991 resultados para Highway Safety Program Standards.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Motorcycle trauma is a serious road safety issue in Queensland and throughout Australia. In 2009, Queensland Transport (later Transport and Main Roads or TMR) appointed CARRS-Q to provide a three-year program of Road Safety Research Services for Motorcycle Rider Safety. Funding for this research originated from the Motor Accident Insurance Commission. This program of research was undertaken to produce knowledge to assist TMR to improve motorcycle safety by further strengthening the licensing and training system to make learner riders safer by developing a pre-learner package (Deliverable 1), and by evaluating the QRide CAP program to ensure that it is maximally effective and contributes to the best possible training for new riders (Deliverable 2). The focus of this report is Deliverable 3 of the overall program of research. It identifies potential new licensing components that will reduce the incidence of risky riding and improve higher-order cognitive skills in new riders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, speeding remains a substantial contributor to road trauma. The National Road Safety Strategy (2011-2020) highlighted the need to harness community support for current and future speed management strategies. Australia is known for intensive speed camera programs which are both automated and manual, employing covert and overt methods. Recent developments in the area of automated speed enforcement in Australia help to illustrate the important link between community attitudes to speed enforcement and subsequent speed camera policy developments. A perceived lack of community confidence in camera programs prompted reviews in New South Wales and Victoria in 2011 by the jurisdictional Auditor-General. This paper explores automated speed camera enforcement in Australia with particular reference to the findings of these two reports as they relate to the level of public support for and community attitudes towards automated speed enforcement. It also provides comment on the evolving nature of automated speed enforcement according to previously identified controversies and dilemmas associated with speed camera programs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

All civil and private aircraft are required to comply with the airworthiness standards set by their national airworthiness authority and throughout their operational life must be in a condition of safe operation. Aviation accident data shows that over twenty percent of all fatal accidents in aviation are due to airworthiness issues, specifically aircraft mechanical failures. Ultimately it is the responsibility of each registered operator to ensure that their aircraft remain in a condition of safe operation, and this is done through both effective management of airworthiness activities and the effective program governance of safety outcomes. Typically, the projects within these airworthiness management programs are focused on acquiring, modifying and maintaining the aircraft as a capability supporting the business. Program governance provides the structure through which the goals and objectives of airworthiness programs are set along with the means of attaining them. Whilst the principal causes of failures in many programs can be traced to inadequate program governance, many of the failures in large scale projects can have their root causes in the organisational culture and more specifically in the organisational processes related to decision-making. This paper examines the primary theme of project and program based enterprises, and introduces a model for measuring organisational culture in airworthiness management programs using measures drawn from 211 respondents in Australian airline programs. The paper describes the theoretical perspectives applied to modifying an original model to specifically focus it on measuring the organisational culture of programs for managing airworthiness; identifying the most important factors needed to explain the relationship between the measures collected, and providing a description of the nature of these factors. The paper concludes by identifying a model that best describes the organisational culture data collected from seven airworthiness management programs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many of the more extreme bushfire prone landscapes in Australia are located in colder climate regions. For such sites, the National Construction Code regulates that houses satisfy both the Australian Standard for Bushfire (AS 3959:2009) and achieve a 6 Star energy rating. When combined these requirements present a considerable challenge to the construction of affordable housing - a problem which is often exacerbated by the complex topography of bushifre prone landscapes. Dr Weir presents a series of case studies from his architetcural practice which highlight the need for further design-led research into affordable housing - a ground up holistic approach to design which recolciles energy performance, human behaviourm, bushland conservation and bushfire safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australian universities are currently engaging with new governmental policies and regulations that require them to demonstrate enhanced quality and accountability in teaching and research. The development of national academic standards for learning outcomes in higher education is one such instance of this drive for excellence. These discipline-specific standards articulate