995 resultados para queue management


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis investigated both the potential for Business Continuity Management to enhance organisational reliability, and appropriate levels of Business Continuity Management capability resident in a number of Australian international and regional airports. Findings indicated that a host of regulatory and business processes including Business Continuity Management can assist in creating reliability in aviation infrastructure systems in Australia. Further, the thesis developed a multi-level maturity assessment framework for defining the depth of implementation of Business Continuity Management capabilities in airports, along with other recommendations to improve functional reliability of airport operations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis used a cross-sectional survey to examine how Vietnamese nurses educate COPD patients about the self-management of their disease. Further, the study also describes the characteristics of Vietnamese nurses working in COPD specialty areas as well as examining their COPD knowledge and the factors which influence their delivery of COPD self-management education when caring for COPD patients. The study found that while Vietnamese nurses are likely to deliver self-management education to the COPD patients they care for, there are areas for improvement in nurses' knowledge in all areas of COPD management and self management education.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Water management is vital for mine sites both for production and sustainability related issues. Effective water management is a complex task since the role of water on mine sites is multifaceted. Computers models are tools that represent mine site water interaction and can be used by mine sites to inform or evaluate their water management strategies. There exist several types of models that can be used to represent mine site water interactions. This paper presents three such models: an operational model, an aggregated systems model and a generic systems model. For each model the paper provides a description and example followed by an analysis of its advantages and disadvantages. The paper hypotheses that since no model is optimal for all situations, each model should be applied in situations where it is most appropriate based upon the scale of water interactions being investigated, either unit (operation), inter-site (aggregated systems) or intra-site (generic systems).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background In 2002/03 the Queensland Government responded to high rates of alcohol-related harm in discrete Indigenous communities by implementing alcohol management plans (AMPs), designed to include supply and harm reduction and treatment measures. Tighter alcohol supply and carriage restrictions followed in 2008 following indications of reductions in violence and injury. Despite the plans being in place for over a decade, no comprehensive independent review has assessed to what level the designed aims were achieved and what effect the plans have had on Indigenous community residents and service providers. This study will describe the long-term impacts on important health, economic and social outcomes of Queensland’s AMPs. Methods/Design The project has two main studies, 1) outcome evaluation using de-identified epidemiological data on injury, violence and other health and social indicators for across Queensland, including de-identified databases compiled from relevant routinely-available administrative data sets, and 2) a process evaluation to map the nature, timing and content of intervention components targeting alcohol. Process evaluation will also be used to assess the fidelity with which the designed intervention components have been implemented, their uptake and community responses to them and their perceived impacts on alcohol supply and consumption, injury, violence and community health. Interviews and focus groups with Indigenous residents and service providers will be used. The study will be conducted in all 24 of Queensland’s Indigenous communities affected by alcohol management plans. Discussion This evaluation will report on the impacts of the original aims for AMPs, what impact they have had on Indigenous residents and service providers. A central outcome will be the establishment of relevant databases describing the parameters of the changes seen. This will permit comprehensive and rigorous surveillance systems to be put in place and provided to communities empowering them with the best credible evidence to judge future policy and program requirements for themselves. The project will inform impending alcohol policy and program adjustments in Queensland and other Australian jurisdictions. The project has been approved by the James Cook University Human Research Ethics Committee (approval number H4967 & H5241).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to foster a common understanding of business process management (BPM) by proposing a set of ten principles that characterize BPM as a research domain and guide its successful use in organizational practice. Design/methodology/approach The identification and discussion of the principles reflects our viewpoint, which was informed by extant literature and focus groups, including 20 BPM experts from academia and practice. Findings We identify ten principles which represent a set of capabilities essential for mastering contemporary and future challenges in BPM. Their antonyms signify potential roadblocks and bad practices in BPM. We also identify a set of open research questions that can guide future BPM research. Research limitation/implication Our findings suggest several areas of research regarding each of the identified principles of good BPM. Also, the principles themselves should be systematically and empirically examined in future studies. Practical implications – Our findings allow practitioners to comprehensively scope their BPM initiatives and provide a general guidance for BPM implementation. Moreover, the principles may also serve to tackle contemporary issues in other management areas. Originality/value This is the first paper that distills principles of BPM in the sense of both good and bad practice recommendations. The value of the principles lies in providing normative advice to practitioners as well as in identifying open research areas for academia, thereby extending the reach and richness of BPM beyond its traditional frontiers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Современный этап развития комплексов автоматического управления и навигации малогабаритными БЛА многократного