECI; D&C

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction scholars suggest that procurement processes can be used as mechanisms to change construction industry practices. This paper discusses industry changes as a response to the calls for integration of sustainability ideals into construction practices. Because major infrastructure construction has been identified as a key producer of greenhouse gas emissions (GHGE), this study explores collaborative procurement models that have been used to facilitate mitigation of GHGE. The study focuses on the application of non-price incentives and rewards that work together as a binary mechanism. Data were collected using mixed-methods: government document content analysis was complemented with data collected through focus groups and individual interviews with both clients and contractors. This report includes examples of greening procurement agendas for three Australian road authorities relating to collaborative procurement project delivery models. Three collaborative procurement models, Alliance Consortium, Early Contractor Involvement and Public Private Partnerships provide evidence of construction projects that were completed early. It can also be argued that both clients and contractors are rewarded through collaborative project delivery. The incentive of early completion is rewarded with reduction of GHGE. This positive environmental outcome, based on a dual benefit and non-price sustainability criteria, suggests a step towards changed industry practices though the use of green procurement models.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article examines the legal principles governing the statutory work health and safety general duties of principals who engage expert contractors to carry out work beyond the expertise of the principal. The article examines recent case law in which superior courts accepted the principal’s argument that the engagement of the expert contractor was sufficient to discharge the principal’s statutory work health and safety general duty. It then reframes the debate within the principles of systematic work health and safety management, and key provisions in the harmonised Work Health and Safety Acts—the primary duty of care; the key underpinning principles; the positive and proactive officer’s duty; and the horizontal duty of consultation, cooperation and coordination. It argues that it is likely that courts examining the issue of the principal’s work health and safety obligations under the harmonised Work Health and Safety Acts will require principals to do more to actively manage the work of expert contractors to ensure the health and safety of all workers and others potentially affected by the work.