the minimum, or Threshold Learning Outcomes, to be addressed by higher education institutions so that graduating students can demonstrate their achievement to their institutions, accreditation agencies, and industry recruiters. This impacts not only on the design of Engineering courses (with particular emphasis on pedagogy and assessment), but also on the preparation of academics to engage with these standards and implement them in their day-to-day teaching practice on a micro level. This imperative for enhanced quality and accountability in teaching is also significant at a meso level, for according to the Australian Bureau of Statistics, about 25 per cent of teachers in Australian universities are aged 55 and above and more than 54 per cent are aged 45 and above (ABS, 2006). A number of institutions have undertaken recruitment drives to regenerate and enrich their academic workforce by appointing capacity-building research professors and increasing the numbers of early- and mid-career academics. This nationally driven agenda for quality and accountability in teaching permeates also the micro level of engineering education, since the demand for enhanced academic standards and learning outcomes requires both a strong advocacy for a shift to an authentic, collaborative, outcomes-focused education and the mechanisms to support academics in transforming their professional thinking and practice. Outcomes-focused education means giving greater attention to the ways in which the curriculum design, pedagogy, assessment approaches and teaching activities can most effectively make a positive, verifiable difference to students’ learning. Such education is authentic when it is couched firmly in the realities of learning environments, student and academic staff characteristics, and trustworthy educational research. That education will be richer and more efficient when staff works collaboratively, contributing their knowledge, experience and skills to achieve learning outcomes based on agreed objectives. We know that the school or departmental levels of universities are the most effective loci of changes in approaches to teaching and learning practices in higher education (Knight & Trowler, 2000). Heads of Schools are being increasingly entrusted with more responsibilities - in addition to setting strategic directions and managing the operational and sometimes financial aspects of their school, they are also expected to lead the development and delivery of the teaching, research and other academic activities. Guiding and mentoring individuals and groups of academics is one critical aspect of the Head of School’s role. Yet they do not always have the resources or support to help them mentor staff, especially the more junior academics. In summary, the international trend in undergraduate engineering course accreditation towards the demonstration of attainment of graduate attributes poses new challenges in addressing academic staff development needs and the assessment of learning. This paper will give some insights into the conceptual design, implementation and empirical effectiveness to date, of a Fellow-In-Residence Engagement (FIRE) program. The program is proposed as a model for achieving better engagement of academics with contemporary issues and effectively enhancing their teaching and assessment practices. It will also report on the program’s collaborative approach to working with Heads of Schools to better support academics, especially early-career ones, by utilizing formal and informal mentoring. Further, the paper will discuss possible factors that may assist the achievement of the intended outcomes of such a model, and will examine its contributions to engendering an outcomes-focussed thinking in engineering education.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Drink driving is a major public health issue and this report examines the experiences of convicted offenders who participated in an established drink driving rehabilitation program Under the Limit (UTL). Course completers were surveyed at least three months after they had finished the 11-week UTL course. The aim of this study was to examine whether the UTL program reduced the level of alcohol consumption either directly as a result of participation in the UTL drink driving program or through increased use of community alcohol program by participants. The research involved a self-report outcome evaluation to determine whether the self-reported levels of alcohol use after the course had changed from the initial alcohol use reported by offenders. The findings are based on the responses of 30 drink-driving offenders who had completed the UTL program (response rate: 20%). While a process evaluation was proposed in the initial application, the low response rate meant that this follow up research was not feasible. The response rate was low for two reasons, it was difficult to: recruit participants who consented to follow up, and subsequently locate and survey those who had consented to involvement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The growing national and international awareness of the increased representation of serious injuries and fatalities in rural and remote areas is the focus of this paper. Australia was one of the earliest countries to try to address this issue with a targeted national action plan in 1996. This was an important document but the most recent national plan fails to dedicate attention to developing countermeasures for the particular problems of improving road safety in these regions. The findings of a