763 resultados para Agency costs
Resumo:
This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.
Resumo:
This paper explores inter-agency working and examines the implications of inter-agency operations for delivering multi-domain service outcomes. Cross-agency collaborative approaches to service delivery are suggested to provide the vehicle for achieving integrated service and policy goals. However, it is argued these need to be crafted ‘fit’ for purpose’ and may not be the requisite approach for all joint purposes. Moreover, some commentators suggest that the optimism about these partnership arrangements and cross-agency actions to resolve complex multi-dimensional problems may be misplaced and propose that further research into the actual rather than desired consequences of these arrangements may find that, at times, partnership working creates negative effects. While collaboration and partnerships are often framed as the way to achieve real breakthroughs in service delivery across agencies, there remain key challenges to interagency working. As more and insistent calls for agencies and other community actors to work together in resolving complex social problems are heeded, the implications of working across organizational boundaries need to be further investigated. This paper investigates cases of inter-agency programmes to understand the dimensions and limitations of inter-agency working. The paper concludes by offering a framework for better inter-agency working that has applicability across all sectors.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.
Resumo:
Underlying social space are territories, lands,geographical domains, the actual geographical underpinnings of the imperial, and also the cultural contest. To think about distant places, to colonize them, to populate or depopulate them: all of this occurs on, about, or because of land. […] Imperialism and the culture associated with it affirm both the primacy of geography and an ideology about control of territory.
Resumo:
The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.
Resumo:
Large cities provide a broad range of residential property types, as well as a range of socio-economic locations. This results in a significant variation in residential property prices across both the city itself and the individual suburbs. The only constant across such a diverse range of residential property is the need for the majority of residential property owners to employ the services of a real estate agent to sell their property or to purchase a residential property. This paper will analyse the Sydney residential property market over the period 1994 to 2002 to determine the change in real estate offices numbers over the period, the profitability of real estate agency offices based on the residential house price performance of houses and units in these specific locations and the extent of changing residential house prices on agency profitability. Suburbs have been selected to provide a full range of housing types, socio-economic areas, older established and developing residential suburbs and location from the
Resumo:
Aim To estimate the economic consequences of pressure ulcers attributable to malnutrition. Method Statistical models were developed to predict the number of cases of pressure ulcer, associated bed days lost and the dollar value of these losses in public hospitals in 2002/2003 in Queensland, Australia. The following input parameters were specified and appropriate probability distributions fitted • Number of at risk discharges per annum • Incidence rate for pressure ulcer • Attributable fraction of malnutrition in the development of pressure ulcer • Independent effect of pressure ulcer on length of hospital stay • Opportunity cost of hospital bed day One thousand random re-samples were made and the results expressed as (output) probabilistic distributions. Results The model predicts a mean 16060 (SD 5 671) bed days lost and corresponding mean economic cost of AU$12 968 668 (SD AU$4 924 148) (EUROS 6 925 268 SD 2 629 495; US$ 7 288 391 SD 2 767 371) of pressure ulcer attributable to malnutrition in 2002/2003 in public hospitals in Queensland, Australia. Conclusion The cost of pressure ulcer attributable to malnutrition in bed days and dollar terms are substantial. The model only considers costs of increased length of stay associated with pressure ulcer and not other factors associated with care.
Resumo:
Manuscript Type: Empirical Research Issue: We propose that high levels of monitoring are not always in the best interests of minority shareholders. In family-owned companies the optimal level of board monitoring required by minority shareholders is expected to be lower than that of other companies. This is because the relative benefits and costs of monitoring are different in family-owned companies. Research Findings: At moderate levels of board monitoring, we find concave relationships between board monitoring variables and firm performance for family-owned companies but not for other companies. The optimal level of board monitoring for our sample of Asian family-owned companies equates to board independence of 38%, separation of the Chairman and CEO positions and establishment of audit and remuneration committees. Additional testing shows that the optimal level of board monitoring is sensitive to the magnitude of the agency conflict between the family group and minority shareholders and the presence of substitute monitoring. Practitioner/Policy Implications: For policymakers, the results show that more monitoring is not always in the best interests of minority shareholders. Therefore, it may be inappropriate for regulators to advise all companies to follow the same set of corporate governance guidelines. However, our results also indicate that the board governance practices of family-owned companies are still well below the identified optimal levels. Keywords: Corporate Governance, Board Independence, Board of Directors, Family Firms, Monitoring.
Resumo:
In today's fiercely competitive products market, product warranty has started playing an important role. The warranty period offered by the manufacturer/dealer has been progressively increasing since the beginning of the 20th Century. Currently, a large number of products are being sold with long-term warranty policies in the form of extended warranty, warranty for used products, service contracts and lifetime warranty policies. Lifetime warranties are relatively a new concept. The modelling of failures during the warranty period and the costs for such policies are complex since the lifespan in these policies are not defined well and it is often difficult to tell about life measures for the longer period of coverage due to usage pattern/maintenance activities undertaken and uncertainties of costs over the period. This paper focuses on defining lifetime, developing lifetime warranty policies and models for predicting failures and estimating costs for lifetime warranty policies.
Resumo:
Presentation given by Dr John S Cook at the Queensland Spatial Conference 2008, Global Warming: What’s Happening in Paradise?, held at Holiday Inn, Surfers Paradise,Queensland from 17-19 July, 2008 This presentation provides some semblance of an information infrastructure that is aligned generally to problems of governance in complex organisations.