984 resultados para civil engineering


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Australia is the driest inhabited continent in the world and persisting droughts have triggered a move toward sensible and sustainable water consumption. Understanding how and where water is consumed in households enables streamlined development of demand management programs and efficient engineering of water infrastructure. End use water consumption analysis is required to gain necessary empirical data of how and where water is consumed. Several end use water consumption studies have been conducted within Australia and around the world with varying results produced. This pilot study paper provides preliminary data from the Gold Coast Watersaver End Use Project which is currently underway. Specifically, the paper includes water end use category volumetric and percentage break downs for 18 single and 32 dual reticulated homes on the Gold Coast (i.e. 50 in total). Moreover, a comparitive analysis between each of the individual households water end use levels is discussed along with other national studies previously completed. The paper finishes with an overview of the greater 200 home end use study conducted on the Gold Coast and its key deliverables and research outcomes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The concept of market-driven rather than product-driven quality management has been given prominence through the report of a recent inquiry into the performance of the Hong Kong construction industry. The report submitted to the Government of Hong Kong in 2001 establishes a new vision of ‘an integrated industry that is capable of continuous improvement towards excellence in the market-driven environment’. Given the current economic downturn, major contractors are facing many challenges to realize this new quality oriented vision. This paper addresses the critical and timely issue of applying quality management to the project delivery process in Hong Kong. The paper attempts to capture and critically examine management perceptions of quality management aspects as applied to a local large-scale road construction project. Based on the analysis of questionnaire feedback and face-to-face interviews, the paper reveals key attributes of a successful application of quality management approaches, and identifies a mechanism for facilitating such implementation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge management (KM) continues to receive mounting interest within the construction industry due to its potential to offer solutions for organisations seeking competitive advantage. This paper presents a KM input-process-output conceptual model comprising unique and well-defined theoretical constructs representing KM practices and their internal and external determinants in the context of construction. The paper also presents the underlying principles used in operationally defining each construct using extant KM literature, and offers a number of testable hypotheses that capture the inter-relationships between the identified constructs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Knowledge is a commodity. It is a by-product of learning that involves the creation, sharing, processing and possible use of information in the mind of an individual. Knowledge management (KM) is, therefore, concerned with the effective implementation of such activities within the organisation. It is simply the process of leveraging organisational knowledge to deliver a long-term competitive advantage. This paper presents the results of an empirical research investigation into the interaction between different KM activities within the context of construction contracting organisations. The different KM activities include: responsiveness to the knowledge of business environment, knowledge acquisition, knowledge dissemination, and knowledge application. A questionnaire survey was administered to investigate the opinions of construction professionals regarding the intensity of activities currently implemented by their organisations to facilitate knowledge capturing, sharing and application. A total of 149 responses were then used to statistically examine the inter-relationships between the different KM activities as practised by contracting organisations in Hong Kong. The paper presents and discusses the survey findings and proposes recommendations for improving the effectiveness of current KM practices.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

China’s national construction industry is now preparing to face the challenges, and to seize the opportunities, resulting from China’s entry to the World Trade Organisation (WTO). With the foreign direct investment (FDI) hitting a record high of around US$52.7 billion in 2002, China is believed to have now surpassed the USA as the world’s favorite destination for foreign investment. This fact, coupled with the huge potential for infrastructure development, indicates that the relatively large proportion of FDI flowing into the national construction industry will continue to increase in the foreseeable future. Positive aspects of FDI flowing will definitely help forging new industrial capabilities for China’s construction industry, thus helping it to achieve the ambitious strategic targets set by the Government for exporting construction goods and services. To shed some light on the position of the national industry in the global economy, this paper briefly presents the current international standing of China’s construction industry and qualitatively appraises potential positive influences of, and challenges associated with, FDI on the national industry.