Purpose – This paper seeks to examine how Public Private Partnerships (PPPs) have been affected by the global financial crisis (GFC). After briefly discussing PPPs and the GFC, the paper considers whether the latter has been a contributing factor in the declining number of projects reaching financial close.

Design/methodology/approach – The paper employs document content analysis to compare the time between notification of a project in the Official Journal of the European Union and its financial close in order to assess whether this period has increased since the beginning of the GFC. Two case studies are also presented.

Findings – Apart from a very small number of projects, the time between official project notification and financial close is lengthening, with the case studies providing some possible explanations for this.

Originality/value – Whilst Burger et al. provide some general statistics on the impact of the GFC on PPPs in a number of countries, this paper examines over 600 PPPs in the UK and supplements this analysis with two case studies, in order to assess whether the GFC has led to delays in projects reaching financial close.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

To help the building of new low-carbon housing, recent years have seen the widespread demolition of Victorian housing in UK cities. In this regard, Belfast is no different from its counterparts on the British mainland, where Compulsory Purchase Orders force people to sell and vacate their terraced homes to make way for newly constructed 'sustainable' housing. The global economic downturn has temporarily slowed down this process leaving many Belfast terraces now blocked up awaiting future demolition. This stay of execution is an unlikely but welcome opportunity to review and assess the true value to owner, streetscape and city of this important and common house-type. Important questions need to be asked. Should sound Victorian terraces be demolished? What is the genuine cost of demolition and replacement in terms of community and environment? With reference to case studies in a Belfast context, the argument will be made that new is not necessarily better, that the existing Victorian terrace is an important and valuable resource and one that, with intelligent intervention, offers a genuinely sustainable alternative to new-build housing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Keeping a record of operator experience remains a challenge to operation management and a major source of inefficiency in information management. The objective is to develop a framework that enables an explicit presentation of experience based on information use. A purposive sampling method is used to select four small and medium-sized enterprises as case studies. The unit of analysis is the production process in the machine shop. Data collection is by structured interview, observation and documentation. A comparative case analysis is applied. The findings suggest experience is an accumulation of tacit information feedback, which can be made explicit in information use interoperatability matrix. The matrix is conditioned upon information use typology, which is strategic in waste reduction. The limitations include difficulty of participant anonymity where the organisation nominates a participant. Areas for further research include application of the concepts to knowledge management and shop floor resource management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Exoplanet transit and Doppler surveys discover many binary stars during their operation that can be used to conduct a variety of ancillary science. Specifically, eclipsing binary stars can be used to study the stellar mass-radius relationship and to test predictions of theoretical stellar evolution models. By cross-referencing 24 binary stars found in the MARVELS Pilot Project with SuperWASP photometry, we find two new eclipsing binaries, TYC 0272-00458-1 and TYC 1422-01328-1, which we use as case studies to develop a general approach to eclipsing binaries in survey data. TYC 0272-00458-1 is a single-lined spectroscopic binary for which we calculate a mass of the secondary and radii for both components using reasonable constraints on the primary mass through several different techniques. For a primary mass of M 1 = 0.92 ± 0.1 M sun, we find M 2 = 0.610 ± 0.036 M sun, R 1 = 0.932 ± 0.076 R sun, and R 2 = 0.559 ± 0.102 R sun, and find that both stars have masses and radii consistent with model predictions. TYC 1422-01328-1 is a triple-component system for which we can directly measure the masses and radii of the eclipsing pair. We find that the eclipsing pair consists of an evolved primary star (M 1 = 1.163 ± 0.034 M sun, R 1 = 2.063 ± 0.058 R sun) and a G-type dwarf secondary (M 2 = 0.905 ± 0.067 M sun, R 2 = 0.887 ± 0.037 R sun). We provide the framework necessary to apply this analysis to much larger data sets.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In responding to the demand for change and improvement, local government has applied a plethora of operations management-based methods, tools and techniques. This article explores how these methods, specifically in the form of performance management models, are used to improve alignment between central government policy and local government practice, an area which has thus far been neglected in the literature. Using multiple case studies from Environmental Waste Management Services, this research reports that models derived in the private sector are often directly ‘implanted’ into the public sector. This has challenged the efficacy of all performance management models. However, those organisations which used models most effectively did so by embedding (contextualisation) and extending (reconceptualisation) them beyond their original scope. Moreover, success with these models created a cumulative effect whereby other operations management approaches were probed, adapted and used.