major program of research in Northern Queensland are discussed to stimulate interest and research into potential countermeasures. Specifically, the need to monitor clusters of crashes as a focus for intervention and local ownership is advocated. Taking action towards a national reduction of speed limits on rural roads and investment in proactive research based trials of drink driving countermeasures such as courtesy buses is strongly advocated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This case study report describes the stages involved in the translation of research on night-time visibility into standards for the safety clothing worn by roadworkers. Vision research demonstrates that when lights are placed on the moveable joints of the body and the person moves in a dark setting, the phenomenon known as “biological motion or biomotion” occurs, enabling rapid and accurate recognition of the human form although only the lights can be seen. QUT was successful in gaining funding from the Australian Research Council for a Linkage grant due to the support of the predecessors of the Queensland Department of Transport and Main Roads (TMR) to research the biomotion effect in on-road settings using materials that feature in roadworker clothing. Although positive results were gained, the process of translating the research results into policy, practices and standards relied strongly on the supportive efforts of TMR staff engaged in the review and promulgation of national standards. The ultimate result was the incorporation of biomotion marking into AS/NZS 4602.1 2011. The experiences gained in this case provide insights into the processes involved in translating research into practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2005 the Australian Capital Territory (ACT) Office of the Director of Public Prosecutions (DPP) and the Australian Federal Police (AFP) produced a report, Responding to sexual assault: The challenge of change (DPP & AFP 2005), which made 105 recommendations for reforming the way sexual offence cases are handled by the ACT’s criminal justice system. The Sexual Assault Reform Program (SARP) is one key initiative developed in response to these recommendations. Managed by the ACT Justice and Community Safety Directorate (JACS), SARP’s main objective is to improve aspects of the criminal justice system relating to: processes and support for victims of sexual offences as they progress through the system; attrition in sexual offence matters in the criminal justice system; and coordination and collaboration among the agencies involved. In November 2007 the ACT Attorney-General announced $4 million of funding for several SARP reforms. This funding provided for additional victim support staff; a dedicated additional police officer, prosecutor and legal policy officer; and an upgrade of equipment for the Supreme Court and Magistrates Court, including improvements in technology to assist witnesses in giving evidence, and the establishment of an off-site facility to allow witnesses to give evidence from a location outside of the court. In addition, the reform agenda included a number of legislative amendments that changed how evidence can be given by victims of sexual and family violence offences, children and other vulnerable witnesses. The primary objectives of these legislative changes are to provide an unintimidating, safe environment for vulnerable witnesses (including sexual offence complainants) to give evidence and to obtain prompt statements from witnesses to improve the quality of evidence captured (DPP 2009: 13). The current evaluation The funding for SARP reforms also provided for a preliminary evaluation of the reforms; this report outlines findings from the evaluation. The evaluation sought to address whether the program has met its key objectives: better support for victims, lower attrition rates and improved coordination and collaboration among agencies involved in administering SARP. The evaluation was conducted in two stages and involved a mixed-methods approach. During stage 1 key indicators for the evaluation were developed with stakeholders. During stage 2 quantitative data were collected by stakeholders and provided to the AIC for analysis. Qualitative interviews were also conducted with service delivery providers, and with a small number (n=5) of victim/survivors of sexual offences whose cases had recently been resolved in the ACT criminal justice system. The current evaluation is preliminary in nature. As the SARP reforms will take time to become entrenched within the ACT’s criminal justice system, some of the impacts of the reforms may not yet be evident. Nonetheless, this evaluation provides an insight into how well the SARP reforms have been implemented to date, as well as key areas that could be addressed in the future. Key findings from the preliminary evaluation are outlined briefly below.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The International Road Assessment Program (iRAP) is a not-for-profit organisation that works in partnership with governments and non-government organisations in all parts of the world to make roads safe. The iRAP Malaysia pilot study on 3,700km of road identified the potential to save 31,800 deaths and serious injuries over the next 20 years from proven engineering improvements. To help ensure the iRAP data and results are available to planners and engineers, iRAP, together with staff from the Centre for Accident Research and Road Safety – Queensland (CARRS-Q) and the Malaysian Institute of Road Safety Research (MIROS) developed a 5-day iRAP training course that covers the background, theory and practical application of iRAP protocols, with a special focus on Malaysian case studies. Funding was provided by a competitive grant from the Australian-Malaysia Institute.