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper treats the blast response of a pile foundation in saturated sand using explicit nonlinear finite element analysis, considering complex material behavior of soil and soil–pile interaction. Blast wave propagation in the soil is studied and the horizontal deformation of pile and effective stresses in the pile are presented. Results indicate that the upper part of the pile to be vulnerable and the pile response decays with distance from the explosive. The findings of this research provide valuable information on the effects of underground explosions on pile foundation and will guide future development, validation and application of computer models.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sustainability needs to be embedded throughout the life-cycle of a construction project. From project conception, planning, design, construction stage, operation and maintenance to demolition, each phase of development should embrace principles of sustainability and the stakeholder involved should be empowered with the necessary skills. Past research explored the importance of ensuring sustainability measures during the occupancy phase based on considerations of Life-Cycle Cost Analysis and a project’s long-term detrimental impact on the environment. Facility managers are in a unique position to promote sustainability over longer periods of project engagement and can apply a high level of influence on the built assets through management and upgrades. There is growing interest among facility managers in incorporating sustainability measures into day-to-day practice. More, however, needs to be done. Previous studies have identified barriers such as the lack of sustainability knowledge and skills, poor access to information, and unwillingness to change among facility management (FM) practitioners and stakeholders. This inhibits proper implementation of sustainable practices in the FM sector. A number of key factors, such as knowledge discrepancy, time constraints, diversity of FM functions and a lack of incentives, require urgent remedy. The capability of FM professionals and stakeholders will be a key enabler in managing the sustainability agenda, as it is central to the improvement of competency and innovation in an organization. Compared to the attempts at developing sustainability guidelines and performance measurement, research efforts relating to people capabilities and skills are still lagging behind. This paper discusses the progress to date of a research project aimed at formulating a people capabilities framework for sustainable FM practices based on expert opinions and industry feedback. Through literature review, the paper explores the challenges of incorporating sustainability principles into general FM practices before focusing specifically on FM personnel capabilities that may impact on the implementation of a holistic sustainability agenda in real life practice. The results of an industry survey are used to propose an action framework to identify, promote and utilise people capabilities in order to promote sustainability integration in FM practices. The paper provides a useful information source for FM personnel and organizations to bridge the gap between extensive tools on sustainable design and construction assessment at the front end and the need to maintain focus throughout the project life-cycle.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In 2003, the Green Building Council of Australia (GBCA) launched their Green Star rating tools for various types of buildings in order to promote green building practice in Australia. Of these, the Green Star-Office Interior rating tool is designed for building owners, tenants and interior designers to assess the environmental impact of an interior fitout. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use and Ecology, Emissions, and Innovation. This paper reviews the usage of the Green Star system in Australian office tenancy fitouts and the potential challenges associated with Green Star-Office Interior implementation. This involves the analysis of score sheets of 66 office interior projects across Australia that achieved Green Star certification. The percentage of green star points obtained within each category and sub-categories (credits) for each project are investigated to illustrate the achievement of credits. The results show that Emission-related credits and Innovation related credits are the easiest and most difficult respectively to obtain. It is also found that 6 Green Star office interior projects perform especially better in the categories of Energy and Ecology than 4 and 5 Star projects. The investigation of point frequency in each category provides prospective Green Star applicants with insights into credit achievement for future projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A novel Glass Fibre Reinforced Polymer (GFRP) sandwich panel was developed by an Australian manufacturer for civil engineering applications. This research is motivated by the new applications of GFRP sandwich structures in civil engineering such as slab, beam, girder and sleeper. An optimisation methodology is developed in this work to enhance the design of GFRP sandwich beams. The design of single and glue laminated GFRP sandwich beam were conducted by using numerical optimisation. The numerical multi-objective optimisation considered a design two objectives simultaneously. These objectives are cost and mass. The numerical optimisation uses the Adaptive Range Multi-objective Genetic Algorithm (ARMOGA) and Finite Element (FE) method. Trade-offs between objectives was found during the optimisation process. Multi-objective optimisation shows a core to skin mass ratio equal to 3.68 for the single sandwich beam cross section optimisation and it showed that the optimum core to skin thickness ratio is 11.0.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.