применения предъявляет высокие требования к автономности, точности и миниатюрности данных систем. Противоречивость требований диктует использование функционального и алгоритмического объединения нескольких разнотипных источников навигационной информации в едином вычислительном процессе на основе методов оптимальной фильтрации. Получили широкое развитие бесплатформенные инерциальные навигационные системы (БИНС) на основе комплексирования данных микромеханических датчиков инерциальной информации и датчиков параметров движения в воздушном потоке с данными спутниковых навигационных систем (СНС). Однако в современных условиях такой подход не в полной мере реализует требования к помехозащищённости, автономности и точности получаемой навигационной информации. Одновременно с этим достигли значительного прогресса навигационные системы, использующие принципы корреляционно экстремальной навигации по оптическим ориентирам и цифровым картам местности. Предлагается схема построения автономной автоматической навигационной системы (АНС) для БЛА многоразового применения на основе объединения алгоритмов БИНС, спутниковой навигационной системы и оптической навигационной системы. The modern stage of automatic control and guidance systems development for small unmanned aerial vehicles (UAV) is determined by advanced requirements for autonomy, accuracy and size of the systems. The contradictory of the requirements dictates novel functional and algorithmic tight coupling of several different onboard sensors into one computational process, which is based on methods of optimal filtering. Nowadays, data fusion of micro-electro mechanical sensors of inertial measurement units, barometric pressure sensors, and signals of global navigation satellite systems (GNSS) receivers is widely used in numerous strap down inertial navigation systems (INS). However, the systems do not fully comply with such requirements as jamming immunity, fault tolerance, autonomy, and accuracy of navigation. At the same time, the significant progress has been recently demonstrated by the navigation systems, which use the correlation extremal principle applied for optical data flow and digital maps. This article proposes a new architecture of automatic navigation management system (ANMS) for small UAV, which combines algorithms of strap down INS, satellite navigation and optical navigation system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

В статье представлено развитие принципа построения автоматической пилотажно-навигационной системы (АПНС) для беспилотного летательного аппарата (БЛА). Принцип заключается в синтезе комплексных систем управления БПЛА не только на основе использования алгоритмов БИНС, но и алгоритмов, объединяющих в себе решение задач формирования и отработки сформированной траектории резервированной системой управления и навигации. Приведены результаты аналитического исследования и данные летных экспериментов разработанных алгоритмов АПНС БЛА, обеспечивающих дополнительное резервирование алгоритмов навигации и наделяющих БЛА новым функциональной способностью по выходу в заданную точку пространства с заданной скоростью в заданный момент времени с учетом атмосферных ветровых возмущений. Предложена и испытана методика идентификации параметров воздушной атмосферы: направления и скорости W ветра. Данные летных испытаний полученного решения задачи терминальной навигации демонстрируют устойчивую работу синтезированных алгоритмов управления в различных метеоусловиях. The article presents a progress in principle of development of automatic navigation management system (ANMS) for small unmanned aerial vehicle (UAV). The principle defines a development of integrated control systems for UAV based on tight coupling of strap down inertial navigation system algorithms and algorithms of redundant flight management system to form and control flight trajectory. The results of the research and flight testing of the developed ANMS UAV algorithms are presented. The system demonstrates advanced functional redundancy of UAV guidance. The system enables new UAV capability to perform autonomous multidimensional navigation along waypoints with controlled speed and time of arrival taking into account wind. The paper describes the technique for real-time identification of atmosphere parameters such as wind direction and wind speed. The flight test results demonstrate robustness of the algorithms in diverse meteorological conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Small Businesses account for a significant portion of the Australian business sector. With Business Process Management (BPM) gaining prominence in recent decades as a means of improving business performance, it would seem to only be a matter of time before it gains momentum within the Small Business sector. One may even question why it has not already achieved more traction within the sector. This case study involves a BPM initiative to develop process infrastructure in an establishing Small Business. It explores whether mainstream BPM tools, techniques and technologies can be applied in a Small Business setting. The chapter provides a background to the case organisation, outlines the activities undertaken in the BPM initiative and distils key observations drawn from participation in the initiative and consultation with stakeholders. Based on the case study experiences, a number of implications are identified for further consideration by the BPM discipline as it continues to address the question of how it can become more widely adopted amongst Small Businesses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project provides a costed and appraised set of management strategies for mitigating threats to species of conservation significance in the Pilbara IBRA bioregion of Western Australia (hereafter 'the Pilbara'). Conservation significant species are either listed under federal and state legislation, international agreements or considered likely to be threatened in the next 20 years. Here we report on the 17 technically and socially feasible management strategies, which were drawn from the collective experience and knowledge of 49 experts and stakeholders in the ecology and management of the Pilbara region. We determine the relative ecological cost-effectiveness of each strategy, calculated as the expected benefit of management to the persistence of 53 key threatened native fauna and flora species, divided by the expected cost of management. Finally we provide decision support to assist prioritisation of the strategies on the basis of ecological cost-effectiveness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