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dedicated Short Range Communication (DSRC) is the emerging key technology supporting cooperative road safety systems within Intelligent Transportation Systems (ITS). The DSRC protocol stack includes a variety of standards such as IEEE 802.11p and SAE J2735. The effectiveness of the DSRC technology depends on not only the interoperable cooperation of these standards, but also on the interoperability of DSRC devices manufactured by various manufacturers. To address the second constraint, the SAE defines a message set dictionary under the J2735 standard for construction of device independent messages. This paper focuses on the deficiencies of the SAE J2735 standard being developed for deployment in Vehicular Ad-hoc Networks (VANET). In this regard, the paper discusses the way how a Basic Safety Message (BSM) as the fundamental message type defined in SAE J2735 is constructed, sent and received by safety communication platforms to provide a comprehensive device independent solution for Cooperative ITS (C-ITS). This provides some insight into the technical knowledge behind the construction and exchange of BSMs within VANET. A series of real-world DSRC data collection experiments was conducted. The results demonstrate that the reliability and throughput of DSRC highly depend on the applications utilizing the medium. Therefore, an active application-dependent medium control measure, using a novel message-dissemination frequency controller, is introduced. This application level message handler improves the reliability of both BSM transmissions/receptions and the Application layer error handling which is extremely vital to decentralized congestion control (DCC) mechanisms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PURPOSE We wanted to assess the effectiveness of a home-based physical activity program, the Depression in Late Life Intervention Trial of Exercise (DeLLITE), in improving function, quality of life, and mood in older people with depressive symptoms. METHODS We undertook a randomized controlled trial involving 193 people aged 75 years and older with depressive symptoms at enrollment who were recruited from primary health care practices in Auckland, New Zealand. Participants received either an individualized physical activity program or social visits to control for the contact time of the activity intervention delivered over 6 months. Primary outcome measures were function, a short physical performance battery comprising balance and mobility, and the Nottingham Extended Activities of Daily Living scale. Secondary outcome measures were quality of life, the Medical Outcomes Study 36-item short form, mood, Geriatric Depression Scale (GDS-15), physical activity, Auckland Heart Study Physical Activity Questionnaire, and self-report of falls. Repeated measures analyses tested the differential impact on outcomes over 12 months’ follow-up. RESULTS The mean age of the participants was 81 years, and 59% were women. All participants scored in the at–risk category on the depression screen, 53% had a Diagnostic and Statistical Manual of Mental Disorders or International Classification of Diseases, Tenth Revision diagnosis of major depression or scored more than 4 on the GDS-15 at baseline, indicating moderate or severe depression. Almost all participants, 187 (97%), completed the trial. Overall there were no differences in the impact of the 2 interventions on outcomes. Mood and mental health related quality of life improved for both groups. CONCLUSION he DeLLITE activity program improved mood and quality of life for older people with depressive symptoms as much as the effect of social visits. Future social and activity interventions should be tested against a true usual care control.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Portable water-filled road barriers (PWFB) are roadside structures placed on temporary construction zones to separate work site from moving traffic. Recent changes in governing standards require PWFB to adhere to strict compliance in terms of lateral displacement of the road barriers and vehicle redirectionality. Actual road safety barrier test can be very costly, thus researchers resort to Finite Element Analysis (FEA) in the initial designs phase prior to real vehicle test. There has been many research conducted on concrete barriers and flexible steel barriers using FEA, however not many is done pertaining to PWFB. This research probes a new method to model joint mechanism in PWFB. Two methods to model the joining mechanism are presented and discussed in relation to its practicality and accuracy to real work applications. Moreover, the study of the physical gap and mass of the barrier was investigated. Outcome from this research will benefit PWFB research and allow road barrier designers better knowledge in developing the next generation of road safety structures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The current program of research addresses the need for multi-level programs to target the major increase in injury rates that occurs throughout adolescence. Specifically, it involves the investigation of school connectedness as a protective factor for adolescent injury, and the development of school connectedness as a component of an injury prevention