992 resultados para Dança - Planejamento


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Considered as one of the oldest activities done by men, the civil construction represents one of the most important sectors for the economic growth of a country, in spite of the low results of growth in the past few years and also in the current year. To make this industry grow, even with an unfavourable economic scenario, it is necessary to implement an effective planning in its activities. This is one of the most important concepts brought by the Lean Construction philosophy, which had its origin through the adaptation of the concepts established by the Toyota Production System (TPS) or Lean Production. By having as a scenario the city of Natal\RN, the main goal of this dissertation consists in investigating how the 11 principles of the lean construction influenced the schedule of a construction field that started to implement its lean concepts. As a methodology, it was used the case study of a big enterprise located in Natal (RN). During the execution of the method, documents related to the short-term, midterm and long-term planning were analysed , aiming to describe its planning process; it was also described the factors that caused the delays at the enterprises’ field ;in addition, a comparison was made between the results obtained at the case study and the ones presented at the literature; in the end, the actions were listed by the company, which had the purpose to solve the main causes of delays, verifying if they were linked to the lean construction principles. This research finds its reason of existence in the relevance of its theme at the nowadays reality of the construction industry, since the principles of the lean construction uphold the reduction of processes that are useless, diminishing wastes as well as costs in construction. The relevance is perceived for the academy, in terms of the possibility to discuss if the concepts established by the lean production are being adapted to the civil construction sector and how this adaptation is influencing at the buildings planning project. Economic importance, because with the reduction of the wastes and costs, the companies may reduce the building´s value into a more accessible value, even with the sector´s lower growth. And social significance, because lean construction gives a better participation of the labour at the planning activity. Among the main results, the high frequency of planning errors stands out, mainly the programming deviations and not the task programming, as well as the execution errors, low productivity and activities executed by the workers. Amongst the 11 principles of lean construction, only five were related with the 12 actions analysed by the author. From the 12 actions, four were completely cohesive to one or more from these five principles. Some improvement proposals were also highlighted and established by the research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Brazilian law provides a series of rules and policies which regulate space use and occupancy as well as guide environmental planning. Among those are the Permanent Preservation Areas (PPAs) which purpose is to ensure the preservation of elements that are essential to maintain the environmental function and landscape. Another important instrument identifier of spaces are geoenvironmental units, which are synthesis elements grouping areas of similar characteristics and can be used for the analysis of risk, fragility and potential use of spaces. The geoenvironmental units are defined by more complex processes (information integration), focusing not only on individual elements, but being determined from a systemic analysis. Is It possible to identify and delineate APPs from the identification and determination of geoenvironmental units? The aim of this study was to evaluate the potential of geoenvironmental units in the process of identification and delineation of APPs a see how much of the study area, the area by the Coast line in Natal/RN, is still good for occupation. It was used the physiognomic method, in which the limits of the units are plotted on a synthetic document (aerial photographs), valuing aspects of relief in a range of detail by the analysis of systemic categories (element, structure, function and interaction), observed. The methodology used allowed the identification and delineation of eleven geoenvironmental units and, from these, it was possible to identify and delineate four out of the five PPAs occurring in the study area. Only a small space of 1.2 ha of the study area is not considered APP by law. Thus, the occupation of the unoccupied area by the Coast line is not feasible from a legal standpoint. The geoenvironmental units as well as the identified and delineated APPs in the area by the Coast line are spaces which preservation is guaranteed by law in various scopes and are necessary to maintain the environmental functions of the area. The planning for the use and occupation of the area should involve the recovery of degraded areas and the creation of elements that make possible the use as well as attract the community, as provided in the initial planning, by ensuring the public utility and social interest in the Project.