INTRODUCTION Managing spinal deformities in young children is challenging, particularly early onset scoliosis (EOS). Surgical intervention is often required if EOS has been unresponsive to conservative treatment particularly with rapidly progressive curves. An emerging treatment option for EOS is fusionless scoliosis surgery. Similar to bracing, this surgical option potentially harnesses growth, motion and function of the spine along with correcting spinal deformity. Dual growing rods are one such fusionless treatment, which aims to modulate growth of the vertebrae. The aim of this study was to ascertain the extent to which semiconstrained growing rods (Medtronic, Sofamor, Danek, Memphis, TN) with a telescopic sleeve component, reduce rotational constraint on the spine compared with standard "constrained / rigid" rods and hence potentially provide a more physiological mechanical environment for the growing spine. METHODS Six 40-60kg English Large White porcine spines served as a model for the paediatric human spine. Each spine was dissected into a 7 level thoracolumbar multi-segment unit (MSU), removing all non-ligamentous soft tissues and leaving 3cm of ribs either side. Pure nondestructive axial rotation moments of ±4Nm at a constant rotation rate of 8deg.s-1 were applied to the mounted MSU spines using a biaxial Instron testing machine. Displacement of each vertebral level was captured using a 3D motion tracking system (Optotrak 3020, Northern Digital Inc, Waterloo, ON). Each spine was tested in an un-instrumented state first and then with appropriately sized semi-constrained growing rods and rigid rods in alternating sequence. The rods were secured by multi-axial pedicle screws (Medtronic CD Horizon) at levels 2 and 6 of the construct. The range of motion (ROM), neutral zone (NZ) size and stiffness (Nm.deg-1) were calculated from the Instron load-displacement data and intervertebral ROM was calculated through a MATLAB algorithm from Optotrak data. RESULTS Irrespective of the order of testing, rigid rods significantly reduced the total ROM compared with semi-constrained rods (p<0.05) with in a significantly stiffer spine for both left and right axial rotation (p<0.05). Analysing the intervertebral motion within the instrumented levels 2-6, rigid rods showed reduced ROM compared with semi-constrained growing rods and compared with un-instrumented motion segments. CONCLUSION Semi-constrained growing rods maintain similar stiffness in axial rotation to un-instrumented spines, while dual rigid rods significantly reduce axial rotation. Clinically the effect of semi-constrained growing rods as observed in this study is that they would be expected to allow growth via the telescopic rod components while maintaining the axial flexibility of the spine, which may reduce occurrence of the crankshaft phenomenon.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Engaging clients from the outset of psychotherapy is important for therapeutic success. However, there is little research evaluating therapists’ initial attempts to engage clients. This article reports retrospective analysis of data from a trial of online Cognitive Behavioural Therapy (CBT) for depression. Qualitative and quantitative methods were used to evaluate how therapists manage clients’ expectations at the outset of therapy and its relationship with client retention in the therapeutic intervention. Aims To develop a system to codify expectation management in initial sessions of online CBT and evaluate its relationship with retention. Method Initial qualitative research using conversation analysis identified three different communication practices used by therapists at the start of first sessions: no expectation management, some expectation management, and comprehensive expectation management. These findings were developed into a coding scheme that enabled substantial inter-rater agreement (weighted Kappa = 0.78; 95% CI: 0.52 to 0.94) and was applied to all trial data. Results Adjusting for a range of client variables, primary analysis of data from 147 clients found comprehensive expectation management was associated with clients remaining in therapy for 1.4 sessions longer than those who received no expectation management (95% CI: -0.2 to 3.0). This finding was supported by a sensitivity analysis including an additional 21 clients (1.6 sessions, 95% CI: 0.2 to 3.1). Conclusions Using a combination of qualitative and quantitative methods, this study suggests a relationship between expectation management and client retention in online CBT for depression, which has implications for professional practice. A larger prospective study would enable a more precise estimate of retention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

MOST PAN stages in Australian factories use only five or six batch pans for the high grade massecuite production and operate these in a fairly rigid repeating production schedule. It is common that some of the pans are of large dropping capacity e.g. 150 to 240 t. Because of the relatively small number and large sizes of the pans, steam consumption varies widely through the schedule, often by ±30% about the mean value. Large fluctuations in steam consumption have implications for the steam generation/condensate management of the factory and the evaporators when bleed vapour is used. One of the objectives of a project to develop a supervisory control system for a pan stage is to (a) reduce the average steam consumption and (b) reduce the variation in the steam consumption. The operation of each of the high grade pans within the schedule at Macknade Mill was analysed to determine the idle (or buffer) time, time allocations for essential but unproductive operations (e.g. pan turn round, charging, slow ramping up of steam rates on pan start etc.), and productive time i.e. the time during boil-on of liquor and molasses feed. Empirical models were developed for each high grade pan on the stage to define the interdependence of the production rate and the evaporation rate for the different phases of each pan’s cycle. The data were analysed in a spreadsheet model to try to reduce and smooth the total steam consumption. This paper reports on the methodology developed in the model and the results of the investigations for the pan stage at Macknade Mill. It was found that the operation of the schedule severely restricted the ability to reduce the average steam consumption and smooth the steam flows. While longer cycle times provide increased flexibility the steam consumption profile was changed only slightly. The ability to cut massecuite on the run among pans, or the use of a high grade seed vessel, would assist in reducing the average steam consumption and the magnitude of the variations in steam flow.