program. To date, school-based risk taking and injury prevention has frequently been limited to addressing adolescents' knowledge and attitudes to risk behaviours, and has largely overlooked the importance of the wider school social context as a protective factor in adolescent development. Additionally, school connectedness has been primarily studied in terms of its impact on student achievement, wellbeing and risk taking behaviour, and research has not yet addressed possible links with injury. Further, school connectedness intervention programs have targeted risk taking behaviours without evaluating their potential impact on injury outcomes. This is the first reported research to develop strategies to increase school connectedness as part of a school-based injury prevention program. The research program was conceptualised as three distinct stages. The development of these research stages was informed by a comprehensive review of the literature on adolescent risk taking, injury and school-based prevention, as well as on school connectedness and its importance in adolescence. A review of the school connectedness literature indicated that students' connectedness is largely influenced by relationships within the school context including with teachers and other school staff, and is therefore a potentially modifiable factor that may be targeted in school-based programs. Overall, the literature shows school connectedness to be a key protective factor in adolescent development. This review established a foundation from which the current program of research was designed. The first stage of the research involved an empirical investigation of the relationship between adolescent risk taking-related injuries and school connectedness. Stage one incorporated two studies. The first involved the development of a measure of adolescent injury, the Extended Adolescent Injury Checklist (E-AIC), for use in the current research as well as in future school-based studies and program evaluation. The results of this study also highlighted the extent of the problem of risk-related injury in adolescence. The second study in Stage one examined the relationship between students' reports of school connectedness, risk taking behaviour and risk taking-related injuries on the E-AIC. The results of this study showed significant relationships between increased school connectedness and reduced reported engagement in transport and violence risk taking, and fewer associated injuries. This study therefore suggested the potential for school-based injury prevention programs to incorporate strategies targeting increased adolescent connectedness to school. The second stage of this research involved the compilation of an evidence base to inform the design of a school connectedness intervention. Stage two also incorporated two studies. The first study in Stage two involved a systematic review of programs that have targeted school connectedness for reduced risk taking and injury. The results of this study revealed that interventions targeting school connectedness can be effective in reducing adolescent risk taking behaviour, and also provided an evidence base for the design of the current school connectedness intervention. The second study in Stage two examined teachers' understanding and perceptions of school connectedness. This qualitative study indicated that teachers consider students' connectedness to be an important factor that relates to their risk taking behaviour; and also provided directions and content for the intervention design stage. The third stage of this research built upon the findings of each of the previous studies, and involved the design, implementation and evaluation of a school connectedness intervention as a component of an adolescent injury prevention program, Skills for Preventing Injury in Youth (SPIY). This connectedness intervention was designed as a professional development workshop for teachers of 13 to 14 year old adolescents, and was developed as a complementary component to the curriculum-based SPIY program. The SPIY connectedness component was implemented and evaluated using process and six-month impact evaluation methodologies. The results of this study revealed that teachers saw value in the program and made use of the strategies presented, and that program school students' self-reported violence risk behaviour was reduced at six-month follow-up. Despite these promising findings, the results of this study did not demonstrate a significant impact of the program on change in students' connectedness to school, relative to comparison schools. The positive impact on self-reported violence risk behaviour was however replicated in additional analyses comparing students participating in the connectedness version of SPIY with students participating in an earlier curriculumonly version of the program. This finding indicated that the connectedness component has additional benefits relating to reduction in violence risks, over and above a curriculum-only version of the program. This research was the first reported to address the relationship between school connectedness and adolescent injury outcomes, and to develop school connectedness as a component of an adolescent injury prevention program. Overall, the results of this program of research have demonstrated the importance of incorporating strategies targeting the wider school social context, including school connectedness, in adolescent injury prevention programs. This research has important implications for future research and practice in adolescent injury prevention.